Harris County MUD 418 files replat for Water Plant No. 3

A 4.635-acre site is designated for water treatment, production or repressurization as Harris County MUD No. 418 Water Plant No. 3. The record is a Class 2 subdivision replat, application 2022-2218, with planning commission dates listed as September 15 and September 29, 2022; it does not specify a construction permit date.

Lots
—
Acres
4.63
Next / last hearing
Sep 29, 2022
School district
—

Application

TypeClass 2 subdivision replat
DeveloperBridgeland Development, LP a Maryland limited partnership
Engineer / surveyorBGE, Inc.
SubmittedSeptember 2, 2022

Planning Commission history

  1. September 15, 2022Listed
  2. September 29, 2022Listed

Questions about Harris County MUD no 418 Water Plant no 3

What is planned at Harris County MUD No. 418 Water Plant No. 3?

The 4.635-acre site is designated for water treatment, production or repressurization. The record is a Class 2 subdivision replat, not a construction permit.

Where is Harris County MUD No. 418 Water Plant No. 3?

The subdivision record places it in Harris County, ZIP code 77447.

When was the Water Plant No. 3 replat considered?

Application 2022-2218 lists planning commission dates of September 15 and September 29, 2022.

Who is developing Harris County MUD No. 418 Water Plant No. 3?

The record names Bridgeland Development, LP as the developer.

How large is the Water Plant No. 3 site?

The replat record lists the site at 4.635 acres.

Is there a construction start date for Water Plant No. 3?

The record does not provide a construction start date. It lists a Class 2 subdivision replat application and planning commission dates in September 2022.