15806 Windermere Dr
Pflugerville, TX 78660 · 15806 Windermere LP
8,000-square-foot white-box renovation planned on Windermere
An 8,000-square-foot white-box renovation at 15806 Windermere Dr is planned to divide one building into three suites. The project was registered with the Texas Department of Licensing and Regulation on February 10, 2026; the filing lists suite areas of 2,650, 3,050 and 2,300 square feet.
Summarized from Texas Department of Licensing and Regulation records · updated Feb 10, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Feb 10, 2026
- since Feb 10, 2026
- Largest scope
- 8,000 sf
- Estimated cost
- $150K
- state registration
Where this project stands
Finishing up · inspection next15806 Windermere
8,000 sq ft · $150K est.
- RegisteredFeb 10, 2026
- Plan review
- ConstructionMar '26 – Mar '26
- Inspectednow
- Closed
Scheduled to finish Mar 31, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectWhite box - one building into multiple suites. suite 100 is 2650 sq ft, suite 200 is 3050sqft and suite 300 is 2300 sq ft — 15806 windermere
TDLR project registrationRenovation/AlterationReview Complete8,000 sq ft$150K est.- Project #
- TABS2026012240
- Tenant / owner
- 15806 Windermere
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 15806 Windermere Dr
What is being built at 15806 Windermere Dr?
A TDLR project registration describes a white-box renovation that will divide one building into three suites. The filing is dated February 10, 2026.
How many suites are planned at 15806 Windermere Dr?
The project description lists three suites: suite 100 at 2,650 square feet, suite 200 at 3,050 square feet and suite 300 at 2,300 square feet.
How large is the Windermere Dr renovation?
The TDLR registration lists 8,000 square feet for the project.
What is the estimated cost of the 15806 Windermere project?
The TDLR filing lists an estimated project cost of $150,000. This is the applicant’s estimate, not a confirmed final cost.
What's being renovated near Pinkorchid Nails on W Pecan?
A white-box renovation is registered at 15806 Windermere Dr, about 290 meters from Pinkorchid Nails at 2512 W Pecan St. The Windermere project is described as one building being divided into three suites.
Also being built nearby
All of 78660- 15803 Windermere Dr · Windermere Atx LPMar 26, 2026White box renovation — renovation/alteration — tenant spec suite with restroom and janitor closet in existing retail center · 14 m away
- 2415 West Pecan Street · The Church Of Pentecost Usa Inc.Oct 28, 2024Pentecost church — new construction — interior finish our · 141 m away
- 2129 Pecan StMay 25, 2021Spring hill village block b lots 5 & 6 amended plat · 183 m away
- 2205 Pecan StNov 8, 2013Dollar general · 244 m away
- 2512 W Pecan St · Pecan Flex SpaceJan 29, 2026Pinkorchid nails — additions to existing building — i am seeking to establish a nail salon that will feature seven pedicure chairs and six manicure stations in total, distributed across both the upper and lower levels. the upper level will also include the construction of two additional rooms · 290 m away
- 15608 Spring Hill LnMar 2, 2007Pflugerville plaza wastewater approach main · 308 m away
- 603 Old Austin Pflugerville RdApr 8, 2009Spring hill village, resub of lot 15, block e — spring hill village, resub of lot 15, block e · 329 m away
- 15822 Foothill Farms Loop · Travis County Facilities Management DepartmentMay 13, 2024Pflugerville tax office extension — renovation/alteration — the project includes the demolition of existing interior walls, ceilings and millwork in accordance with the construction document for the purpose of extending the existing tax office into one of the adjacent community center bays · 412 m away
- 15504 Spring Hill LnJan 27, 2025Just need to get water meter inspected for new water meter installation · 412 m away
- 2415 Pecan StMay 21, 2026O.t. connection 2404-2623 pecan street west · 479 m away
- 15501 Tacon LnNov 21, 2025Replacing existing generator with 80 kw generator. installing new feeder to automatic transfer switch. *disconnect and reconnect · 516 m away
- 2505 Pecan StOct 28, 2026Springhill restaurant - offsite utility · 541 m away