9301 Southwest Fwy
Houston, TX 77074
9301 Southwest Fwy: 4 projects on record
City of Houston lists 4 filings across 4 projects at 9301 Southwest Fwy, Houston, TX 77074 since April 5, 2017. The most recent, filed May 21, 2019, covers: “Office expansion”.
Compiled from City of Houston records · updated May 21, 2019
- Projects
- 4
- 4 filings
- Latest filing
- May 21, 2019
- since Apr 5, 2017
- Largest scope
- —
- Listed value
- —
Where this project stands
Permitted 2019 · no recent filingsOffice expansion
- Building permitMay 21, 2019
- Trade permits
- Occupancy
The city doesn't publish a status for this permit, so the stage is read from which permits have been filed.
Permit & project history
4 projectsSources: City of Houston
Questions about 9301 Southwest Fwy
What is being built at 9301 Southwest Fwy?
The latest filing (City of Houston permit 19044092, May 21, 2019) covers office expansion.
How many permits and filings does 9301 Southwest Fwy have?
4 filings across 4 projects, from April 5, 2017 to May 21, 2019.
What is being built near The Harris Center For Mental Health in Houston?
9301 Southwest Fwy is about 63 m from The Harris Center For Mental Health (9401 Southwest Freeway Level 1 Lobby). Its latest filing is for office expansion.
Is there other construction near 9301 Southwest Fwy?
Yes. Nearby filings include 9401 Southwest Fwy ((epr)remove & replace tap box for exstg office transformer, Aug 1, 2018); 9401 Southwest Freeway Level 1 Lobby (harris center lobby renovation — renovation/alteration — this project consists of limited renovation in the existing lobby. new construction is limited to new reception desk millwork and wall mounted tv. new paint throughout the lobby approximately 2,260 sq ft no change to occupancy, Dec 20, 2024); 9418 Pipestone St (residential foundation repairs (4 exterior and 10 interior piles), Apr 1, 2021).
How do I get alerts for new permits at 9301 Southwest Fwy?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 77074- 9401 Southwest FwyAug 1, 2018(epr)remove & replace tap box for exstg office transformer · 63 m away
- 9401 Southwest Freeway Level 1 Lobby · The Harris Center For Mental HealthDec 20, 2024Harris center lobby renovation — renovation/alteration — this project consists of limited renovation in the existing lobby. new construction is limited to new reception desk millwork and wall mounted tv. new paint throughout the lobby approximately 2,260 sq ft no change to occupancy · 63 m away
- 9418 Pipestone StApr 1, 2021Residential foundation repairs (4 exterior and 10 interior piles) · 165 m away
- 9402 Pipestone StSep 28, 2017Res demolition/sewer disc · 170 m away
- 9400 Southwest Freeway · Group 1 Automotive, Inc.Apr 5, 2024Sterling mccall toyota — additions to existing building — interior renovation to the entire existing first floor of the building. building addition on the south side of the building for automobile service drop-off. no scope of work at existing second floor · 176 m away
- 9422 Pipestone StMay 15, 2017Residential repairs as per spec list · 180 m away
- 9411 Pipestone StJun 6, 2018New residential solar panels · 186 m away
- 8923 Valley View LnDec 6, 2019Demolition res/sewer disc · 239 m away
- 8931 Sangamon LnMar 2, 2022Residential foundation repair · 246 m away
- 9015 Altamont DrOct 9, 2019D.b / residential / repairs · 246 m away
- 9525 Southwest FwyDec 20, 2017Demolition of interior non-load bearing non fire rated walls · 253 m away
- 9527 Southwest FwyDec 20, 2017Demolition of interior non-load bearing non fire rated walls · 259 m away