9400 Southwest Freeway
Houston, TX 77074 · Group 1 Automotive, Inc.
Sterling McCall Toyota renovation and service drop-off addition
A renovation of Sterling McCall Toyota’s existing first floor and a south-side addition for automobile service drop-off were registered on April 5, 2024. The TDLR registration lists an estimated project cost of $7.5 million.
Summarized from Texas Department of Licensing and Regulation records · updated Apr 5, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Apr 5, 2024
- since Apr 5, 2024
- Largest scope
- 104,000 sf
- Estimated cost
- $7.5M
- state registration
Where this project stands
Inspected · closing outSterling McCall Toyota
104,000 sq ft · $7.5M est.
- RegisteredApr 5, 2024
- Plan review
- ConstructionOct '24 – Oct '25
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectInterior renovation to the entire existing first floor of the building. building addition on the south side of the building for automobile service drop-off. no scope of work at existing second floor. — sterling mccall toyota
TDLR project registrationAdditions to Existing BuildingInspection Complete104,000 sq ft$7.5M est.- Project #
- TABS2024015515
- Tenant / owner
- Sterling Mccall Toyota
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 9400 Southwest Freeway
What is being built at 9400 Southwest Freeway?
The project includes renovation of the existing building’s first floor and a south-side addition for automobile service drop-off. The TDLR registration was filed April 5, 2024, under project number TABS2024015515.
Is Sterling McCall Toyota being renovated in Houston?
Yes. The April 5, 2024, TDLR registration describes an interior renovation of the entire existing first floor at Sterling McCall Toyota, plus an addition for service drop-off.
What is the new addition at Sterling McCall Toyota for?
The registration says the addition on the south side of the building is for automobile service drop-off.
Is work planned on the second floor at 9400 Southwest Freeway?
The TDLR project description says there is no scope of work on the existing second floor.
How much will the Sterling McCall Toyota project cost?
The TDLR registration lists an estimated cost of $7.5 million for the project. This is the applicant’s estimate, not a confirmed final cost.
What is being built near The Harris Center for Mental Health on Southwest Freeway?
A TDLR registration for Sterling McCall Toyota, at 9400 Southwest Freeway, describes a first-floor renovation and a south-side service drop-off addition. The Harris Center for Mental Health is listed about 232 meters away.
Also being built nearby
All of 77074- 9301 Southwest FwyMay 21, 2019Office expansion · 176 m away
- 8923 Valley View LnDec 6, 2019Demolition res/sewer disc · 183 m away
- 9402 Pipestone StSep 28, 2017Res demolition/sewer disc · 226 m away
- 9401 Southwest FwyAug 1, 2018(epr)remove & replace tap box for exstg office transformer · 232 m away
- 9401 Southwest Freeway Level 1 Lobby · The Harris Center For Mental HealthDec 20, 2024Harris center lobby renovation — renovation/alteration — this project consists of limited renovation in the existing lobby. new construction is limited to new reception desk millwork and wall mounted tv. new paint throughout the lobby approximately 2,260 sq ft no change to occupancy · 232 m away
- 9411 Pipestone StJun 6, 2018New residential solar panels · 253 m away
- 9334 Mahoning DrJul 24, 2018Demolition res/sewer disc · 255 m away
- 9330 Mahoning DrJul 24, 2018Demolition res/sewer disc · 259 m away
- 9326 Mahoning DrApr 6, 2017Demolition res/sewer disc · 263 m away
- 9422 Pipestone StMay 15, 2017Residential repairs as per spec list · 265 m away
- 9322 Mahoning DrMay 31, 2018Harvey storm damage repair per spec list · 268 m away
- 9418 Pipestone StApr 1, 2021Residential foundation repairs (4 exterior and 10 interior piles) · 267 m away