200 N Comal St
San Antonio, TX 78207 · Bexar Country Adult Detention Center Locker Room Renovation, Bexar County Adc Employee Health Clinic
Bexar County detention center locker room renovation
A renovation of the Bexar County Adult Detention Center’s 3,224-square-foot locker room, restrooms and showers was registered on September 13, 2024. The work includes replacing plumbing fixtures and lockers, updating shower surfaces, and installing a new ceiling, HVAC grilles and lighting. The applicant’s estimated project cost is $765,877.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 13, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Sep 13, 2024
- since Sep 13, 2024
- Largest scope
- 3,224 sf
- Estimated cost
- $766K
- state registration
Where this project stands
Finishing up · inspection nextBexar Country Adult Detention Center Locker Room Renovation
3,224 sq ft · $766K est.
- RegisteredSep 13, 2024
- Plan review
- ConstructionDec '24 – Apr '25
- Inspectednow
- Closed
Scheduled to finish Apr 30, 2025; the state inspection hasn't been filed yet.
4 contacts on this project · 2 phone numbers
Permit & project history
2 projectsRenovation of 3,224 sq ft locker room, restrooms and shower areas. replace existing plumbing fixtures and lockers. demolition floor and wall tile in shower areas and replace with epoxy. new ceiling, hvac grilles and light. — adult detention center
TDLR project registrationRenovation/AlterationReview Complete3,224 sq ft$766K est.- Project #
- TABS2025001008
- Tenant / owner
- Bexar Country Adult Detention Center Locker Room Renovation
- Design firm
- Pro
- Contact
- Pro
Interior demolition of existing employee office space and built-out of small clinic to contain exam rooms, offices, medical storage, general storage, lobby space, restroom, and point-of-care room. — bexar county adult detention center - employee clinic
TDLR project registrationRenovation/AlterationInspection Complete2,000 sq ft$200K est.- Project #
- TABS2023014393
- Tenant / owner
- Bexar County Adc Employee Health Clinic
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 200 N Comal St
What is being built at 200 N Comal St in San Antonio?
A 3,224-square-foot renovation of the Bexar County Adult Detention Center’s locker room, restrooms and shower areas was registered with TDLR on September 13, 2024.
Is a new building being built at 200 N Comal St?
The TDLR record describes a renovation, not new construction. It covers locker room, restroom and shower areas at the adult detention center.
What work is planned for the detention center locker room?
The registration describes replacing plumbing fixtures and lockers, removing and replacing shower-area tile with epoxy, and installing a new ceiling, HVAC grilles and lighting.
How much will the Bexar County detention center renovation cost?
The TDLR registration lists an applicant estimate of $765,877 for the project.
When was the locker room renovation registered?
The project was registered on September 13, 2024, under TDLR number TABS2025001008.
What is being renovated near Centro Plaza Transit Center?
At 200 N Comal St, about 404 meters from Centro Plaza Transit Center, a TDLR registration describes renovations to the Bexar County Adult Detention Center locker room, restrooms and showers.
Also being built nearby
All of 78207- 200 N. Comal Street · Bexar CountyFeb 6, 2026Bexar county adult detention center annex kitchen upgrades 2025 — renovation/alteration — total sq ft 3069 includes upgrades to floor and wall finishes, gas pipe upgrades, door upgrades and floor drains
- 1211 W. Travis St · Bexar CountyAug 27, 2025Bexar county adc annex elevator upgrade — renovation/alteration — bexar county adc intends to upgrade two existing hydraulic elevators, designated as elevators #1 and #2, located in the annex building. these elevators are critical to moving inmates, meals, medications, and staff to housing units on the second floor · 99 m away
- 909 W. Houston St · Centro Plaza Transit CenterOct 3, 2024Centro plaza infrastructure systems repair — renovation/alteration — this project consists of intervening in the central portion of the existing plaza to regrade and provide supports to correct and mitigate changes in level · 404 m away
- 903 W. Martin Street · Bexar County Hospital DistrictJul 22, 20264th floor women's heath — renovation/alteration — convert waiting room to ultrasound room · 498 m away
- 903 W Martin St · University HealthAug 16, 2024Robert b green 6th floor uma office renovations — renovation/alteration — install permanent walls in place of office wall system. install new doors and windows. adjust mechanical, electrical and fire sprinkler systems · 498 m away
More demolitions in 78207.