3100 N Terminal Rd Space Bne-19
Houston, TX 77032 · Houston Airport Systems
Neiman Marcus Espresso Bar fit-out planned at IAH
A 1,648-square-foot Neiman Marcus Espresso Bar & Café space is getting an interior finish-out at George Bush Intercontinental Airport. The TDLR project registration was filed May 6, 2026, and lists new interior finishes, seating, millwork, and mechanical, electrical, and plumbing work. The applicant estimates the project cost at $1.5 million.
Summarized from Texas Department of Licensing and Regulation records · updated May 6, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 6, 2026
- since May 6, 2026
- Largest scope
- 1,648 sf
- Estimated cost
- $1.5M
- state registration
Where this project stands
Finishing up · inspection nextNEIMAN MARCUS ESPRESSO BAR & CAFÉ
1,648 sq ft · $1.5M est.
- RegisteredMay 6, 2026
- Plan review
- ConstructionJun '26 – Oct '26
- Inspectednow
- Closed
Scheduled to finish Oct 22, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 4 phone numbers
Permit & project history
1 projectTenant finish out of an existing lease space. improvements shall include completefinish out of the interior to include new non-load bearing walls, ceiling, floor finishes, millwork, seating, structural, mechanical, electrical, and plumbing — george bush intercontinental airport
TDLR project registrationRenovation/AlterationReview Complete1,648 sq ft$1.5M est.- Project #
- TABS2026019610
- Tenant / owner
- Neiman Marcus Espresso Bar & Café
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3100 N Terminal Rd Space Bne-19
What is being built at 3100 N Terminal Road, Space BNE-19?
The project is an interior finish-out for Neiman Marcus Espresso Bar & Café in an existing airport lease space. The 1,648-square-foot project registration was filed May 6, 2026, as TABS2026019610.
Is Neiman Marcus Espresso Bar & Café opening at Houston airport?
A TDLR registration describes interior work for a Neiman Marcus Espresso Bar & Café space at George Bush Intercontinental Airport. The record does not give an opening date.
What work is planned for the Neiman Marcus Espresso Bar space?
The listed work includes new non-load-bearing walls, ceiling and floor finishes, millwork, seating, and structural, mechanical, electrical, and plumbing improvements. The registration was filed May 6, 2026.
How much will the Neiman Marcus Espresso Bar fit-out cost?
The applicant estimates the project cost at $1.5 million. This is the estimate listed in the TDLR registration, not a confirmed final cost.
What's going in near Auntie Anne's and Cinnabon at IAH?
A Neiman Marcus Espresso Bar & Café interior finish-out is registered for Space BNE-19 at 3100 N Terminal Road. The record lists the Auntie Anne's / Cinnabon space at the same address.
Has the Neiman Marcus Espresso Bar project been approved?
The TDLR registration, filed May 6, 2026, lists the status as “Review Complete.” The record describes a tenant finish-out in an existing lease space.
Also being built nearby
All of 77032- 3100 N Terminal Rd Tbf-3Feb 2, 2017El real storefront revision- i-17-006c
- 3100 N Terminal Rd New Terminal B N · City Of HoustonSep 18, 2025Cibo express gourmet market- space 9 — renovation/alteration — tenant fit out for a new grab and go market. scope of work includes new equipment, partitions, lighting, mep, finishes, and fire protection system
- 3100 N Terminal Blvd · Iah Terminal BApr 23, 2024Terminal b redovelopment - priority walls — renovation/alteration — new walls and doors for new boh rooms. steel fireproofing, extension to existing stairs, thermal insulation, and wall rough in for prep for future work electrical, telecom/security installation
- 3100 North Terminal Road · City Of Houston – Houston Airport System DivisionJun 5, 2026Iah ual vrct expansion — additions to existing building — new virtual ramp control tower and associated support spaces at the north end of the the west concourse of terminal b north. installation of mechanical, electrical, plumbing and telecom equipment in existing mechanical, electrical and telecom rooms
- 3100 N Terminal Rd Terminal B N · City Of HoustonSep 18, 2025Cibo express gourmet market- space 3 — renovation/alteration — tenant fit out for a new grab and go market. scope of work includes new equipment, partitions, lighting, mep, finishes and fire protection systems
- 3100 N Terminal Rd Spaces Bnw-6, Bnw-7, Bnw-7b, Bnw-7c · Houston Airport SystemsApr 29, 2026Bmg concessions fitout (katz coffe, protein bar & kitchen, jersey mike`s, and smash burger) — renovation/alteration — tenant fitout in new terminal addition for four (4) tenant spaces and general access seating area. tenant operators include katz coffee, protein bar, jersey mikes & smash burger
- 3100 N Terminal Rd Tbr-8Apr 10, 2018Rocky mountain candy factory interior remodel (i-18-021t)
- 3100 North Terminal Road, Terminal B, Level 3 · United Airlines - Terminal BDec 19, 2024Terminal b - fx breakroom — renovation/alteration — interior renovations for terminal b. remodel of existing space into break room which includes addition of new partition walls, reflected ceiling, lights, and millwork. proposed scope of work does not intend to change any life safety systems
- 3100 N Terminal Road · Iah - Terminal B South ConcourseJun 20, 2025Ua-- tbt terminal b south concourse - en-34 b south transfer pax b4 & b5 — renovation/alteration — gate b4 & b5 apron re-striping and equipment relocation for terminal b-c bus transfer
- 3100 N Terminal Rd Space Bne-15 · George Bush Intercontinental AirportApr 27, 2026Sky market — renovation/alteration — tenant finish out of an existing lease space. improvements shall include complete finish out of the interior to include new non-load bearing walls, ceiling, floor finishes, millwork, seating, structural, mechanical, electrical, and plumbing
- 3100 N Terminal Rd. Space · Houston Airport SystemsMar 12, 2026Rocky mountain chocolate factory and blue bell — renovation/alteration — tenant finish out of an existing lease space. improvements shall include complete finish out of the interior to include new non-load bearing walls, ceiling, floor finishes, millwork, seating, structural, mechanical, electrical and plumbing
- 3100 N Terminal BNov 15, 2018United airlines pc air and gpu replacement/terminal b (i-18-136t)
More restaurants in 77032.