1211 W. Travis St
San Antonio, TX 78207 · Bexar County
Bexar County plans two elevator upgrades at its ADC annex
Bexar County plans to upgrade two existing hydraulic elevators at its Adult Detention Center annex at 1211 W. Travis St. The Texas Department of Licensing and Regulation registration was filed August 27, 2025, for renovation work. The applicant’s estimated project cost is $800,000.
Summarized from Texas Department of Licensing and Regulation records · updated Aug 27, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 27, 2025
- since Aug 27, 2025
- Largest scope
- 300 sf
- Estimated cost
- $800K
- state registration
Where this project stands
Finishing up · inspection nextBexar County ADC Annex Elevator Upgrade
300 sq ft · $800K est.
- RegisteredAug 27, 2025
- Plan review
- ConstructionOct '25 – Jul '26
- Inspectednow
- Closed
Scheduled to finish Jul 31, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectBexar county adc intends to upgrade two existing hydraulic elevators, designated as elevators #1 and #2, located in the annex building. these elevators are critical to moving inmates, meals, medications, and staff to housing units on the second floor — bexar county adc annex
TDLR project registrationRenovation/AlterationReview Complete300 sq ft$800K est.- Project #
- TABS2025026855
- Tenant / owner
- Bexar County Adc Annex Elevator Upgrade
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1211 W. Travis St
What is being built at 1211 W. Travis St.?
The project is an upgrade to two existing hydraulic elevators, not a new building. The elevators are in the Bexar County Adult Detention Center annex.
What is planned near Bexar County?
Bexar County plans to upgrade elevators at its Adult Detention Center annex at 1211 W. Travis St., near Bexar County at 200 N. Comal St. The project registration was filed August 27, 2025.
Which elevators will be upgraded at the Bexar County ADC annex?
The registration describes upgrades to existing hydraulic elevators #1 and #2. It says the elevators serve the second-floor housing units.
When was the Bexar County elevator project registered?
The Texas Department of Licensing and Regulation registration was filed August 27, 2025. The project number is TABS2025026855.
How much will the Bexar County ADC annex elevator upgrade cost?
The applicant’s estimated cost for the project is $800,000. This is an estimate listed in the TDLR registration.
Is a new building being built at 1211 W. Travis St.?
The registration describes renovation work to two existing elevators in the annex, not construction of a new building.
What will the elevator upgrades at the ADC annex support?
The registration says the elevators are used to move inmates, meals, medications, and staff to housing units on the second floor.
Also being built nearby
All of 78207- 200 N Comal St · Bexar CountySep 13, 2024Bexar country adult detention center locker room renovation — renovation/alteration — renovation of 3,224 sq ft locker room, restrooms and shower areas. replace existing plumbing fixtures and lockers. demolition floor and wall tile in shower areas and replace with epoxy. new ceiling, hvac grilles and light · 99 m away
- 200 N. Comal Street · Bexar CountyFeb 6, 2026Bexar county adult detention center annex kitchen upgrades 2025 — renovation/alteration — total sq ft 3069 includes upgrades to floor and wall finishes, gas pipe upgrades, door upgrades and floor drains · 99 m away
- 909 W. Houston St · Centro Plaza Transit CenterOct 3, 2024Centro plaza infrastructure systems repair — renovation/alteration — this project consists of intervening in the central portion of the existing plaza to regrade and provide supports to correct and mitigate changes in level · 377 m away
- 903 W. Martin Street · Bexar County Hospital DistrictJul 22, 20264th floor women's heath — renovation/alteration — convert waiting room to ultrasound room · 546 m away
- 903 W Martin St · University HealthAug 16, 2024Robert b green 6th floor uma office renovations — renovation/alteration — install permanent walls in place of office wall system. install new doors and windows. adjust mechanical, electrical and fire sprinkler systems · 546 m away