1819 North Main Avenue
San Antonio, TX 78212 · Mtn Tax Note Program - Sac Package 6 - Chemistry/Geology, Mtn Tax Note Program - Sac Package 6 - Central Plant
Chemistry, geology and central plant renovations at 1819 N Main
Two renovation projects are registered for this multi-tenant site, with filings dated February 14, 2024. The chemistry and geology work includes replacing a ramp and stairs, building controls, emergency lighting, smoke detectors, fire alarm equipment and security cameras; the central plant scope includes repairs and equipment and system replacements.
Summarized from Texas Department of Licensing and Regulation records · updated Feb 14, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Feb 14, 2024
- since Feb 14, 2024
- Largest scope
- 46,190 sf
- Estimated cost
- $2.7M
- state registration
Where this project stands
Finishing up · inspection nextMTN TAX NOTE PROGRAM - SAC Package 6 - Chemistry/Geology
46,190 sq ft · $2.7M est.
- RegisteredFeb 14, 2024
- Plan review
- ConstructionFeb '24 – Jun '25
- Inspectednow
- Closed
Scheduled to finish Jun 20, 2025; the state inspection hasn't been filed yet.
4 contacts on this project · 1 phone number
Permit & project history
2 projectsSite work: demolition and replace ramp and stairs. mep: all new controls, emergency illumination, and smoke detectors. elevator sump pump, fire alarm control panel to be replaced. existing cameras replaced with new security cameras and new cat 6 cable. — chemistry and geology
TDLR project registrationRenovation/AlterationReview Complete46,190 sq ft$2.7M est.- Project #
- TABS2024011577
- Tenant / owner
- Mtn Tax Note Program - Sac Package 6 - Chemistry/Geology
- Design firm
- Pro
- Contact
- Pro
Reseal concrete floors, repair windows/window graphics, replace water heater, replace vfds, replace refrigerant monitoring system, ddc controls systems replacement, mcc replacement, and fire alarm replacement. — central plant
TDLR project registrationRenovation/AlterationReview Complete13,000 sq ft$2.7M est.- Project #
- TABS2024011575
- Tenant / owner
- Mtn Tax Note Program - Sac Package 6 - Central Plant
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1819 North Main Avenue
What is being renovated at 1819 North Main Avenue?
Two TDLR-registered renovation projects cover chemistry and geology spaces and the central plant. The registrations were filed February 14, 2024.
Is a new building planned at 1819 North Main Avenue?
The records describe renovations and alterations, not construction of a new building. The chemistry and geology project includes demolition and replacement of a ramp and stairs.
What work is planned for the chemistry and geology spaces?
The scope includes replacing the ramp and stairs, controls, emergency lighting, smoke detectors, elevator sump pump, fire alarm control panel and security cameras. The project is listed as TABS2024011577.
What upgrades are planned for the central plant at 1819 N Main?
The registered work includes resealing concrete floors, repairing windows and replacing a water heater, variable frequency drives, refrigerant monitoring, controls, motor control center and fire alarm systems. The project is listed as TABS2024011575.
What's being renovated at Alamo Colleges District on North Main?
TDLR registrations at 1819 North Main Avenue list renovations to chemistry and geology spaces and a central plant. Both projects were filed February 14, 2024.
What is being built near Alamo Community Colleges District on Courtland Place?
At 1819 North Main Avenue, the registered work is renovations to chemistry and geology spaces and the central plant, rather than a new building. The address is about 214 meters from Alamo Community Colleges District at 121 W. Courtland Place.
Also being built nearby
All of 78212- 1819 N Main Ave · Alamo Colleges DistrictJan 28, 2025Alamo colleges - sac portable relocation — renovation/alteration — renovation of existing portables including exterior renovations, new elevated deck & canopy, site improvements, utilities reconfiguration/extension, light fixture replacement, interior finishes replacement, and hvac upgrades
- 1819 North Main Ave · Alamo Colleges DistrictJan 10, 2024San antonio college maintenance pkg 2 — renovation/alteration — deferred maintenance for gonzales hall (31,588 sq ft) includes updates to interior finishes, interior signage, stair handrail replacement, crawlspace enhancements, new roof, new restroom fixtures, etc
- 1819 N. Main Ave · Alamo Colleges DistrictApr 15, 2024Sac mtn package #4: sac nail technical center renovation — renovation/alteration — renovation of existing building. the scope of the work consists of upgrades and improvements to the electric water heater, ahu replacements, replace light fixtures, video surveillance upgrades, replacement of ductless split systems, access control
- 121 W. Courtland Place · Alamo Community Colleges DistrictAug 6, 2026Sac lrtf _ interior renovations — renovation/alteration — 30,240 new wall paint throughout, new sealed concrete at cooridors, new carpet in select areas, new lvt in select areas, damaged existing act replaced, new ada bottle filling station and new benches in lobby · 214 m away
- 2100 N. Main Ave · Headwall InvestmentsSep 16, 2024South bbq — additions to existing building — remodel 1,083 sq ft of existing building for restaurant dining and add on 1,440 sq ft of restroom and back of house kitchen space · 330 m away
- 1533 North Main Avenue · Accd Public Facility CorporationFeb 27, 2024House of alio gym — renovation/alteration — interior finish out of existing lease space for a new 6540 sq ft gym and 1064 sq ft cafe · 338 m away
- 310 W. Ashby · Too Legit To Split, LLCMay 28, 2025Koehler house landscape and site improvements — renovation/alteration — renovation to the existing historic koehler house site including new sidewalks, parking, fencing, and playground · 389 m away
- 2101 Mccullough Ave · Headwall Investments LLCMar 7, 2024Tbg remodel — renovation/alteration — interior remodel of existing interior finish out · 403 m away
- 117 E French Place · San Antonio Academy Of TexasAug 3, 2026San antonio academy - classroom portables — new construction — place (3) new classroom portables on site with associated utitlies for temporary use · 442 m away
- 117 E French Pl · San Antonio AcademyJul 2, 2024San antonio academy welcome centers — new construction — two new welcome centers to enhance the entry experience and strengthen security on campus. structures to be used by single occupant during school hours to monitor vehicular entrances on campus · 442 m away
- 1300 San Pedro · Alamo Community College DistrictMar 15, 2024Sac mcallister fine arts renovation — renovation/alteration — the scope of work is defined by the maintenance tax note. this includes new mep systems, ceiling replacement, replacement of broken items, security updates and new paint throughout the facility · 490 m away
More demolitions in 78212.