2800 South Terminal Road
Houston, TX 77032 · Houston Airport Systems
Transit shelters planned for Terminal A shuttle pickup
Houston Airport Systems registered a project to install pedestrian transit shelters at Terminal A's shuttle bus pickup location. The TDLR registration was filed January 13, 2025, and describes shelters intended to provide overhead protection from rain and sun. The applicant's estimated project cost is $110,525.
Summarized from Texas Department of Licensing and Regulation records · updated Jan 13, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jan 13, 2025
- since Jan 13, 2025
- Largest scope
- 250 sf
- Estimated cost
- $111K
- state registration
Where this project stands
CompletedInstall Transit Shelters at Terminal A
250 sq ft · $111K est.
- RegisteredJan 13, 2025
- Plan review
- ConstructionFeb '25 – Apr '25
- Inspected
- Closed
Ran as a 2-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectInstall pedestrian transit shelters at terminal a to provide overhead protection from rain and sun to commuters at shuttle bus pick-up location. — terminal a @ iah bush international airport
TDLR project registrationAdditions to Existing BuildingProject Closed250 sq ft$111K est.- Project #
- TABS2025009309
- Tenant / owner
- Install Transit Shelters At Terminal A
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2800 South Terminal Road
What is being built at 2800 South Terminal Road?
The project is for pedestrian transit shelters at Terminal A's shuttle bus pickup location at IAH. The shelters are intended to provide overhead protection from rain and sun.
When was the Terminal A shelter project filed?
The TDLR project registration was filed January 13, 2025. Its number is TABS2025009309.
Where will the new transit shelters be at IAH?
The registration places them at Terminal A's shuttle bus pickup location at Bush Intercontinental Airport.
How much will the Terminal A transit shelters cost?
The applicant's estimated cost for the project is $110,525. This is an estimate, not a confirmed final cost.
How large is the Terminal A shelter project?
The TDLR registration lists the project area as 250 square feet.
Are the Terminal A transit shelters near Houston Airport System Terminal A?
The project is at Terminal A, near the Houston Airport System Terminal A listing at 2800 North Terminal Road.
Is the Terminal A shelter project still open?
The TDLR record lists the project status as closed.
Also being built nearby
All of 77032- 3950 S TerminalJun 25, 2021United airlines pc air replacement-terminal e-bsg-2021-123-iah · 75 m away
- 3950 S Terminal E RdJun 21, 2024Starbucks 96773-1 - bsg-2024-135-iah · 75 m away
- 3950 S Terminal RdOct 21, 2025Chili?s - bsg-2024-328-iah · 75 m away
- 2800 North Terminal Road · Houston Airport System Terminal AApr 14, 2025Houston airport system – terminal a tsa north check point lane expansion project — renovation/alteration — renovation of existing north check point area. removal of existing glass partitions and by-pass vestibule. install additional full check point lane with associated equipment · 147 m away
- 2800 N Terminal Road Terminal A · City Of Houston Airport FacilitiesJul 15, 2024Simon biles taste of gold — renovation/alteration — restaurant tenant finish construction · 147 m away
- 2800 N Terminal Rd N/AFeb 20, 2019Ua alliant credit union repair in terminal e (i-19-030t) · 147 m away
- 2800 N Terminal Road Spaces C.n201.10 And C.n201.8 · Iah George Bush Intercontinental AirportFeb 12, 2025Iah velvet taco and latrelle's ice house — renovation/alteration — interior tenant buildout of concessions space for a restaurant and bar in iah airport. includes new partitions, millwork, ceilings, food equipment, finishes, electrical, mechanical, plumbing. 2,089 sq ft · 147 m away
- 2800 N Terminal Rd · Iah Terminal C GarageJan 22, 2024Iah terminal c helix ramp bearing and misc repairs — renovation/alteration — 1. project includes repair of cast-in-place concrete corbels and steel plates supporting two steel box girders at the north and south vehicle bridges that span between terminal c east garage helix and terminal c west garage. the girders are located a · 147 m away
- 2800 N Terminal Rd, B South, Space#20 · Iah Terminal B SouthJan 14, 2025The line sports grill- center bar — renovation/alteration — interior renovation to an exist. tenant space in terminal b south concourse. the scope will include a fabricated millwork bar and canopy, furniture, lighting, bar equipment, and architectural finishes. project served by exist. terminal restrooms · 147 m away
- 2800 N Terminal Rd Space# Tr-3 · Houston George Bush Intercontinental AirportMar 27, 2026Pandora — renovation/alteration — renovation of existing pandora store to a new pandora prototype. new finishes, fixtures, and equipment · 147 m away
- 2800 N Terminal Rd Unittar-8Jun 5, 2017Houston chronicle- term a/space #tar-8 (i-17-039c) · 147 m away
- 2800 N. Terminal Rd. 2800 N. Terminal Rd · Has Iah Terminal AFeb 23, 2024Hpd terminal a temporary relocation — renovation/alteration — interior renovation of terminal a. renovation to include modification of walls, new finishes & electrical · 147 m away