1819 N Main Ave
San Antonio, TX 78212 · Alamo Colleges - Sac Portable Relocation, San Antonio College Mtn Package 7 Candler Physical Education Center And Longwith Radio, Tv, & Film + 2 more
San Antonio College buildings and portables set for renovation
TDLR registrations filed from January 2024 through January 2025 list renovations to several San Antonio College facilities at this multi-tenant site. Work includes updates to the Chance Academic Center, Candler Physical Education Center, Longwith Radio, TV & Film building, Nursing & Allied Health facilities, and existing classroom portables. The project sheet lists an applicant-estimated cost of $33 million.
Summarized from Texas Department of Licensing and Regulation records · updated Jan 28, 2025
- Projects
- 4
- 4 filings
- Latest filing
- Jan 28, 2025
- since Jan 12, 2024
- Largest scope
- 133,314 sf
- Estimated cost
- $33M
- state registration
Where this project stands
Finishing up · inspection nextAlamo Colleges - SAC Portable Relocation
7,300 sq ft · $1.1M est.
- RegisteredJan 28, 2025
- Plan review
- ConstructionMar '25 – Jul '25
- Inspectednow
- Closed
Scheduled to finish Jul 1, 2025; the state inspection hasn't been filed yet.
4 contacts on this project · 2 phone numbers
Permit & project history
4 projectsRenovation of existing portables including exterior renovations, new elevated deck & canopy, site improvements, utilities reconfiguration/extension, light fixture replacement, interior finishes replacement, and hvac upgrades. — san antonio college
TDLR project registrationRenovation/AlterationReview Complete7,300 sq ft$1.1M est.- Project #
- TABS2025010535
- Tenant / owner
- Alamo Colleges - Sac Portable Relocation
- Design firm
- Pro
- Contact
- Pro
Candler: 70,873 sq ft aprox. general renovation including mainly newer equipment and general repair of damage brick longwith: 30,240 sq ft aprox. general renovation including mainly newer equipment and general repair — candler physical education center and longwith radio, television, and film
TDLR project registrationRenovation/AlterationReview Complete101,113 sq ft$6.5M est.- Project #
- TABS2024022743
- Tenant / owner
- San Antonio College Mtn Package 7 Candler Physical Education Center And Longwith Radio, Tv, & Film
- Design firm
- Pro
- Contact
- Pro
The scope of work is defined by the maintenance tax note. this includes regrading the crawlspace, new slab work at the lower mechanical room, new mep systems, security updates, roof work, and finish alterations throughout the facility. — chance academic center
TDLR project registrationRenovation/AlterationReview Complete124,066 sq ft$33M est.- Project #
- TABS2024015602
- Tenant / owner
- Sac Chance Academic Center Renovation
- Design firm
- Pro
- Contact
- Pro
Replacement of mep systems, act ceiling, flooring, millwork countertops, sinks, signage, windows, interior finishes, wall protection, ceramic wall tiles. adding electrical water bottle fillers. — nursing & allied health
TDLR project registrationRenovation/AlterationReview Complete133,314 sq ft$6.9M est.- Project #
- TABS2024009184
- Tenant / owner
- Sac Nursing & Allied Health Improvements
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1819 N Main Ave
What is being renovated at 1819 N Main Ave in San Antonio?
TDLR registrations list renovations to several San Antonio College facilities, including the Chance Academic Center, Candler Physical Education Center, Longwith Radio, TV & Film building, Nursing & Allied Health facilities, and existing portables. The filings were submitted between January 12, 2024, and January 28, 2025.
Is new construction planned at 1819 N Main Ave?
The listed projects are renovations or alterations, not new construction. Work includes building repairs, equipment and system upgrades, and interior finish updates.
What work is planned for the Chance Academic Center?
The renovation registration lists crawlspace regrading, new slab work in the lower mechanical room, new mechanical, electrical and plumbing systems, security updates, roof work, and finish alterations. It was filed April 8, 2024, as TABS2024015602.
What is being updated near Alamo Colleges District on North Main Avenue?
At the site identified with Alamo Colleges District, TDLR records list renovations to multiple San Antonio College facilities. The latest listed registration, filed January 28, 2025, covers existing portables, including exterior work, a new elevated deck and canopy, site improvements, and HVAC upgrades.
What is the estimated cost of the San Antonio College renovations?
The project sheet lists an applicant-estimated cost of $33 million. This is an estimate, not a reported total cost.
When were the renovation projects filed?
The four TDLR registrations were filed from January 12, 2024, through January 28, 2025. Their project numbers include TABS2024009184, TABS2024015602, TABS2024022743, and TABS2025010535.
Also being built nearby
All of 78212- 1819 North Main Ave · Alamo Colleges DistrictJan 10, 2024San antonio college maintenance pkg 2 — renovation/alteration — deferred maintenance for gonzales hall (31,588 sq ft) includes updates to interior finishes, interior signage, stair handrail replacement, crawlspace enhancements, new roof, new restroom fixtures, etc
- 1819 North Main Avenue · Alamo Colleges DistrictFeb 14, 2024Mtn tax note program - sac package 6 - central plant — renovation/alteration — reseal concrete floors, repair windows/window graphics, replace water heater, replace vfds, replace refrigerant monitoring system, ddc controls systems replacement, mcc replacement, and fire alarm replacement
- 1819 N. Main Ave · Alamo Colleges DistrictApr 15, 2024Sac mtn package #4: sac nail technical center renovation — renovation/alteration — renovation of existing building. the scope of the work consists of upgrades and improvements to the electric water heater, ahu replacements, replace light fixtures, video surveillance upgrades, replacement of ductless split systems, access control
- 121 W. Courtland Place · Alamo Community Colleges DistrictAug 6, 2026Sac lrtf _ interior renovations — renovation/alteration — 30,240 new wall paint throughout, new sealed concrete at cooridors, new carpet in select areas, new lvt in select areas, damaged existing act replaced, new ada bottle filling station and new benches in lobby · 214 m away
- 2100 N. Main Ave · Headwall InvestmentsSep 16, 2024South bbq — additions to existing building — remodel 1,083 sq ft of existing building for restaurant dining and add on 1,440 sq ft of restroom and back of house kitchen space · 330 m away
- 1533 North Main Avenue · Accd Public Facility CorporationFeb 27, 2024House of alio gym — renovation/alteration — interior finish out of existing lease space for a new 6540 sq ft gym and 1064 sq ft cafe · 338 m away
- 310 W. Ashby · Too Legit To Split, LLCMay 28, 2025Koehler house landscape and site improvements — renovation/alteration — renovation to the existing historic koehler house site including new sidewalks, parking, fencing, and playground · 389 m away
- 2101 Mccullough Ave · Headwall Investments LLCMar 7, 2024Tbg remodel — renovation/alteration — interior remodel of existing interior finish out · 403 m away
- 117 E French Place · San Antonio Academy Of TexasAug 3, 2026San antonio academy - classroom portables — new construction — place (3) new classroom portables on site with associated utitlies for temporary use · 442 m away
- 117 E French Pl · San Antonio AcademyJul 2, 2024San antonio academy welcome centers — new construction — two new welcome centers to enhance the entry experience and strengthen security on campus. structures to be used by single occupant during school hours to monitor vehicular entrances on campus · 442 m away
- 1300 San Pedro · Alamo Community College DistrictMar 15, 2024Sac mcallister fine arts renovation — renovation/alteration — the scope of work is defined by the maintenance tax note. this includes new mep systems, ceiling replacement, replacement of broken items, security updates and new paint throughout the facility · 490 m away