1608 Cloverleaf Dr
Austin, TX 78723
1608 Cloverleaf Dr: 2 projects on record
City of Austin lists 2 filings across 2 projects at 1608 Cloverleaf Dr, Austin, TX 78723. The most recent, filed July 16, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Jul 16, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Jul 16, 2024
- since Jul 16, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitExpired- Record
- 2024-086453 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Move a gas line for a dryer connection
Move a gas line for a dryer connection
City of Austin permitPlumbing PermitFinal- Record
- 2023-099862 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1608 Cloverleaf Dr
What is being built at 1608 Cloverleaf Dr?
The latest filing (City of Austin permit 2024-086453 MP, July 16, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 1608 Cloverleaf Dr have?
2 filings across 2 projects, from July 16, 2024 to July 16, 2024.
Is there other construction near 1608 Cloverleaf Dr?
Yes. Nearby filings include 1606 Cloverleaf Dr (upgrade service to a 200 amp. 120/240v overhead residential. 512-504-6079 joe compton for questions, Feb 12, 2025); 1610 Cloverleaf Dr (replacement of complete existing central heat and air system with or without duct work install new 3 ton complete upflow gas system with condensation pump, Jan 15, 2025); 1609 Cloverleaf Dr (excvate 18 tunnel to repair main drain line under house excavate 8 trench to repair main drin line in yard, May 28, 2026).
How do I get alerts for new permits at 1608 Cloverleaf Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 1606 Cloverleaf DrFeb 12, 2025Upgrade service to a 200 amp. 120/240v overhead residential. 512-504-6079 joe compton for questions · 17 m away
- 1610 Cloverleaf DrJan 15, 2025Replacement of complete existing central heat and air system with or without duct work install new 3 ton complete upflow gas system with condensation pump · 18 m away
- 1609 Cloverleaf DrMay 28, 2026Excvate 18 tunnel to repair main drain line under house excavate 8 trench to repair main drin line in yard · 45 m away
- 1611 Cloverleaf DrFeb 12, 2026Replace sewer lines under the house via tunnel and sewer yard line 15 feet of tunnel · 46 m away
- 1607 Ridgemont DrFeb 28, 2025Replacement of an existing water heater standard 40 gal natural gas water heater change out · 51 m away
- 1614 Cloverleaf DrNov 9, 2026Interior electrical upgrades of outlets and switches and lighting and circuits · 53 m away
- 1609 Ridgemont DrApr 24, 202630 tunnel below the foundation to replace the front bathroom and kitchen drain lines.. 2 access holes - front front · 53 m away
- 1605 Ridgemont DrApr 29, 2026Dig an entrance hole opening on the right side of the house (opening a). dig another hole opening on the left side of the house where the sewer cleanout is (opening b). tunnel 75ft from a to b following the old cast iron sewer line. remove all cast iron. build a new sewer line from a to b using schedule 40 pvc. replace p-traps to tubs and showers and install new flanges for toilets. the line will have a 1/4 fall and we will secure the 2 and 3 pvc pipes to the bottom of the house every 4 feet with stainless steel hangers · 56 m away
- 1611 Ridgemont DrAug 12, 2025Tunnel under the foundation to replace the cast iron in bathroom kitchen and laundry with sch 40 pvc · 63 m away
- 1613 Ridgemont DrAug 26, 2026Tunnel under the foundation to replace the cast iron drain lines in the bathroom kitchen and laundry with sch 40 pvc. there will be two access holes: one in front and one on the side · 74 m away
- 1610 Corona DrJun 11, 2026Sewer re-pipe via tunnel and exterior excavation · 92 m away
- 1700 Cloverleaf DrJan 27, 2026New single-story accessory structure · 98 m away