117 E French Pl
San Antonio, TX 78212 · San Antonio Academy
San Antonio Academy registered two campus welcome centers
Two new welcome centers were registered for construction at San Antonio Academy on July 2, 2024. The structures are intended to monitor campus vehicle entrances during school hours; the applicant estimated the project cost at $1 million.
Summarized from Texas Department of Licensing and Regulation records · updated Jul 2, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jul 2, 2024
- since Jul 2, 2024
- Largest scope
- 72 sf
- Estimated cost
- $1.0M
- state registration
Where this project stands
CompletedSan Antonio Academy Welcome Centers
72 sq ft · $1.0M est.
- RegisteredJul 2, 2024
- Plan review
- ConstructionSep '24 – Jan '25
- Inspected
- Closed
Ran as a 5-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectTwo new welcome centers to enhance the entry experience and strengthen security on campus. structures to be used by single occupant during school hours to monitor vehicular entrances on campus. — east & west welcome centers
TDLR project registrationNew ConstructionProject Closed72 sq ft$1.0M est.- Project #
- TABS2024022205
- Tenant / owner
- San Antonio Academy Welcome Centers
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 117 E French Pl
What is being built at 117 E French Pl?
Two welcome centers are planned for San Antonio Academy to monitor vehicle entrances during school hours. The TDLR registration, TABS2024022205, is dated July 2, 2024.
What are the San Antonio Academy welcome centers for?
The project description says the two structures are intended to monitor vehicular entrances on campus during school hours and strengthen campus security.
When was the San Antonio Academy welcome center project registered?
The project was registered with the Texas Department of Licensing and Regulation on July 2, 2024. Its registration number is TABS2024022205.
How much will the San Antonio Academy welcome centers cost?
The applicant estimated the project cost at $1 million. This is an estimate for the project, not a final reported cost.
How many welcome centers are planned at San Antonio Academy?
The project description specifies two new welcome centers, one east and one west.
Are the welcome centers near San Antonio Academy of Texas?
Yes. The project is at San Antonio Academy, listed at the same address, 117 E French Place.
Also being built nearby
All of 78212- 117 E French Place · San Antonio Academy Of TexasAug 3, 2026San antonio academy - classroom portables — new construction — place (3) new classroom portables on site with associated utitlies for temporary use
- 2100 N. Main Ave · Headwall InvestmentsSep 16, 2024South bbq — additions to existing building — remodel 1,083 sq ft of existing building for restaurant dining and add on 1,440 sq ft of restroom and back of house kitchen space · 121 m away
- 2101 Mccullough Ave · Headwall Investments LLCMar 7, 2024Tbg remodel — renovation/alteration — interior remodel of existing interior finish out · 200 m away
- 121 W. Courtland Place · Alamo Community Colleges DistrictAug 6, 2026Sac lrtf _ interior renovations — renovation/alteration — 30,240 new wall paint throughout, new sealed concrete at cooridors, new carpet in select areas, new lvt in select areas, damaged existing act replaced, new ada bottle filling station and new benches in lobby · 242 m away
- 310 W. Ashby · Too Legit To Split, LLCMay 28, 2025Koehler house landscape and site improvements — renovation/alteration — renovation to the existing historic koehler house site including new sidewalks, parking, fencing, and playground · 315 m away
- 510 Belknap St · Christ Episcopal ChurchJul 17, 2026Christ episcopal church columbarium expansion — renovation/alteration — add two columbaria, add planter / seat wall, relocate existing fence and pedestrian gate, renovate existing stone paving, misc. drainage and landscape improvements · 382 m away
- 2611 N Main St · 2611 N MainJun 25, 2024The new office for kim ross md — renovation/alteration — interior finish - remodel existing structure update electrical plumbing and hvac · 429 m away
- 1819 North Main Avenue · Alamo Colleges DistrictFeb 14, 2024Mtn tax note program - sac package 6 - central plant — renovation/alteration — reseal concrete floors, repair windows/window graphics, replace water heater, replace vfds, replace refrigerant monitoring system, ddc controls systems replacement, mcc replacement, and fire alarm replacement · 442 m away
- 1819 N. Main Ave · Alamo Colleges DistrictApr 15, 2024Sac mtn package #4: sac nail technical center renovation — renovation/alteration — renovation of existing building. the scope of the work consists of upgrades and improvements to the electric water heater, ahu replacements, replace light fixtures, video surveillance upgrades, replacement of ductless split systems, access control · 442 m away
- 1819 N Main Ave · Alamo Colleges DistrictJan 28, 2025Alamo colleges - sac portable relocation — renovation/alteration — renovation of existing portables including exterior renovations, new elevated deck & canopy, site improvements, utilities reconfiguration/extension, light fixture replacement, interior finishes replacement, and hvac upgrades · 442 m away
- 1819 North Main Ave · Alamo Colleges DistrictJan 10, 2024San antonio college maintenance pkg 2 — renovation/alteration — deferred maintenance for gonzales hall (31,588 sq ft) includes updates to interior finishes, interior signage, stair handrail replacement, crawlspace enhancements, new roof, new restroom fixtures, etc · 442 m away
- 225 Rose Lane · Hw Rose LLCMar 4, 2026Headwall rose — renovation/alteration — proposed parking lot with permeable pavers · 450 m away