972 E Sonterra Blvd
San Antonio, TX 78258 · Concord Park Iii, LLC
8,938-square-foot office remodel registered on E Sonterra
A partial-floor interior remodel covering 8,938 square feet is planned at Whiting Turner Concord Park III Office, 972 E Sonterra Blvd. The project was registered with the Texas Department of Licensing and Regulation on November 5, 2026. The applicant estimates the project cost at $1.5 million.
Summarized from Texas Department of Licensing and Regulation records · updated Nov 5, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Nov 5, 2026
- since Nov 5, 2026
- Largest scope
- 8,938 sf
- Estimated cost
- $1.5M
- state registration
Where this project stands
In state plan reviewWhiting Turner Concord Park III Office
8,938 sq ft · $1.5M est.
- RegisteredNov 5, 2026
- Plan reviewnow
- ConstructionDec '26 – May '27
- Inspected
- Closed
Construction is scheduled to start Dec 15, 2026. Subcontractors and suppliers are usually picked in the weeks before.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectPartial floor interior remodel, scope of work includes 8,938 sq ft — concord park iii
TDLR project registrationRenovation/AlterationProject Registered8,938 sq ft$1.5M est.- Project #
- TABS2027005300
- Tenant / owner
- Whiting Turner Concord Park III Office
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 972 E Sonterra Blvd
What is being built at 972 E Sonterra Blvd?
A partial-floor interior remodel covering 8,938 square feet is registered for Whiting Turner Concord Park III Office. The TDLR project registration is TABS2027005300.
When was the office remodel at 972 E Sonterra registered?
The project was registered with TDLR on November 5, 2026. Its registration number is TABS2027005300.
How large is the remodel at Whiting Turner Concord Park III Office?
The registered scope covers 8,938 square feet of a partial floor.
What is the estimated cost of the 972 E Sonterra remodel?
The applicant's estimated project cost is $1.5 million.
What's being remodeled near Studio Level 1 Suite 180 on E Sonterra?
A partial-floor interior remodel is registered at Whiting Turner Concord Park III Office, 972 E Sonterra Blvd, about 420 meters from Studio Level 1 Suite 180 at 800 E Sonterra. The registered scope covers 8,938 square feet.
Also being built nearby
All of 78258- 18707 Hardy Oak · Uscwf Hrt Split Rock Stone Oak, LLCMar 31, 2025Aspire regenerative therapy — renovation/alteration — interior remodel of existing medical office suite in multi-story medical office building · 95 m away
- 18707 Hardy Oak Blvd · Uscwf Hrt Split Rock Stone Oak LLCNov 21, 2024Tricity pain associates — renovation/alteration — renovation to existing conditions · 95 m away
- 18831 Meisner Dr · Medvein Properties, LLCApr 24, 2024Medical vein clinic — renovation/alteration — first time finish out · 299 m away
- 941 Proton Rd · Zeppelin Real Estate, LLCOct 27, 2025941 proton rd remodel — renovation/alteration — replace ceiling tiles with drywall ceiling and integrated lighting system. - build bathroom and janitors closet in exiting storage closets - add walls to create storage closet - divide main conference room into two offices. - add wall in hallway · 330 m away
- 1431 E Sonterra Blvd · Howdy Neighbors, LLCNov 25, 2024Storage hub sonterra annex — new construction — construct a 3-story storage facility building. building are constructed with metal structure, slab on grade foundation, metal wall panels. building to include mep and site improvements · 415 m away
- 800 E Sonterra Blvd · 800 Sonterra Office, Ltd.Jan 13, 2025#24122 - pape-dawson concord park expansion — renovation/alteration — third and fourth floor interior finish-out · 420 m away
- 800 E Sonterra · 800 Sonterra Office LtdSep 2, 2026Studio level 1 suite 180 — renovation/alteration — interior finish out of office · 420 m away
- 731 Carnoustie Dr · Stone Oak Home Training FacilityFeb 23, 2024Stone oak home training — renovation/alteration — renovation of offices to training · 440 m away
- 777 E. Sonterra Boulevard · Concord Terrace, LLCAug 17, 2026Streamline — renovation/alteration — interior renovation · 454 m away
- 1139 E. Sonterra Blvd · Stone Oak Mob, Ltd.Aug 27, 2026Level 2 spec clinic — new construction — interior finish out of existing shell space · 517 m away
- 1139 Sonterra Blvd · Methodist Hospital Stone OakMar 4, 2025Patient tower and ancillary services expansion — additions to existing building — horizontal and vertical expansion to provide additional ancillary services square footage, new m/s patient unit and new icu unit. the project will provide 73,707sf of new construction and 10,078 sq ft of renovation · 517 m away
- 1139 East Sonterra Blvd · Methodist Healthcare System Of San Antonio Ltd LlpAug 31, 2026Cath lab #1 equipment upgrade & replacement — renovation/alteration — interior remodel of the existing cath lab #1 and its control room; equipment upgrade & replacement with the electrical to serve the new equipment. the project scopes of work include replacing new finishes at renovation area · 517 m away
More offices in 78258.