603 Old Austin Pflugerville Rd
Austin, TX 78660
603 Old Austin Pflugerville Rd: 1 project on record
City of Austin lists 1 filing across 1 project at 603 Old Austin Pflugerville Rd, Austin, TX 78660. The most recent, filed April 8, 2009, covers: “Spring hill village, resub of lot 15, block e”.
Compiled from City of Austin records · updated Apr 8, 2009
- Projects
- 1
- 1 filings
- Latest filing
- Apr 8, 2009
- since Apr 8, 2009
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 603 Old Austin Pflugerville Rd
What is being built at 603 Old Austin Pflugerville Rd?
The latest filing (City of Austin case 105376, April 8, 2009) covers spring hill village, resub of lot 15, block e.
How many permits and filings does 603 Old Austin Pflugerville Rd have?
1 filing across 1 project, from April 8, 2009 to April 8, 2009.
What is being built near Windermere Atx in Austin?
603 Old Austin Pflugerville Rd is about 317 m from Windermere Atx (15803 Windermere Dr). Its latest filing is for spring hill village, resub of lot 15, block e.
Is there other construction near 603 Old Austin Pflugerville Rd?
Yes. Nearby filings include 15803 Windermere Dr (white box renovation — renovation/alteration — tenant spec suite with restroom and janitor closet in existing retail center, Mar 26, 2026); 2512 W Pecan St (pinkorchid nails — additions to existing building — i am seeking to establish a nail salon that will feature seven pedicure chairs and six manicure stations in total, distributed across both the upper and lower levels. the upper level will also include the construction of two additional rooms, Jan 29, 2026); 15806 Windermere Dr (15806 windermere — renovation/alteration — white box - one building into multiple suites. suite 100 is 2650 sq ft, suite 200 is 3050sqft and suite 300 is 2300 sq ft, Feb 10, 2026).
How do I get alerts for new permits at 603 Old Austin Pflugerville Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78660- 15803 Windermere Dr · Windermere Atx LPMar 26, 2026White box renovation — renovation/alteration — tenant spec suite with restroom and janitor closet in existing retail center · 317 m away
- 2512 W Pecan St · Pecan Flex SpaceJan 29, 2026Pinkorchid nails — additions to existing building — i am seeking to establish a nail salon that will feature seven pedicure chairs and six manicure stations in total, distributed across both the upper and lower levels. the upper level will also include the construction of two additional rooms · 319 m away
- 15806 Windermere Dr · 15806 Windermere LPFeb 10, 202615806 windermere — renovation/alteration — white box - one building into multiple suites. suite 100 is 2650 sq ft, suite 200 is 3050sqft and suite 300 is 2300 sq ft · 329 m away
- 2129 Pecan StMay 25, 2021Spring hill village block b lots 5 & 6 amended plat · 404 m away
- 2415 West Pecan Street · The Church Of Pentecost Usa Inc.Oct 28, 2024Pentecost church — new construction — interior finish our · 418 m away
- 1600 Settlers Valley Drive · Pflugerville Middle SchoolSep 6, 2024Pfisd ms ada/drainage improvements — renovation/alteration — ada parking (2000 sq ft) and drainage improvements · 431 m away
- 2205 Pecan StNov 8, 2013Dollar general · 467 m away
- 15608 Spring Hill LnMar 2, 2007Pflugerville plaza wastewater approach main · 558 m away
- 15504 Spring Hill LnJan 27, 2025Just need to get water meter inspected for new water meter installation · 568 m away