Garrett Complex
Houston · 77044 · Harris County
Garrett Complex 10-acre subdivision replat
A Class 2 subdivision replat for Garrett Complex covers 10 acres and one lot; the application lists commercial and single-family residential (public street) land uses. Application 2023-1258 has a Planning Commission date of July 13, 2023.
- Lots
- 1
- Acres
- 10.00
- Next / last hearing
- Jul 13, 2023
- School district
- Sheldon ISD
Application
Planning Commission history
- July 13, 2023Listed
Questions about Garrett Complex
What is planned for Garrett Complex?
Application 2023-1258 is a Class 2 subdivision replat covering 10 acres and one lot. It lists commercial and single-family residential (public street) land uses.
Where is Garrett Complex?
The subdivision record places Garrett Complex in ZIP code 77044 in Harris County.
How many lots are in the Garrett Complex replat?
The application lists one lot across 10 acres.
When was the Garrett Complex subdivision application considered?
The record lists a Planning Commission date of July 13, 2023, for application 2023-1258.
Who is the developer for Garrett Complex?
The application names 11717 Garrett Inc as the developer and Owens Management Systems, LLC as the engineer or surveyor.
Other plats in 77044
- Lakeside Terrace EnclaveDec 3, 20262 lots · 0.95 ac · Single Family Residential (PAE 1/PAE 2) · Lake Houston
- Generation Park East Sec 8Dec 3, 202641.27 ac · Unrestricted · 77044
- Generation Park South Sec 3Dec 3, 20269.09 ac · Unrestricted; Lift Station · 77044
- Reserve at AqueductDec 3, 20265.00 ac · Unrestricted · 77044
- Reserve at North Lake HoustonDec 3, 202610.00 ac · Unrestricted · 77044
- Generation Park East Sec 5Dec 3, 2026500.70 ac · Unrestricted · 77044
- Generation Park East Sec 2Dec 3, 2026238.53 ac · Unrestricted; Landscape or Open Space · 77044
- Anchor Liberty ChannelOct 29, 202672.42 ac · Unrestricted · 77044
Commercial construction in 77044
- 13460 Lockwood Drive · Ftitx001 LLCNov 5, 2026Technip fmc racking — renovation/alteration — installation of storage racks in existing warehouse
- 0 Common Dock · Mitsubishi Power Americas, INCOct 28, 2026Mitsubishi power — new construction — build a new industrial office/training/shop building of pre-engineered metal & steel frame with tilt-wall construction, and parking lot
- 12550 Timber Forest Drive · Eli Lilly And CompanyOct 26, 2026Lilly houston campus — new construction — exterior shell package only. interior build out to be submitted separately
- 14315 E Sam Houston Pkwy N · Lake Houston Beltway Associates LLCOct 26, 2026Results physiotherapy - atascocita — renovation/alteration — tenant buildout of suite in an existing tenant building
- 12190 N Lake Houston Pkwy Houston, TX 77044 · Northlake DevelopmentOct 21, 2026Northlake development — new construction — construction of (1) 158,040 sq ft one story tilt wall building with associated site work
- 10803 W Lake Houston Pkwy, Houston, TX 77044 · Generation Park Management DistrictOct 19, 2026Mid-block pedestrian crossings at west lake houston parkway — renovation/alteration — the scope includes 2 mid-block pedestrian crossings across an existing major thoroughfare, including traffic signs and equipment, curb ramps, pavement modifications, striping, and connection to existing sidewalks