18707 Hardy Oak
San Antonio, TX 78258 · Aspire Regenerative Therapy, Ent Of Texas
Medical office suite remodels at 18707 Hardy Oak
TDLR filings indicate interior remodels of existing medical office suites in the multi-tenant Hardy Oak medical pavilion. The filings are dated January 9, 2024, for ENT of Texas and March 31, 2025, for Aspire Regenerative Therapy.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 31, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Mar 31, 2025
- since Jan 9, 2024
- Largest scope
- 5,607 sf
- Estimated cost
- $841K
- state registration
Where this project stands
Finishing up · inspection nextAspire Regenerative Therapy
4,041 sq ft · $150K est.
- RegisteredMar 31, 2025
- Plan review
- ConstructionApr '25 – Jun '25
- Inspectednow
- Closed
Scheduled to finish Jun 6, 2025; the state inspection hasn't been filed yet.
4 contacts on this project · 1 phone number
Permit & project history
2 projectsInterior remodel of existing medical office suite in multi-story medical office building — hardy oak medical pavilion
TDLR project registrationRenovation/AlterationReview Complete4,041 sq ft$150K est.- Project #
- TABS2025015458
- Tenant / owner
- Aspire Regenerative Therapy
- Design firm
- Pro
- Contact
- Pro
Interior remodel — hardy oak pavilion
TDLR project registrationRenovation/AlterationInspection Complete5,607 sq ft$841K est.- Project #
- TABS2024008844
- Tenant / owner
- Ent Of Texas
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 18707 Hardy Oak
What is being built at 18707 Hardy Oak in San Antonio?
TDLR filings describe interior remodels of existing medical office suites in a multi-tenant medical office building, not a new building. The filings name ENT of Texas and Aspire Regenerative Therapy.
Is a new medical office opening at 18707 Hardy Oak?
The records describe renovations to existing medical office suites. They do not say that a new office is opening.
When were the remodels at 18707 Hardy Oak filed?
The ENT of Texas registration is dated January 9, 2024, and the Aspire Regenerative Therapy registration is dated March 31, 2025.
How large is the Aspire Regenerative Therapy remodel at Hardy Oak?
The March 31, 2025, TDLR registration describes an interior remodel of 4,041 square feet in the Hardy Oak medical pavilion.
How large is the ENT of Texas remodel at Hardy Oak?
The January 9, 2024, TDLR registration describes an interior remodel of 5,607 square feet at Hardy Oak Pavilion.
What is happening near Concord Park III in San Antonio?
TDLR filings show interior remodels of medical office suites at 18707 Hardy Oak, about 95 meters from Concord Park III. The filings are dated January 9, 2024, and March 31, 2025.
Also being built nearby
All of 78258- 18707 Hardy Oak Blvd · Uscwf Hrt Split Rock Stone Oak LLCNov 21, 2024Tricity pain associates — renovation/alteration — renovation to existing conditions
- 972 E Sonterra Blvd · Concord Park Iii, LLCNov 5, 2026Whiting turner concord park iii office — renovation/alteration — partial floor interior remodel, scope of work includes 8,938 sq ft · 95 m away
- 1431 E Sonterra Blvd · Howdy Neighbors, LLCNov 25, 2024Storage hub sonterra annex — new construction — construct a 3-story storage facility building. building are constructed with metal structure, slab on grade foundation, metal wall panels. building to include mep and site improvements · 320 m away
- 941 Proton Rd · Zeppelin Real Estate, LLCOct 27, 2025941 proton rd remodel — renovation/alteration — replace ceiling tiles with drywall ceiling and integrated lighting system. - build bathroom and janitors closet in exiting storage closets - add walls to create storage closet - divide main conference room into two offices. - add wall in hallway · 351 m away
- 18831 Meisner Dr · Medvein Properties, LLCApr 24, 2024Medical vein clinic — renovation/alteration — first time finish out · 393 m away
- 1139 E. Sonterra Blvd · Stone Oak Mob, Ltd.Aug 27, 2026Level 2 spec clinic — new construction — interior finish out of existing shell space · 422 m away
- 1139 Sonterra Blvd · Methodist Hospital Stone OakMar 4, 2025Patient tower and ancillary services expansion — additions to existing building — horizontal and vertical expansion to provide additional ancillary services square footage, new m/s patient unit and new icu unit. the project will provide 73,707sf of new construction and 10,078 sq ft of renovation · 422 m away
- 1139 East Sonterra Blvd · Methodist Healthcare System Of San Antonio Ltd LlpAug 31, 2026Cath lab #1 equipment upgrade & replacement — renovation/alteration — interior remodel of the existing cath lab #1 and its control room; equipment upgrade & replacement with the electrical to serve the new equipment. the project scopes of work include replacing new finishes at renovation area · 422 m away
- 1202 Sonterra · Building 5Jul 18, 2025Ferguson plastic surgery & aesthetics — renovation/alteration — interior remodel to include mechanical. electrical and plumbing · 494 m away
- 800 E Sonterra Blvd · 800 Sonterra Office, Ltd.Jan 13, 2025#24122 - pape-dawson concord park expansion — renovation/alteration — third and fourth floor interior finish-out · 514 m away
- 800 E Sonterra · 800 Sonterra Office LtdSep 2, 2026Studio level 1 suite 180 — renovation/alteration — interior finish out of office · 514 m away
- 731 Carnoustie Dr · Stone Oak Home Training FacilityFeb 23, 2024Stone oak home training — renovation/alteration — renovation of offices to training · 526 m away