1139 Sonterra Blvd
San Antonio, TX 78258 · Methodist Hospital Stone Oak
Methodist Hospital Stone Oak plans patient tower expansion
A patient tower and ancillary services expansion is planned at Methodist Hospital Stone Oak, including a new medical-surgical patient unit and ICU unit. The project was registered with TDLR on March 4, 2025, and calls for 73,707 square feet of new construction and 10,078 square feet of renovation; the applicant estimates the project cost at $65.5 million.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 4, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Mar 4, 2025
- since Mar 4, 2025
- Largest scope
- 83,785 sf
- Estimated cost
- $66M
- state registration
Where this project stands
Under constructionPatient Tower and Ancillary Services Expansion
83,785 sq ft · $66M est.
- RegisteredMar 4, 2025
- Plan review
- ConstructionJun '25 – Dec '26
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectHorizontal and vertical expansion to provide additional ancillary services square footage, new m/s patient unit and new icu unit. the project will provide 73,707sf of new construction and 10,078 sq ft of renovation. — methodist hospital stone oak
TDLR project registrationAdditions to Existing BuildingReview Complete83,785 sq ft$66M est.- Project #
- TABS2025013244
- Tenant / owner
- Patient Tower And Ancillary Services Expansion
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1139 Sonterra Blvd
What is being built at 1139 Sonterra Blvd?
A patient tower and ancillary services expansion is planned at Methodist Hospital Stone Oak. The project includes a new medical-surgical patient unit and ICU unit.
Is Methodist Hospital Stone Oak expanding?
A TDLR registration dated March 4, 2025, describes a horizontal and vertical expansion at the hospital. It includes new construction and renovation.
How much space is included in the Methodist Hospital Stone Oak expansion?
The project includes 73,707 square feet of new construction and 10,078 square feet of renovation, for 83,785 square feet total.
What new services or units are planned at Methodist Hospital Stone Oak?
The project description specifies additional ancillary services space, a new medical-surgical patient unit, and a new ICU unit.
How much will the Methodist Hospital Stone Oak expansion cost?
The applicant's TDLR estimate is $65.5 million. This is an estimate for the project, not a reported final cost.
What is going in near Building 5 on Sonterra?
A patient tower and ancillary services expansion is planned at Methodist Hospital Stone Oak, about 74 meters from Building 5 at 1202 Sonterra. The TDLR registration is TABS2025013244, dated March 4, 2025.
When was the Methodist Hospital Stone Oak expansion registered?
The project was registered with the Texas Department of Licensing and Regulation on March 4, 2025. Its registration number is TABS2025013244.
Also being built nearby
All of 78258- 1139 E. Sonterra Blvd · Stone Oak Mob, Ltd.Aug 27, 2026Level 2 spec clinic — new construction — interior finish out of existing shell space
- 1139 East Sonterra Blvd · Methodist Healthcare System Of San Antonio Ltd LlpAug 31, 2026Cath lab #1 equipment upgrade & replacement — renovation/alteration — interior remodel of the existing cath lab #1 and its control room; equipment upgrade & replacement with the electrical to serve the new equipment. the project scopes of work include replacing new finishes at renovation area
- 1202 Sonterra · Building 5Jul 18, 2025Ferguson plastic surgery & aesthetics — renovation/alteration — interior remodel to include mechanical. electrical and plumbing · 74 m away
- 1431 E Sonterra Blvd · Howdy Neighbors, LLCNov 25, 2024Storage hub sonterra annex — new construction — construct a 3-story storage facility building. building are constructed with metal structure, slab on grade foundation, metal wall panels. building to include mep and site improvements · 115 m away
- 18707 Hardy Oak Blvd · Uscwf Hrt Split Rock Stone Oak LLCNov 21, 2024Tricity pain associates — renovation/alteration — renovation to existing conditions · 422 m away
- 18707 Hardy Oak · Uscwf Hrt Split Rock Stone Oak, LLCMar 31, 2025Aspire regenerative therapy — renovation/alteration — interior remodel of existing medical office suite in multi-story medical office building · 422 m away
- 1314 E. Sonterra Blvd · Physician Primecare Management LtdMay 7, 2026Sonterra health texas clinic — renovation/alteration — existing building alteration · 491 m away
- 972 E Sonterra Blvd · Concord Park Iii, LLCNov 5, 2026Whiting turner concord park iii office — renovation/alteration — partial floor interior remodel, scope of work includes 8,938 sq ft · 517 m away
- 1322 W 1604 N · Dominion Advisory GroupMar 8, 20241604 & military retail — new construction — 11,805 sq ft multi-tenant shell building · 570 m away