9418 Pipestone St
Houston, TX 77074
9418 Pipestone St: 1 project on record
City of Houston lists 1 filing across 1 project at 9418 Pipestone St, Houston, TX 77074. The most recent, filed April 1, 2021, covers: “Residential foundation repairs (4 exterior and 10 interior piles)”.
Compiled from City of Houston records · updated Apr 1, 2021
- Projects
- 1
- 1 filings
- Latest filing
- Apr 1, 2021
- since Apr 1, 2021
- Largest scope
- —
- Listed value
- —
Where this project stands
Permitted 2021 · no recent filingsResidential foundation repairs (4 exterior and 10 interior piles)
- Building permitApr 1, 2021
- Trade permits
- Occupancy
The city doesn't publish a status for this permit, so the stage is read from which permits have been filed.
Permit & project history
1 projectSources: City of Houston
Questions about 9418 Pipestone St
What is being built at 9418 Pipestone St?
The latest filing (City of Houston permit 21024852, April 1, 2021) covers residential foundation repairs (4 exterior and 10 interior piles).
How many permits and filings does 9418 Pipestone St have?
1 filing across 1 project, from April 1, 2021 to April 1, 2021.
What is being built near The Harris Center For Mental Health in Houston?
9418 Pipestone St is about 194 m from The Harris Center For Mental Health (9401 Southwest Freeway Level 1 Lobby). Its latest filing is for residential foundation repairs (4 exterior and 10 interior piles).
Is there other construction near 9418 Pipestone St?
Yes. Nearby filings include 9422 Pipestone St (residential repairs as per spec list, May 15, 2017); 9411 Pipestone St (new residential solar panels, Jun 6, 2018); 9402 Pipestone St (res demolition/sewer disc, Sep 28, 2017).
How do I get alerts for new permits at 9418 Pipestone St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 77074- 9422 Pipestone StMay 15, 2017Residential repairs as per spec list · 25 m away
- 9411 Pipestone StJun 6, 2018New residential solar panels · 50 m away
- 9402 Pipestone StSep 28, 2017Res demolition/sewer disc · 63 m away
- 8931 Sangamon LnMar 2, 2022Residential foundation repair · 85 m away
- 9015 Altamont DrOct 9, 2019D.b / residential / repairs · 113 m away
- 9301 Southwest FwyMay 21, 2019Office expansion · 165 m away
- 8930 Sangamon LnApr 17, 2019Residential foundation repair (35 exterior piers) · 166 m away
- 8939 Altamont DrNov 6, 2018Residential foundation repairs · 181 m away
- 8910 Sangamon LnSep 13, 2019Residential repair per spec list · 190 m away
- 9401 Southwest FwyAug 1, 2018(epr)remove & replace tap box for exstg office transformer · 194 m away
- 9401 Southwest Freeway Level 1 Lobby · The Harris Center For Mental HealthDec 20, 2024Harris center lobby renovation — renovation/alteration — this project consists of limited renovation in the existing lobby. new construction is limited to new reception desk millwork and wall mounted tv. new paint throughout the lobby approximately 2,260 sq ft no change to occupancy · 194 m away
- 8923 Valley View LnDec 6, 2019Demolition res/sewer disc · 194 m away