2129 Pecan St
Austin, TX 78660
2129 Pecan St: 3 projects on record
City of Austin lists 3 filings across 3 projects at 2129 Pecan St, Austin, TX 78660 since July 14, 2016. The most recent, filed May 25, 2021, covers: “Spring hill village block b lots 5 & 6 amended plat”.
Compiled from City of Austin records · updated May 25, 2021
- Projects
- 3
- 3 filings
- Latest filing
- May 25, 2021
- since Jul 14, 2016
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Austin
Questions about 2129 Pecan St
What is being built at 2129 Pecan St?
The latest filing (City of Austin case 12554170, May 25, 2021) covers spring hill village block b lots 5 & 6 amended plat.
How many permits and filings does 2129 Pecan St have?
3 filings across 3 projects, from July 14, 2016 to May 25, 2021.
What is being built near The Church Of Pentecost Usa in Austin?
2129 Pecan St is about 69 m from The Church Of Pentecost Usa (2415 West Pecan Street). Its latest filing is for spring hill village block b lots 5 & 6 amended plat.
Is there other construction near 2129 Pecan St?
Yes. Nearby filings include 2205 Pecan St (dollar general, Nov 8, 2013); 2415 West Pecan Street (pentecost church — new construction — interior finish our, Oct 28, 2024); 15608 Spring Hill Ln (pflugerville plaza wastewater approach main, Mar 2, 2007).
How do I get alerts for new permits at 2129 Pecan St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78660- 2205 Pecan StNov 8, 2013Dollar general · 67 m away
- 2415 West Pecan Street · The Church Of Pentecost Usa Inc.Oct 28, 2024Pentecost church — new construction — interior finish our · 69 m away
- 15608 Spring Hill LnMar 2, 2007Pflugerville plaza wastewater approach main · 154 m away
- 15806 Windermere Dr · 15806 Windermere LPFeb 10, 202615806 windermere — renovation/alteration — white box - one building into multiple suites. suite 100 is 2650 sq ft, suite 200 is 3050sqft and suite 300 is 2300 sq ft · 183 m away
- 15803 Windermere Dr · Windermere Atx LPMar 26, 2026White box renovation — renovation/alteration — tenant spec suite with restroom and janitor closet in existing retail center · 194 m away
- 15504 Spring Hill LnJan 27, 2025Just need to get water meter inspected for new water meter installation · 229 m away
- 15501 Tacon LnNov 21, 2025Replacing existing generator with 80 kw generator. installing new feeder to automatic transfer switch. *disconnect and reconnect · 333 m away
- 15822 Foothill Farms Loop · Travis County Facilities Management DepartmentMay 13, 2024Pflugerville tax office extension — renovation/alteration — the project includes the demolition of existing interior walls, ceilings and millwork in accordance with the construction document for the purpose of extending the existing tax office into one of the adjacent community center bays · 335 m away
- 2415 Pecan StMay 21, 2026O.t. connection 2404-2623 pecan street west · 356 m away
- 603 Old Austin Pflugerville RdApr 8, 2009Spring hill village, resub of lot 15, block e — spring hill village, resub of lot 15, block e · 404 m away
- 2505 Pecan StOct 28, 2026Springhill restaurant - offsite utility · 411 m away
- 2512 W Pecan St · Pecan Flex SpaceJan 29, 2026Pinkorchid nails — additions to existing building — i am seeking to establish a nail salon that will feature seven pedicure chairs and six manicure stations in total, distributed across both the upper and lower levels. the upper level will also include the construction of two additional rooms · 468 m away