7930 Floyd Curl Drive, San Antonio, TX 78229
San Antonio, TX 78229 · Tenet Healthcare
Steam boiler replacement registered at St. Luke’s Baptist Hospital
A steam boiler at St. Luke’s Baptist Hospital is being replaced with a higher-capacity unit in the same location. The project was registered with the Texas Department of Licensing and Regulation on June 27, 2024; the applicant’s estimated project cost is $488,000.
Summarized from Texas Department of Licensing and Regulation records · updated Jun 27, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jun 27, 2024
- since Jun 27, 2024
- Largest scope
- 2,157 sf
- Estimated cost
- $488K
- state registration
Where this project stands
CompletedSteam Boiler B1 Replacement
2,157 sq ft · $488K est.
- RegisteredJun 27, 2024
- Plan review
- ConstructionSep '24 – Dec '24
- Inspected
- Closed
Ran as a 4-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectThe scope of this project consists of the replacement and upgrade of one (1) existing 150 bhp steam boiler to a new 200 bhp steam boiler in the same location. integrate controls for the new boiler, along with (2) remaining steam boilers to operate — st luke's baptist hospital
TDLR project registrationRenovation/AlterationProject Closed2,157 sq ft$488K est.- Project #
- TABS2024021905
- Tenant / owner
- Steam Boiler B1 Replacement
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 7930 Floyd Curl Drive, San Antonio, TX 78229
What is being built at 7930 Floyd Curl Drive?
The project replaces and upgrades one existing 150 bhp steam boiler with a new 200 bhp boiler in the same location at St. Luke’s Baptist Hospital. The TDLR registration is dated June 27, 2024.
Is a new building being constructed at 7930 Floyd Curl Drive?
The TDLR record describes a renovation and alteration, not a new building. The work is a steam boiler replacement and upgrade.
When was the boiler replacement at St. Luke’s Baptist Hospital registered?
The project was registered on June 27, 2024. Its TDLR project number is TABS2024021905.
How much will the St. Luke’s Baptist Hospital boiler project cost?
The applicant’s estimated cost for the project is $488,000, according to the TDLR registration. This is an estimate, not a confirmed final cost.
What is the project number for the boiler work at St. Luke’s Baptist Hospital?
The TDLR project number is TABS2024021905. The project is listed as closed.
What work is planned for the other boilers at St. Luke’s Baptist Hospital?
The project description says controls will be integrated for the new boiler and the two remaining steam boilers. It does not describe replacing those two boilers.
What’s happening near Altera St. Luke’s on Floyd Curl Drive?
At 7930 Floyd Curl Drive, the TDLR record describes a steam boiler replacement at St. Luke’s Baptist Hospital. The registration is dated June 27, 2024.
Also being built nearby
All of 78229- 7930 Floyd Curl Dr · Vhs San Antonio Partners LLCDec 27, 2024Ed renovation — renovation/alteration — ed renovation, rooms, flooring, ceiling, addition at entrance, gases, mechanical, and plumbing. civil work
- 7930 Floyd Curl Drive · Vhs San Antonio Partners LLCAug 25, 2026St. luke's mri equipment replacement — renovation/alteration — the scope of this project consists of the upgrade of the mri equipment, refreshing the finishes and modifying the mep systems to accommodate the new equipment. in addition, the add alternate upgrades finishes of ancillary spaces
- 7940 Floyd Curl Dr · Altera St. Lucke's LPJun 2, 2025Metro vein centers — renovation/alteration — interior finish out · 11 m away
- 7950 Floyd Curl Dr · Altera St. Luke's LLCJul 8, 2024Sa infectious disease center — new construction — interior finish out · 22 m away
- 8026 Floyd Curl Dr · Methodist Healthcare System Of San Antonio Ltd LlpMay 29, 2025Methodist hospital | specialty and transplant finish upgrade — renovation/alteration — this project includes the renovation of a main lobby and secondary lobby · 129 m away
- 8026 Floyd Curl Drive None · Methodist Healthcare System Of San Antonio Ltd LlpJan 29, 2026Pet/ct renovation — renovation/alteration — interior renovation for pet ct · 129 m away
- 8026 Floyd Curl Drive · Methodist Healthcare System Of San AntonioJan 9, 2025Mhst: new nuclear exam suite — renovation/alteration — includes minor wall modification to convert existing suite into nuclear exam room and support spaces with new equipment, new millwork, and new finishes · 129 m away
- 8026 Floyd Curl Drive · Methodist Healthcare System Of San Anotnio Ltd LlpJun 4, 2024Level 04 medsurg renovation — renovation/alteration — interior renovation of existing hospital to provide medsurg nursing unit beds · 129 m away
- 7979 Wurzbach Rd · University Of Texas Health San AntonioApr 17, 2025Cp-fy25-007 infusion & apheresis suite upgrades — renovation/alteration — upgrade thermostats with humidity control monitoring/reporting, relocate an existing nurses station, & and add curtains · 258 m away
- 4714 Medical Drive · Chick-Fil-ADec 20, 2024Cfa #2045 medical center site improvements — renovation/alteration — the project consists of demolishing an existing vacant building, and reconfiguring the existing parking lot and drive-thru lanes. it also includes one new drive way access, new site lighting, and landscaping. sow: 63,452 sq ft (1.46 ac) · 305 m away
- 4715 Medical Center Dr · Chick-Fil-A CorpAug 11, 2026Cfa# 02045 medical center site improvements — renovation/alteration — demolition of adjacent building to create a new parking area, entrance and drive thru entrance and lanes existing cfa patio will be expanded with new canopies. a new f2f canopy will also be installed. associated paving, sidewalks, striping and landsc · 322 m away
- 4502 Medical Drive · Bexar County Medical Hospital DistrictSep 18, 2026Or 36 clean supply room expansion — renovation/alteration — the project intent is to create clinical support space for existing operating room 36. scope of work includes creating a cased opening in the existing wall between the two existing rooms, removing and replacing existing flooring in a portion of the s · 403 m away