903 W. Martin Street
San Antonio, TX 78207 · 4th Floor Women's Heath, UH Robert B Green 6th Floor Toilet Rooms
Waiting room conversion to ultrasound room at 903 W. Martin
A waiting room is being converted into an ultrasound room at the Robert B. Green Clinical Pavilion at 903 W. Martin Street. The 325-square-foot renovation was registered with TDLR on July 22, 2026, and its status is listed as Review Complete. The applicant's estimated project cost is $125,000.
Summarized from Texas Department of Licensing and Regulation records · updated Jul 22, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jul 22, 2026
- since Jul 22, 2026
- Largest scope
- 325 sf
- Estimated cost
- $250K
- state registration
Where this project stands
Under construction4th Floor Women's Heath
325 sq ft · $125K est.
- RegisteredJul 22, 2026
- Plan review
- ConstructionSep '26 – Apr '27
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
2 projectsConvert waiting room to ultrasound room — robert b green clinical pavilion
TDLR project registrationRenovation/AlterationReview Complete325 sq ft$125K est.- Project #
- TABS2026025912
- Tenant / owner
- 4th Floor Women's Heath
- Design firm
- Pro
- Contact
- Pro
Interior renovations to convert a storage room to womens and mens toilet rooms. ceiling work will be required on two floors. the conversion will require new mechanical, electrical, and plumbing work will be required. new walls and finishes — university health - robert b green clinical provision
TDLR project registrationRenovation/AlterationProject Closed400 sq ft$250K est.- Project #
- TABS2023021516
- Tenant / owner
- UH Robert B Green 6th Floor Toilet Rooms
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 903 W. Martin Street
What is being built at 903 W. Martin Street?
A waiting room at the Robert B. Green Clinical Pavilion is being converted into an ultrasound room. The TDLR registration describes a 325-square-foot renovation.
When was the ultrasound room project at 903 W. Martin registered?
The project was registered with TDLR on July 22, 2026. Its status is listed as Review Complete.
How large is the renovation at 903 W. Martin Street?
The TDLR registration lists the project at 325 square feet.
How much will the 903 W. Martin renovation cost?
The applicant's estimated cost is $125,000. This is an estimate for the project, not a reported final cost.
What's being renovated near Sleep Lab Renovations at 333 N. Santa Rosa Street?
At 903 W. Martin Street, a waiting room at the Robert B. Green Clinical Pavilion is being converted into an ultrasound room. The project was registered with TDLR on July 22, 2026.
Also being built nearby
All of 78207- 903 W Martin St · University HealthAug 16, 2024Robert b green 6th floor uma office renovations — renovation/alteration — install permanent walls in place of office wall system. install new doors and windows. adjust mechanical, electrical and fire sprinkler systems
- 414 N. San Saba · Christus HealthMay 21, 2024Rise school of san antonio — renovation/alteration — renovation of project area into a preschool · 270 m away
- 315 N San Saba · San Antonio Mob Santa Rosa, LLCJan 8, 2025Santa rosa pavilion, suite 1250 — renovation/alteration — interior renovation · 330 m away
- 816 Camaron St · University Of Texas HealthJan 11, 2024Uthsc mcdermott research building — renovation/alteration — renovate the mri room, offices, millwork that includes, new paint, flooring and new ceilings · 331 m away
- 909 W. Houston St · Centro Plaza Transit CenterOct 3, 2024Centro plaza infrastructure systems repair — renovation/alteration — this project consists of intervening in the central portion of the existing plaza to regrade and provide supports to correct and mitigate changes in level · 367 m away
- 333 N Santa Rosa St · Christus Santa Rosa Health Care CorporationFeb 20, 2026Hazmat room conversion — renovation/alteration — interior renovation · 474 m away
- 333 N. Santa Rosa Street · Christus Santa Rosa Health Care CorporationJul 30, 2026Sleep lab renovations — renovation/alteration — the renovation of approximately 5,000 sq ft on the second floor of children's hospital for the use of a sleep lab · 474 m away
- 333 N. Santa Rosa St., 2nd · Christus Santa Rosa Health Care CorporationAug 25, 2026Christus children's dialysis — renovation/alteration — interior renovation · 474 m away
- 200 N. Comal Street · Bexar CountyFeb 6, 2026Bexar county adult detention center annex kitchen upgrades 2025 — renovation/alteration — total sq ft 3069 includes upgrades to floor and wall finishes, gas pipe upgrades, door upgrades and floor drains · 498 m away
- 200 N Comal St · Bexar CountySep 13, 2024Bexar country adult detention center locker room renovation — renovation/alteration — renovation of 3,224 sq ft locker room, restrooms and shower areas. replace existing plumbing fixtures and lockers. demolition floor and wall tile in shower areas and replace with epoxy. new ceiling, hvac grilles and light · 498 m away
- 109 North San Saba · Nalcab Offices - San AntonioJun 18, 2025Nalcab offices - san antonio — renovation/alteration — fit out of a two-story building for nalcab’s office, approximately 16,044 sq ft, including mainly interior scope with some exterior and site improvements · 502 m away
- 1211 W. Travis St · Bexar CountyAug 27, 2025Bexar county adc annex elevator upgrade — renovation/alteration — bexar county adc intends to upgrade two existing hydraulic elevators, designated as elevators #1 and #2, located in the annex building. these elevators are critical to moving inmates, meals, medications, and staff to housing units on the second floor · 546 m away