1700 Cloverleaf Dr
Austin, TX 78723
1700 Cloverleaf Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 1700 Cloverleaf Dr, Austin, TX 78723. The most recent, filed January 27, 2026, covers: “New single-story accessory structure”.
Compiled from City of Austin records · updated Jan 27, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jan 27, 2026
- since Jan 27, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectNew single-story accessory structure
New single-story accessory structure
City of Austin permitBuilding PermitExpired- Record
- 2025-082621 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1700 Cloverleaf Dr
What is being built at 1700 Cloverleaf Dr?
The latest filing (City of Austin permit 2025-082621 BP, January 27, 2026) covers new single-story accessory structure.
How many permits and filings does 1700 Cloverleaf Dr have?
1 filing across 1 project, from January 27, 2026 to January 27, 2026.
Is there other construction near 1700 Cloverleaf Dr?
Yes. Nearby filings include 1702 Cloverleaf Dr (upgrade 125 amp oh to 200amp oh service, Feb 23, 2024); 1614 Cloverleaf Dr (interior electrical upgrades of outlets and switches and lighting and circuits, Nov 9, 2026); 1703 Cloverleaf Dr (replacement of complete existing central heat and air system with or without duct work, Jan 13, 2025).
How do I get alerts for new permits at 1700 Cloverleaf Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 1702 Cloverleaf DrFeb 23, 2024Upgrade 125 amp oh to 200amp oh service · 23 m away
- 1614 Cloverleaf DrNov 9, 2026Interior electrical upgrades of outlets and switches and lighting and circuits · 45 m away
- 1703 Cloverleaf DrJan 13, 2025Replacement of complete existing central heat and air system with or without duct work · 52 m away
- 1613 Ridgemont DrAug 26, 2026Tunnel under the foundation to replace the cast iron drain lines in the bathroom kitchen and laundry with sch 40 pvc. there will be two access holes: one in front and one on the side · 61 m away
- 1611 Ridgemont DrAug 12, 2025Tunnel under the foundation to replace the cast iron in bathroom kitchen and laundry with sch 40 pvc · 75 m away
- 1610 Cloverleaf DrJan 15, 2025Replacement of complete existing central heat and air system with or without duct work install new 3 ton complete upflow gas system with condensation pump · 79 m away
- 1707 Ridgemont DrJul 16, 2025Tunneling under the foundation to repair drain lines only. refer to permit #2012-105678 pp. replace kitchen window widen the doors on the pantry. remove the furr-downs and cabinets add 3 new electrical receptacles - add can lights. install new cabinets counters and backsplash · 86 m away
- 1609 Ridgemont DrApr 24, 202630 tunnel below the foundation to replace the front bathroom and kitchen drain lines.. 2 access holes - front front · 92 m away
- 1611 Cloverleaf DrFeb 12, 2026Replace sewer lines under the house via tunnel and sewer yard line 15 feet of tunnel · 95 m away
- 1608 Cloverleaf DrJul 16, 2024Replacement of complete existing central heat and air system with or without duct work · 98 m away
- 1704 Ridgemont DrJun 2, 2025Replacement of an existing water heater installing like/like g water heater · 106 m away
- 1607 Ridgemont DrFeb 28, 2025Replacement of an existing water heater standard 40 gal natural gas water heater change out · 109 m away