groundranger
Active · latest filing Sep 2026Commercial

4502 Medical Drive

San Antonio, TX 78229 · Or 36 Clean Supply Room Expansion, Infusion Clinic Renovation + 8 more

Four interior projects registered at 4502 Medical Drive

TDLR registrations describe four projects in this multi-tenant medical building: an operating room and intraoperative MRI room finish-out, an expanded outpatient infusion clinic, office space, and an operating-room support room. The filings date from October 23, 2025, through September 18, 2026, and describe interior work at University Health’s Sky Tower and University Hospital.

Summarized from Texas Department of Licensing and Regulation records · updated Sep 18, 2026

Projects
10
10 filings
Latest filing
Sep 18, 2026
since May 27, 2025
Largest scope
6,310 sf
Estimated cost
$12M
state registration

Where this project stands

In state plan review

OR 36 CLEAN SUPPLY ROOM EXPANSION

330 sq ft · $217K est.

  1. RegisteredSep 18, 2026
  2. Plan reviewnow
  3. ConstructionNov '26 – Dec '26
  4. Inspected
  5. Closed

Design is filed with the state. Subcontractors and suppliers are usually picked around now.

4 contacts on this project · 3 phone numbers

Permit & project history

10 projects
  1. The project intent is to create clinical support space for existing operating room 36. scope of work includes creating a cased opening in the existing wall between the two existing rooms, removing and replacing existing flooring in a portion of the s — university health - sky tower

    TDLR project registrationRenovation/AlterationProject Registered330 sq ft$217K est.
    Tenant / owner
    Or 36 Clean Supply Room Expansion
    Design firm
    Pro
    Contact
    Pro
  2. Interior renovation of existing office space to be expanded outpatient infusion clinic. — university hospital

    TDLR project registrationNew ConstructionReview Complete2,000 sq ft$1.1M est.
    Tenant / owner
    Infusion Clinic Renovation
    Design firm
    Pro
    Contact
    Pro
  3. Interior only renovation to create business occupancy office space. — university hospital

    TDLR project registrationRenovation/AlterationReview Complete5,350 sq ft$2.6M est.
    Tenant / owner
    Horizon Tower 5th Floor Command Center
    Design firm
    Pro
    Contact
    Pro
  4. Project scope includes the interior finish out of a shell space inside university health level 02 into an operating room and an intraoperative mri room/ operating room. — university health - sky tower

    TDLR project registrationNew ConstructionReview Complete2,766 sq ft$6.5M est.
    Tenant / owner
    Sky Tower Imri/ Or Finish Out
    Design firm
    Pro
    Contact
    Pro
  5. Interior renovation of existing ed arrival space to include wall demolition, mechanical and electrical rework, relocation of hand sink and installation of new demountable walls. — university health - sky tower

    TDLR project registrationRenovation/AlterationReview Complete6,310 sq ft$1.1M est.
    Tenant / owner
    Ed Arrival Renovation
    Design firm
    Pro
    Contact
    Pro
  6. Project entails the finish-out portion of the ground level within the women's + children's hospital podium for a pediatric ct lab — university hospital

    TDLR project registrationNew ConstructionProject Closed1,331 sq ft$1.1M est.
    Tenant / owner
    UH Women's + Children's Hospital - Pedi Ct Finish-Out
    Design firm
    Pro
    Contact
    Pro
  7. Remove and replace medical equipment, flooring vct tiles, rubber base, door, and desk counter. — university hospital

    TDLR project registrationRenovation/AlterationReview Complete420 sq ft$600K est.
    Tenant / owner
    Fluoroscopy Lab Equipment Replacement
    Design firm
    Pro
    Contact
    Pro
  8. Interior wall repair and refinish, new millwork. — university hospital - horizon tower

    TDLR project registrationRenovation/AlterationProject Closed7,000 sq ft$450K est.
    Tenant / owner
    4th Floor Interior Renovations
    Design firm
    Pro
    Contact
    Pro
  9. Interior renovations to an employee health clinic. new walls, doors, door frames and hardware are being added to the scope. new handwashing station is being added. new finishes. — university health - medical center

    TDLR project registrationRenovation/AlterationProject Closed1,585 sq ft$450K est.
    Tenant / owner
    UH Rio Tower 3rd Floor Employee Health Clinic
    Design firm
    Pro
    Contact
    Pro
  10. This project entails the finish-out portion of level 1 within the women's + children's hospital for a pediatric cath lab and echocardiogram exam room. — university hospital

    TDLR project registrationNew ConstructionProject Closed10,537 sq ft$12M est.
    Tenant / owner
    UH Women's + Children's Hospital - Pedi Cath Finish-Out - Package 12
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 4502 Medical Drive

What is being built at 4502 Medical Drive?

TDLR records describe four interior projects, including an operating room and intraoperative MRI room, an expanded outpatient infusion clinic, office space, and clinical support space for operating room 36. The projects were filed between October 23, 2025, and September 18, 2026.

Is 4502 Medical Drive a new clinic?

One registration describes an interior renovation to expand existing office space into an outpatient infusion clinic. It was filed May 13, 2026, under TABS2026020218.

What is the operating room project at 4502 Medical Drive?

The Sky Tower project is a finish-out of shell space on level 02 for an operating room and an intraoperative MRI room. It was filed October 23, 2025, as TABS2026004111.

What is being renovated near Uhs Petct on Medical Drive?

At 4502 Medical Drive, TDLR records list an expansion of clinical support space for existing operating room 36. The registration was filed September 18, 2026, as TABS2027001440.

Is there new office space planned at 4502 Medical Drive?

A project filed March 20, 2026, describes an interior renovation to create business-occupancy office space on Horizon Tower’s fifth floor. Its TDLR registration is TABS2026015572.

When were the projects at 4502 Medical Drive filed?

The four TDLR registrations span October 23, 2025, through September 18, 2026. The latest filing is for the operating room 36 clean supply room expansion.

Also being built nearby

All of 78229

More demolitions in 78229, medical facilities in 78229, offices in 78229.

Email me when plan review is complete