15803 Windermere Dr
Pflugerville, TX 78660 · White Box Renovation, Soccer Pups
Retail suite renovation at 15803 Windermere Dr
A 2,812-square-foot tenant spec suite is being built out inside an existing retail center at 15803 Windermere Dr. The TDLR project registration was filed March 26, 2026, and describes a restroom and janitor closet. The applicant estimated the project cost at $180,000; the record lists the inspection as complete.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 26, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Mar 26, 2026
- since Nov 8, 2024
- Largest scope
- 4,156 sf
- Estimated cost
- $180K
- state registration
Where this project stands
Inspected · closing outWhite Box Renovation
2,812 sq ft · $180K est.
- RegisteredMar 26, 2026
- Plan review
- ConstructionApr '26 – Oct '26
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
2 projectsTenant spec suite with restroom and janitor closet in existing retail center — windermere retail center
TDLR project registrationRenovation/AlterationInspection Complete2,812 sq ft$180K est.- Project #
- TABS2026016022
- Tenant / owner
- White Box Renovation
- Design firm
- Pro
- Contact
- Pro
Combine two existing suites. remove one restroom. enlarge two bathrooms. add service sink. add storage room. — windermere center
TDLR project registrationRenovation/AlterationReview Complete4,156 sq ft$100K est.- Project #
- TABS2025005138
- Tenant / owner
- Soccer Pups
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 15803 Windermere Dr
What is being built at 15803 Windermere Dr?
A 2,812-square-foot tenant spec suite is being built out in an existing retail center, with a restroom and janitor closet. The TDLR registration describes the work as a renovation or alteration.
When was the renovation at 15803 Windermere Dr permitted?
The TDLR project registration, number TABS2026016022, was filed March 26, 2026. The record lists the inspection as complete.
How much will the Windermere retail suite renovation cost?
The applicant estimated the project cost at $180,000. This is an estimate for the project, not a reported total construction cost.
What's being renovated near 15806 Windermere Dr?
At 15803 Windermere Dr, a 2,812-square-foot tenant spec suite is being built out in an existing retail center. The registration describes a restroom and janitor closet.
What construction is happening near Pinkorchid Nails on West Pecan Street?
A tenant spec suite renovation is registered at 15803 Windermere Dr, about 278 meters from Pinkorchid Nails. The suite is in an existing retail center.
Also being built nearby
All of 78660- 15806 Windermere Dr · 15806 Windermere LPFeb 10, 202615806 windermere — renovation/alteration — white box - one building into multiple suites. suite 100 is 2650 sq ft, suite 200 is 3050sqft and suite 300 is 2300 sq ft · 14 m away
- 2415 West Pecan Street · The Church Of Pentecost Usa Inc.Oct 28, 2024Pentecost church — new construction — interior finish our · 154 m away
- 2129 Pecan StMay 25, 2021Spring hill village block b lots 5 & 6 amended plat · 194 m away
- 2205 Pecan StNov 8, 2013Dollar general · 256 m away
- 2512 W Pecan St · Pecan Flex SpaceJan 29, 2026Pinkorchid nails — additions to existing building — i am seeking to establish a nail salon that will feature seven pedicure chairs and six manicure stations in total, distributed across both the upper and lower levels. the upper level will also include the construction of two additional rooms · 278 m away
- 603 Old Austin Pflugerville RdApr 8, 2009Spring hill village, resub of lot 15, block e — spring hill village, resub of lot 15, block e · 317 m away
- 15608 Spring Hill LnMar 2, 2007Pflugerville plaza wastewater approach main · 321 m away
- 15504 Spring Hill LnJan 27, 2025Just need to get water meter inspected for new water meter installation · 422 m away
- 15822 Foothill Farms Loop · Travis County Facilities Management DepartmentMay 13, 2024Pflugerville tax office extension — renovation/alteration — the project includes the demolition of existing interior walls, ceilings and millwork in accordance with the construction document for the purpose of extending the existing tax office into one of the adjacent community center bays · 426 m away
- 2415 Pecan StMay 21, 2026O.t. connection 2404-2623 pecan street west · 493 m away
- 15501 Tacon LnNov 21, 2025Replacing existing generator with 80 kw generator. installing new feeder to automatic transfer switch. *disconnect and reconnect · 527 m away
- 2505 Pecan StOct 28, 2026Springhill restaurant - offsite utility · 555 m away
More warehouses & industrial in 78660, retail spaces in 78660.