1918 South 31st Street
Temple, TX 76504 · Ccp T Molly Wax 3 23 LP
7 Brew drive-thru coffee shop registered in Temple
A 510-square-foot, drive-thru-only 7 Brew coffee shop is planned at 1918 South 31st Street in Temple. The project was registered with the Texas Department of Licensing and Regulation on October 17, 2024, and its status is listed as inspection complete. The applicant's estimated project cost is $750,000.
Summarized from Texas Department of Licensing and Regulation records · updated Oct 17, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Oct 17, 2024
- since Oct 17, 2024
- Largest scope
- 510 sf
- Estimated cost
- $750K
- state registration
Where this project stands
Inspected · closing out7Brew Coffee Shop - Temple
510 sq ft · $750K est.
- RegisteredOct 17, 2024
- Plan review
- ConstructionJan '25 – May '25
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectScope of construction of a 510 sq ft drive-thru only coffee shop — 7brew coffee shop
TDLR project registrationNew ConstructionInspection Complete510 sq ft$750K est.- Project #
- TABS2025003435
- Tenant / owner
- 7brew Coffee Shop - Temple
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1918 South 31st Street
What is being built at 1918 South 31st Street in Temple?
The TDLR registration describes a 510-square-foot, drive-thru-only 7 Brew coffee shop. It lists the project as new construction.
When was the 7 Brew coffee shop project registered?
The project was registered on October 17, 2024. Its TDLR record number is TABS2025003435.
Is the 7 Brew project at 1918 South 31st Street complete?
The TDLR record lists the project's status as inspection complete. The record does not state an opening date.
How big is the new 7 Brew in Temple?
The registered project is 510 square feet and is described as a drive-thru-only coffee shop.
What's being built near Baylor Scott & White Temple Memorial?
A 510-square-foot, drive-thru-only 7 Brew coffee shop is registered at 1918 South 31st Street, about 160 meters from Baylor Scott & White Temple Memorial. The registration date is October 17, 2024.
What's being built near The District Temple Texas on South 31st Street?
A 7 Brew drive-thru-only coffee shop is registered at 1918 South 31st Street, about 217 meters from The District Temple Texas. The project record lists 510 square feet.
What is the estimated cost of the 7 Brew project in Temple?
The TDLR record lists an estimated project cost of $750,000. This is the applicant's estimate.
Also being built nearby
All of 76504- 1815 South 31 Street · Baylor Scott & White Temple MemorialJul 18, 2025Baylor scott & white temple memorial level 01-decontamination p3108 — renovation/alteration — sink replacement in 620 sq ft decontamination room · 160 m away
- 1815 S 31st St · Baylor Scott & White Medical Center - Temple PavilionNov 4, 2024Pavilion ors equipment replacement — renovation/alteration — equipment replacement of booms and finish upgrade to 8 existing ors · 160 m away
- 2102 S.31st. Street · The District Temple TexasMay 28, 2024Egg tuck — renovation/alteration — setting up a breakfast sandwich shop requires partition wall, plumbing, and electrical, in a vacant space · 217 m away
- 2110 S 31st · Jms Texas LLCApr 30, 2025Native gulf coast foods - temple — renovation/alteration — replace the kitchen wall and rebuild the kitchen area and serving counter. replace signage outside and repair ac units on roof · 225 m away
- 1605 S 31st St · Scott & White Mem Hospital &Aug 5, 2024Bsw temple - center for diagnostic medicine - x-ray 1 — renovation/alteration — renovation of an existing 2nd floor x-ray and control alcove to include new equipment and finishes · 386 m away
- 1605 South 31 St Street · Baylor Scott And White, Center For Diagnostic Medicine, TempleSep 26, 2025Baylor scott and white, temple cdm - xray 2177 — renovation/alteration — renovation of an existing 2nd floor x-ray and control alcove to include new equipment and finishes · 386 m away
- 2401 South 31st Street · Scott & White Memorial HospitalJul 29, 2026Level 02: procedure 275 (end of life) equipment replacement — renovation/alteration — equipment replacement project of a 731sq interventional radiology room · 426 m away
- 2401 South 31st St · Bsw Medical Center - TempleSep 19, 2025Executive health center refresh - phase 2 — renovation/alteration — renovation to existing executive suite · 426 m away
- 2401 S. 31st Street · Scott & White Memorial HospitalApr 20, 2026Level 02: fluoroscopy c243-2096 equipment replacement project — renovation/alteration — equipiment replacement and finish upgrade of a 445sf fluoroscopy room · 426 m away
- 2401 S. 31st St, Temple · Baylor Scott & White HealthJun 11, 2025Temple memorial urology - or3/or4 — renovation/alteration — 2 original ors, with their adjoining sub-sterile room, are being renovated into 2 larger ors connected to the sterile core · 426 m away
- 2401 S 31st St · Baylor Scott & White Medical Center - Temple MemorialAug 13, 2025Temple memorial new cath lab / ep — renovation/alteration — this is a single-phase renovation project at baylor scott & white memorial hospital in temple, texas. within the original cath lab department, this project will fit-out the one shelled room originally intended for the fourth cath lab at this facility · 426 m away
- 2401 S 31st · Baylor Scott & White Medical CenterApr 30, 2026Bsw temple cam tower expansion — additions to existing building — vertical addition to existing tower on bsw temple campus. levels 6-8 will be built at the cam south tower, with 6-7 being shell space and 8 being a full build-out. level 8 will consist of 28 universal care rooms and supporting spaces · 426 m away
More churches & places of worship in 76504, restaurants in 76504, retail spaces in 76504.