7700 Floyd Curl Drive, San Antonio, TX 78229
San Antonio, TX 78229 · Methodist Healthcare System Of San Antonio, Ltd
Methodist Hospital plans accessibility upgrades to 12 restrooms
A registered renovation project at Methodist Hospital calls for ADA upgrades to eight patient-room bathrooms in the main hospital and four public restrooms in the plaza MOB. The Texas Department of Licensing and Regulation record was filed June 30, 2026, and lists about 652 square feet of renovation. The applicant estimates the project cost at $1 million.
Summarized from Texas Department of Licensing and Regulation records · updated Jun 30, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 30, 2026
- since Jun 30, 2026
- Largest scope
- 652 sf
- Estimated cost
- $1.0M
- state registration
Where this project stands
In state plan reviewVoluntary Accessibility Upgrade
652 sq ft · $1.0M est.
- RegisteredJun 30, 2026
- Plan reviewnow
- ConstructionMay '27 – Aug '28
- Inspected
- Closed
Construction is scheduled to start May 1, 2027. Subcontractors and suppliers are usually picked in the weeks before.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectAda upgrades to (8) patient room bathrooms in main hospital and (4) public restrooms in plaza mob. approx. area of renovation 470 sq ft (main hospital) + 182 sq ft (plaza mob). — methodist hospital
TDLR project registrationRenovation/AlterationProject Registered652 sq ft$1.0M est.- Project #
- TABS2026024122
- Tenant / owner
- Voluntary Accessibility Upgrade
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 7700 Floyd Curl Drive, San Antonio, TX 78229
What is being built at 7700 Floyd Curl Drive?
A TDLR-registered renovation calls for ADA upgrades to eight patient-room bathrooms in the main hospital and four public restrooms in the plaza MOB. It was filed June 30, 2026, under project number TABS2026024122.
What accessibility work is planned at Methodist Hospital?
The project covers upgrades to eight patient-room bathrooms and four public restrooms. The TDLR record describes about 652 square feet of renovation.
When was the Methodist Hospital restroom renovation permitted?
The project was registered with the Texas Department of Licensing and Regulation on June 30, 2026. Its registration number is TABS2026024122.
How many bathrooms are included in the 7700 Floyd Curl Drive project?
The project includes 12 bathrooms: eight patient-room bathrooms in the main hospital and four public restrooms in the plaza MOB.
How much will the Methodist Hospital accessibility project cost?
The applicant's estimated cost for the project is $1 million. This is an estimate listed in the TDLR registration.
What work is planned at 7700 Floyd Curl Drive near the Methodist Hospital Parking Garage & Ancillary Services?
The registered project at 7700 Floyd Curl Drive is an accessibility renovation for bathrooms in the main hospital and plaza MOB. The TDLR filing lists eight patient-room bathrooms and four public restrooms.
Also being built nearby
All of 78229- 7700 Floyd Curl · Methodist Healthcare Sys Of Sa LtdOct 19, 20262 on call rooms — renovation/alteration — interior renovation
- 7700 Floyd Curl Drive · Methodist Healthcare Sys Of S A LtdApr 29, 2025Methodist hospital ct renovation — renovation/alteration — renovation of existing ct to replace equipment
- 7700 Floyd Curl Dr · Methodist Healthcare System Of San Antonio, Ltd.Nov 11, 2026Methodist hospital parking garage & ancillary services — new construction — 7-story parking garage connected to existing hospital at level 1 and connected to existing parking garage 3 at level 3. it has a sub-level mainly used for storage (materials management)
- 7703 Floyd Curl Drive · University Of Texas Health Science CenterOct 1, 2026Cp-fy26-005 cmhe 4th fl library renovation — renovation/alteration — expansion of an existing office suite to provide a new conference room, closed office, and open work space · 186 m away
- 7703 Floyd Curl · Ut Health San AntonioMar 25, 2024Tx star cafe renovation-cp-fy24-007 — renovation/alteration — phase 1:8,467 sq ft-renovation of existing office space into prosthetics & general research labs. phase 2:9,859 sq ft:interior finish upgrades to existing office suite & renovations of restrooms · 186 m away
- 7703 Floyd Curl Dr · University Of Texas Health San AntonioNov 6, 2024Cp-fy24-013 den 1.456u lar cage wash renovation — renovation/alteration — consists of cage wash equipment replacement, mep upgrades, and finish upgrades · 186 m away
- 4502 Medical Drive · Bexar County Medical Hospital DistrictSep 18, 2026Or 36 clean supply room expansion — renovation/alteration — the project intent is to create clinical support space for existing operating room 36. scope of work includes creating a cased opening in the existing wall between the two existing rooms, removing and replacing existing flooring in a portion of the s · 191 m away
- 4502 Medical Dr · Bexar County Medical Hosp DistJun 25, 2026Uhs petct — new construction — install new imaging equipment. upgrade patient restroom · 191 m away
- 7526 Louis Pasteur Dr · University Of Texas SystemFeb 22, 2024Cp-fy24-001 upl building office renovation — renovation/alteration — renovation of the existing office building by upgrading flooring, ceiling, and some office reconfiguring · 208 m away
- 4450 Medical Drive · Methodist Healthcare System Of San Antonio Ltd LlpSep 10, 2026Bmt clinic renovation — renovation/alteration — interior remodel of the existing office & clinic area on the first floor and convert to 4 new exam rooms. the project scopes of work include replacing new finishes at renovation area · 255 m away
- 7622 Louis Pasteur Drive · 7622 Louis Pasteur LtdNov 11, 2024Wellmed @ medical center — renovation/alteration — renovation of tenant's current lease area · 289 m away
- 7634 Louis Pasteur Dr · Mfh Pyramid Plaza Sa LLCAug 4, 2026Specialized dental san antonio tx — renovation/alteration — renovation of existing space to accommodate 5 new dental operators · 304 m away