1210 E Elmira St

San Antonio, TX 78212 · Oxbow Development Group

Pedestrian bridge planned across the San Antonio River

A steel pedestrian bridge with wood decking and concrete abutments on both sides of the San Antonio River is listed for 1210 E Elmira St. The project was registered with TDLR on March 6, 2024, and its registration is marked closed. The applicant estimated the project cost at $639,000.

Summarized from Texas Department of Licensing and Regulation records · updated Mar 6, 2024

Projects
1
1 filings
Latest filing
Mar 6, 2024
since Mar 6, 2024
Largest scope
2,500 sf
Estimated cost
$639K
state registration

Where this project stands

Completed

Pearl North Bridge

2,500 sq ft · $639K est.

  1. RegisteredMar 6, 2024
  2. Plan review
  3. ConstructionMay '24 – Mar '25
  4. Inspected
  5. Closed

Ran as a 10-month build.

4 contacts on this project · 3 phone numbers

Permit & project history

1 project
  1. Pearl North Bridge

    Installing a pedestrian bridge across the san antonio river. new concrete abutments will be constructed on both sides. bridge to be steel structure with wood decking. — pearl north bridge

    TDLR project registrationNew ConstructionProject Closed2,500 sq ft$639K est.
    Tenant / owner
    Pearl North Bridge
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 1210 E Elmira St

What is being built at 1210 E Elmira St?

A pedestrian bridge across the San Antonio River is listed in a TDLR registration dated March 6, 2024. The plans describe a steel structure with wood decking and new concrete abutments on both sides.

Is a new pedestrian bridge planned near Oxbow Real Estate?

Yes. The registered Pearl North Bridge project is at 1210 E Elmira St, the address listed for Oxbow Real Estate. The project calls for a bridge across the San Antonio River.

What will the Pearl North Bridge be made of?

The TDLR project description calls for a steel structure with wood decking and concrete abutments on both sides of the river.

When was the Pearl North Bridge project registered?

The project was registered with the Texas Department of Licensing and Regulation on March 6, 2024. Its registration, TABS2024013190, is marked closed.

How much will the Pearl North Bridge cost?

The applicant's estimated project cost is $639,000. This is an estimate in the TDLR registration, not a confirmed final cost.

Is the project at 1210 E Elmira St a building or a bridge?

The TDLR registration describes a pedestrian bridge across the San Antonio River, not a building. It lists 2,500 square feet for the project.