San Antonio, TX 78229 · Methodist Hospital Ct Renovation, Methodist Hospital Med Gas Yard + 4 more

Methodist Hospital CT renovation and new medical gas yard

TDLR registrations list a new medical gas yard at the multi-tenant site at 7700 Floyd Curl Drive, filed October 29, 2024, and a renovation of an existing CT area to replace equipment, filed April 29, 2025. The CT renovation is listed as 930 square feet, and the medical gas yard addition as 1,500 square feet.

Summarized from Texas Department of Licensing and Regulation records · updated Apr 29, 2025

Projects
6
6 filings
Latest filing
Apr 29, 2025
since Oct 29, 2024
Largest scope
1,500 sf
Estimated cost
$15M
state registration

Where this project stands

Completed

Methodist Hospital CT Renovation

930 sq ft · $1.2M est.

  1. RegisteredApr 29, 2025
  2. Plan review
  3. ConstructionJun '25 – Dec '25
  4. Inspected
  5. Closed

Ran as a 6-month build.

4 contacts on this project · 3 phone numbers

Permit & project history

6 projects
  1. Renovation of existing ct to replace equipment. — methodist hospital

    TDLR project registrationRenovation/AlterationProject Closed930 sq ft$1.2M est.
    Tenant / owner
    Methodist Hospital Ct Renovation
    Design firm
    Pro
    Contact
    Pro
  2. New med gas yard — methodist hospital

    TDLR project registrationAdditions to Existing BuildingReview Complete1,500 sq ft$504K est.
    Tenant / owner
    Methodist Hospital Med Gas Yard
    Design firm
    Pro
    Contact
    Pro
  3. The project will add nine postpartum patient rooms to the hospital. several support spaces are also included in the project; including an additional nurse station, storage room, a multipurpose room, and multiple storage alcoves. — methodist hospital

    TDLR project registrationRenovation/AlterationReview Complete6,500 sq ft$2.4M est.
    Tenant / owner
    Methodist Hospital 2nd Floor Postpartum Unit
    Design firm
    Pro
    Contact
    Pro
  4. Demolition concrete pads, demolition concrete slabs, demolition existing concrete around columns, install new structural steel and metal decking, install rebar and pour new slab and pads, build new walls, roof hatch removal and replacements — methodist main

    TDLR project registrationRenovation/AlterationProject Closed1,500 sq ft$2.0M est.
    Tenant / owner
    Methodist Hospital Gen 1-4 & Switchgear Replacement
    Design firm
    Pro
    Contact
    Pro
  5. ICU Renovation

    Interior buildout of existing shell spaces to increase icu bed count capacity. no site work. no exterior work. — methodist hospital

    TDLR project registrationRenovation/AlterationProject Closed37,418 sq ft$15M est.
    Tenant / owner
    Icu Renovation
    Design firm
    Pro
    Contact
    Pro
  6. Demolition of existing medical office building and construction of new private surface parking lot. — methodist healthcare

    TDLR project registrationNew ConstructionProject Closed39,900 sq ft$4.0M est.
    Tenant / owner
    Methodist Oak Hills Mob Demolition And Parking Lot Improvements
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 7700 Floyd Curl Drive

What is being built at 7700 Floyd Curl Drive?

TDLR records list a new medical gas yard and a renovation of an existing CT area to replace equipment at the multi-tenant site. Both projects are associated with Methodist Hospital.

Is a new hospital being built at 7700 Floyd Curl Drive?

The registrations describe work at an existing hospital: a medical gas yard addition and a CT equipment replacement renovation. They do not describe a new hospital.

When was the Methodist Hospital CT renovation filed?

The CT renovation registration, TABS2025017699, was filed April 29, 2025. It describes renovation of 930 square feet to replace existing CT equipment.

What is the medical gas yard project at Methodist Hospital?

TDLR registration TABS2025004369 describes a new medical gas yard as an addition to an existing building. It was filed October 29, 2024, and lists 1,500 square feet.

How much are the Methodist Hospital projects estimated to cost?

The TDLR-listed estimated cost for the project is $1,171,000. The records also list the medical gas yard project at $504,000; reported permit valuations may be partial.

What is being built near UT Health San Antonio on Floyd Curl Drive?

At 7700 Floyd Curl Drive, TDLR registrations list a medical gas yard addition and renovation of an existing CT area at Methodist Hospital. UT Health San Antonio is listed nearby at 7703 Floyd Curl Drive.

Also being built nearby

All of 78229

More medical facilities in 78229.

Get alerts for 7700 Floyd Curl Drive