9402 Pipestone St
Houston, TX 77074
9402 Pipestone St: 2 projects on record
Texas Department of Licensing and Regulation and City of Houston list 2 filings across 2 projects at 9402 Pipestone St, Houston, TX 77074. The most recent, filed September 28, 2017, covers: “3 phased proposed hike & bike trail along brays bayou and proposed pedestrian bridge. approx 48,000sf total — brays bayou”. The state accessibility registration estimates the project at $8.1M.
Compiled from Texas Department of Licensing and Regulation, City of Houston records · updated Sep 28, 2017
- Projects
- 2
- 2 filings
- Latest filing
- Sep 28, 2017
- since Sep 28, 2017
- Largest scope
- —
- Estimated cost
- $8.1M
- state registration
Where this project stands
Inspected · closing outProposed Upper Brays Bayou Greenway (BR26C)
48,000 sq ft · $8.1M est.
- RegisteredNov 18, 2025
- Plan review
- ConstructionNov '24 – May '26
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
2 projects3 phased proposed hike & bike trail along brays bayou and proposed pedestrian bridge. approx 48,000sf total — brays bayou
TDLR project registrationNew ConstructionInspection Complete48,000 sq ft$8.1M est.- Project #
- TABS2026006206
- Owner
- Proposed Upper Brays Bayou Greenway (br26c)
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation · City of Houston
Questions about 9402 Pipestone St
What is being built at 9402 Pipestone St?
The latest filing (TDLR project registration TABS2026006206, November 18, 2025) covers 3 phased proposed hike & bike trail along brays bayou and proposed pedestrian bridge. approx 48,000sf total — brays bayou.
How many permits and filings does 9402 Pipestone St have?
2 filings across 2 projects, from September 28, 2017 to September 28, 2017.
How much is the construction at 9402 Pipestone St worth?
The project's state registration lists an estimated cost of $8.1M.
Is there other construction near 9402 Pipestone St?
Yes. Nearby filings include 9411 Pipestone St (new residential solar panels, Jun 6, 2018); 9422 Pipestone St (residential repairs as per spec list, May 15, 2017); 9418 Pipestone St (residential foundation repairs (4 exterior and 10 interior piles), Apr 1, 2021).
How do I get alerts for new permits at 9402 Pipestone St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 77074- 9411 Pipestone StJun 6, 2018New residential solar panels · 27 m away
- 9422 Pipestone StMay 15, 2017Residential repairs as per spec list · 46 m away
- 9418 Pipestone StApr 1, 2021Residential foundation repairs (4 exterior and 10 interior piles) · 63 m away
- 8931 Sangamon LnMar 2, 2022Residential foundation repair · 94 m away
- 8923 Valley View LnDec 6, 2019Demolition res/sewer disc · 131 m away
- 8930 Sangamon LnApr 17, 2019Residential foundation repair (35 exterior piers) · 162 m away
- 9301 Southwest FwyMay 21, 2019Office expansion · 170 m away
- 8931 Valley View LnJan 23, 2017Residential flood damage repairs · 171 m away
- 8927 Valley View LnSep 7, 2017Res demolition/sewer disc · 173 m away
- 9015 Altamont DrOct 9, 2019D.b / residential / repairs · 172 m away
- 8919 Valley View LnApr 2, 2019Demolition res/sewer disc · 176 m away
- 8910 Sangamon LnSep 13, 2019Residential repair per spec list · 184 m away
More demolitions in 77074.