groundranger
Active · latest filing Nov 2026Commercial

7700 Floyd Curl Dr

San Antonio, TX 78229 · Methodist Hospital Parking Garage & Ancillary Services, 7th Central Ecmo Storage + 6 more

Methodist Hospital garage and renovations at 7700 Floyd Curl

A 7-story parking garage connected to Methodist Hospital and an existing parking garage was registered with TDLR on November 11, 2026. The planned garage is listed at 440,000 square feet, with an applicant-estimated cost of $56 million. TDLR records also show several hospital renovations filed between December 2025 and July 2026, including a cath lab, pharmacy and gift shop relocation.

Summarized from Texas Department of Licensing and Regulation records · updated Nov 11, 2026

Projects
8
8 filings
Latest filing
Nov 11, 2026
since Sep 3, 2025
Largest scope
440,000 sf
Estimated cost
$56M
state registration

Where this project stands

In state plan review

Methodist Hospital Parking Garage & Ancillary Services

440,000 sq ft · $56M est.

  1. RegisteredNov 11, 2026
  2. Plan reviewnow
  3. ConstructionJan '27 – Jan '29
  4. Inspected
  5. Closed

Construction is scheduled to start Jan 4, 2027. Subcontractors and suppliers are usually picked in the weeks before.

4 contacts on this project · 3 phone numbers

Permit & project history

8 projects
  1. 7-story parking garage connected to existing hospital at level 1 and connected to existing parking garage 3 at level 3. it has a sub-level mainly used for storage (materials management). — methodist hospital

    TDLR project registrationNew ConstructionProject Registered440,000 sq ft$56M est.
    Tenant / owner
    Methodist Hospital Parking Garage & Ancillary Services
    Design firm
    Pro
    Contact
    Pro
  2. Interior renovation — methodist hospital

    TDLR project registrationRenovation/AlterationReview Complete675 sq ft$350K est.
    Tenant / owner
    7th Central Ecmo Storage
    Design firm
    Pro
    Contact
    Pro
  3. The scope of this project is to provide a new cath lab for the facility with associated support spaces. — methodist hospital

    TDLR project registrationRenovation/AlterationProject Registered1,350 sq ft$1.9M est.
    Tenant / owner
    Methodist Hospital Cath Lab 5 Finish Out
    Design firm
    Pro
    Contact
    Pro
  4. MH Retail Pharmacy

    Interior renovation to add retail pharmacy — methodist hospital

    TDLR project registrationRenovation/AlterationReview Complete1,654 sq ft$500K est.
    Tenant / owner
    Mh Retail Pharmacy
    Design firm
    Pro
    Contact
    Pro
  5. The project is a relocation of methodist hospital’s existing gift shop within the hospital. the proposed location of the gift shop is in an existing waiting room that is no longer needed. — methodist hospital

    TDLR project registrationRenovation/AlterationInspection Complete450 sq ft$200K est.
    Tenant / owner
    Methodist Hospital Gift Shop Renovation
    Design firm
    Pro
    Contact
    Pro
  6. CT 3

    Installing a new ct system with all associated components, new ambient lighting fixtures, and comprehensive finish upgrades—such as new flooring, wall paint, ceiling tiles, and updated millwork and casework. — methodist hospital main

    TDLR project registrationRenovation/AlterationInspection Complete910 sq ft$1.1M est.
    Tenant / owner
    Ct 3
    Design firm
    Pro
    Contact
    Pro
  7. SL1 Auditorium

    Renovation to add auditorium, two meetings rooms, and support spaces. — methodist hospital

    TDLR project registrationRenovation/AlterationInspection Complete10,500 sq ft$4.5M est.
    Tenant / owner
    Sl1 Auditorium
    Design firm
    Pro
    Contact
    Pro
  8. I.R. Lab

    Renovation of an existing basement level 2 radiology room to install new equipment, remove the restroom, and install new finishes. — methodist hospital

    TDLR project registrationRenovation/AlterationInspection Complete862 sq ft$1.0M est.
    Tenant / owner
    I.r. Lab
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 7700 Floyd Curl Dr

What is being built at 7700 Floyd Curl Drive?

TDLR records a new 7-story parking garage connected to Methodist Hospital and an existing parking garage. The project was registered on November 11, 2026, as TABS2027005700.

How big is the new Methodist Hospital parking garage?

The TDLR registration lists the garage at 440,000 square feet. It includes a sub-level mainly for materials-management storage.

How much will the Methodist Hospital garage cost?

The applicant’s estimated cost for the garage is $56 million, according to TDLR registration TABS2027005700. This is an estimate for that project, not a total cost for all work at the address.

What renovations are planned at Methodist Hospital on Floyd Curl?

TDLR records include a new cath lab with support spaces, a retail pharmacy renovation, a gift shop relocation, ECMO storage work, a CT system installation and renovations for an auditorium and meeting rooms. The filings date from December 2025 through July 2026.

Is a new pharmacy opening at 7700 Floyd Curl Drive?

A TDLR filing dated May 15, 2026, describes an interior renovation to add a retail pharmacy at Methodist Hospital. The filing does not state an opening date.

What is planned near the Voluntary Accessibility Upgrade at 7700 Floyd Curl?

At the same address, TDLR records a 7-story parking garage as well as hospital renovations, including a cath lab, retail pharmacy and relocated gift shop. The garage registration is dated November 11, 2026.

Also being built nearby

All of 78229

More warehouses & industrial in 78229, medical facilities in 78229, parking structures in 78229.

Email me when plan review is complete