9800 Airport Blvd. Tb-Fc4
San Antonio, TX 78216 · Properties & Concessions Management San Antonio Airport
Bakery Lorraine space remodel registered at San Antonio airport
A 230-square-foot remodel is planned for Bakery Lorraine’s existing quick-service space in Terminal B at San Antonio International Airport. The project was registered with the Texas Department of Licensing and Regulation on January 13, 2026, and the applicant’s estimated project cost is $230,000.
Summarized from Texas Department of Licensing and Regulation records · updated Jan 13, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jan 13, 2026
- since Jan 13, 2026
- Largest scope
- 230 sf
- Estimated cost
- $230K
- state registration
Where this project stands
In state plan reviewBakery Lorraine
230 sq ft · $230K est.
- RegisteredJan 13, 2026
- Plan reviewnow
- ConstructionFeb '26 – Jun '26
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectExisting quick serve space remodel. existing hvac equipment and ductwork. — terminal b
TDLR project registrationRenovation/AlterationProject Registered230 sq ft$230K est.- Project #
- TABS2026009957
- Tenant / owner
- Bakery Lorraine
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 9800 Airport Blvd. Tb-Fc4
What is being remodeled at 9800 Airport Blvd. in San Antonio?
A TDLR project registration describes a remodel of Bakery Lorraine’s existing quick-service space in Terminal B. It lists existing HVAC equipment and ductwork.
When was the Bakery Lorraine airport remodel registered?
The project was registered on January 13, 2026. Its TDLR project number is TABS2026009957.
How large is the Bakery Lorraine remodel at San Antonio International Airport?
The project registration lists an area of 230 square feet.
What is the estimated cost of the Bakery Lorraine remodel?
The applicant’s estimated cost for the project is $230,000.
What is being remodeled near Popeyes in Terminal B?
Bakery Lorraine’s existing quick-service space at 9800 Airport Blvd. is slated for a 230-square-foot remodel. The project was registered January 13, 2026.
Also being built nearby
All of 78216- 9800 Airport Blvd Ta-118 · Properties & Concessions Management OfficeOct 1, 2025Sat ta-118 pharm table — renovation/alteration — existing wine bar tenant space to new bar with prepackaged to-go food offerings. existing hvac equipment, ductwork, electrical panels, back of house mep and kitchen equipment to remain. relocating bar plumbing fixtures. minor electrical scope
- 9800 Airport Blvd Ta-152 · Properties & Concessions Management OfficeSep 22, 2025Alamo tequila bar — renovation/alteration — existing tenant space for new bar with grab and go food retail. existing hvac equipment, ductwork, plumbing fixtures, and electrical panels. all finishes are new
- 9800 Airport Blvd Ta-New · Properties & Concessions Management OfficeSep 22, 2025Alamo tequila bar kiosk — renovation/alteration — new bar kiosk serving prepackaged foods. hvac provided by existing concourse system. fire sprinklers and alarm provided by existing concourse systems. power supplied by existing electrical outlet. plumbing & waste are self contained within new kiosk
- 9800 Airport Blvd. Ta-154 · City Of San Antonio-Aviation PropertyJun 11, 2025Sat univision ta-154 — renovation/alteration — new finish-out of retail space in existing airport shell space
- 9800 Airport Blvd. Terminal B - Ts298 · City Of San Antonio - Aviation Property And Development Manager - ConcessionsOct 30, 2025Istore express — renovation/alteration — demolition and finish out for new retail store in existing airport tenant space
- 9800 Airport Blvd Glf-2 · Properties & Concessions Management OfficeOct 2, 2025Chef johnny's mercado — renovation/alteration — new tenant space for new restaurant. new hvac equipment, ductwork, plumbing fixtures, electrical panels, mep and kitchen equipment. all interior finishes, including: floor, ceiling treatment and furniture are new
- 9800 Airport Blvd · City Of San AntonioDec 29, 2025Sat terminal c — new construction — new terminal for the san antonio international airport, approximately 912,000 sq ft for all building levels
- 9800 Airport Blvd Ta-129 · Properties & Concessions Management OfficeJul 11, 2025Sat ta-129 freight fried chicken — renovation/alteration — existing quick service space remodel for new restaurant brand. existing hvac equipment, ductwork, electrical panels. all back of house finishes are existing to remain aside from maintenance replacements. all public facing finishes are new
- 9800 Airport Blvd Ta-122 · Properties & Concessions Management OfficeOct 20, 2025Panda express — renovation/alteration — new tenant space for quick serve restaurant. demolition of existing tenant space, floor and ceiling, new hvac equipment, ductwork, plumbing fixtures, electrical panels, mep and kitchen equipment. all new interior finishes
- 9800 Airport Blvd. Glf01-A1733 · San Antonio Airport AuthorityJun 17, 2025Confluence market glf01-a1733 — renovation/alteration — retail finish-out in existing building shell
- 9800 Airport Blvd. Ts-205/206 · San Antonio Airport AuthorityJun 25, 2025Military city usa — renovation/alteration — new tenant finish-out in existing airport space
- 9800 Airport Blvd Tb-Ts204 · Properties & Concessions Management OfficeJul 31, 2025Southerleigh — renovation/alteration — renovation of an existing restaurant tenant space to accommodate a new restaurant. work includes: modifications to existing hvac, plumbing, electrical; install kitchen equipment, and finish changes
More restaurants in 78216.