1815 S 31st St
Temple, TX 76504 · Baylor Scott & White Medical Center - Temple Pavilion
Baylor Scott & White Pavilion to upgrade eight operating rooms
A project at Baylor Scott & White Medical Center - Temple Pavilion will replace equipment and upgrade finishes in eight existing operating rooms. The TDLR project registration was filed on November 4, 2024, and lists an estimated project cost of $480,000. The registration reports 5,000 square feet and an inspection-complete status.
Summarized from Texas Department of Licensing and Regulation records · updated Nov 4, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Nov 4, 2024
- since Nov 4, 2024
- Largest scope
- 5,000 sf
- Estimated cost
- $480K
- state registration
Where this project stands
Inspected · closing outPavilion ORs Equipment Replacement
5,000 sq ft · $480K est.
- RegisteredNov 4, 2024
- Plan review
- ConstructionNov '24 – May '26
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectEquipment replacement of booms and finish upgrade to 8 existing ors — baylor scott & white medical center - temple pavilion
TDLR project registrationRenovation/AlterationInspection Complete5,000 sq ft$480K est.- Project #
- TABS2025004774
- Tenant / owner
- Pavilion Ors Equipment Replacement
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1815 S 31st St
What is being built at 1815 S 31st St in Temple?
The project is an equipment replacement and finish upgrade for eight existing operating rooms at Baylor Scott & White Medical Center - Temple Pavilion. It is a renovation, not a new building.
When was the operating room project permitted?
The TDLR project registration was filed on November 4, 2024. Its project number is TABS2025004774.
How much will the Baylor Scott & White Pavilion project cost?
The TDLR registration lists an estimated project cost of $480,000. This is the applicant's estimate for the project.
How many operating rooms are being upgraded at the Temple Pavilion?
The project description says equipment will be replaced and finishes upgraded in eight existing operating rooms.
Is the operating room renovation near Baylor Scott & White Temple Memorial?
The project is at Baylor Scott & White Medical Center - Temple Pavilion, at the same address listed for Baylor Scott & White Temple Memorial: 1815 South 31 Street.
Is the Temple Pavilion operating room project complete?
The TDLR registration lists the project status as inspection complete.
Also being built nearby
All of 76504- 1815 South 31 Street · Baylor Scott & White Temple MemorialJul 18, 2025Baylor scott & white temple memorial level 01-decontamination p3108 — renovation/alteration — sink replacement in 620 sq ft decontamination room
- 1918 South 31st Street · Ccp T Molly Wax 3 23 LPOct 17, 20247brew coffee shop - temple — new construction — scope of construction of a 510 sq ft drive-thru only coffee shop · 160 m away
- 1605 South 31 St Street · Baylor Scott And White, Center For Diagnostic Medicine, TempleSep 26, 2025Baylor scott and white, temple cdm - xray 2177 — renovation/alteration — renovation of an existing 2nd floor x-ray and control alcove to include new equipment and finishes · 227 m away
- 1605 S 31st St · Scott & White Mem Hospital &Aug 5, 2024Bsw temple - center for diagnostic medicine - x-ray 1 — renovation/alteration — renovation of an existing 2nd floor x-ray and control alcove to include new equipment and finishes · 227 m away
- 2102 S.31st. Street · The District Temple TexasMay 28, 2024Egg tuck — renovation/alteration — setting up a breakfast sandwich shop requires partition wall, plumbing, and electrical, in a vacant space · 376 m away
- 2110 S 31st · Jms Texas LLCApr 30, 2025Native gulf coast foods - temple — renovation/alteration — replace the kitchen wall and rebuild the kitchen area and serving counter. replace signage outside and repair ac units on roof · 384 m away
- 1407 South 31st Street · Big Four Investments LLCDec 8, 2025Swing forge studio — renovation/alteration — remodel existing retail space. 4 new non-load-bearing walls, sheetrock, paint, minor electrical, minor hvac, new flooring. existing restrooms and plumbing to remain as-is · 446 m away
- 2401 South 31st Street · Scott & White Memorial HospitalJul 29, 2026Level 02: procedure 275 (end of life) equipment replacement — renovation/alteration — equipment replacement project of a 731sq interventional radiology room · 585 m away
- 2401 S 31st · Baylor Scott & White Medical CenterApr 30, 2026Bsw temple cam tower expansion — additions to existing building — vertical addition to existing tower on bsw temple campus. levels 6-8 will be built at the cam south tower, with 6-7 being shell space and 8 being a full build-out. level 8 will consist of 28 universal care rooms and supporting spaces · 585 m away
- 2401 S. 31st Street · Scott & White Memorial HospitalApr 20, 2026Level 02: fluoroscopy c243-2096 equipment replacement project — renovation/alteration — equipiment replacement and finish upgrade of a 445sf fluoroscopy room · 585 m away
- 2401 S 31st St · Scott & White Mem Hospital &Aug 18, 2026Mri replacement — renovation/alteration — mri equipment replacement, new ceiling, new flooring, new casework, structural supports for the mri & ups · 585 m away
- 2401 South 31st St · Bsw Medical Center - TempleSep 19, 2025Executive health center refresh - phase 2 — renovation/alteration — renovation to existing executive suite · 585 m away