1610 Cloverleaf Dr
Austin, TX 78723
1610 Cloverleaf Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 1610 Cloverleaf Dr, Austin, TX 78723. The most recent, filed January 15, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work install new 3 ton complete upflow gas system with condensation pump”.
Compiled from City of Austin records · updated Jan 15, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jan 15, 2025
- since Jan 15, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work install new 3 ton complete upflow gas system with condensation pump
Replacement of complete existing central heat and air system with or without duct work install new 3 ton complete upflow gas system with condensation pump
City of Austin permitMechanical PermitExpired- Record
- 2024-165642 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1610 Cloverleaf Dr
What is being built at 1610 Cloverleaf Dr?
The latest filing (City of Austin permit 2024-165642 MP, January 15, 2025) covers replacement of complete existing central heat and air system with or without duct work install new 3 ton complete upflow gas system with condensation pump.
How many permits and filings does 1610 Cloverleaf Dr have?
1 filing across 1 project, from January 15, 2025 to January 15, 2025.
Is there other construction near 1610 Cloverleaf Dr?
Yes. Nearby filings include 1608 Cloverleaf Dr (replacement of complete existing central heat and air system with or without duct work, Jul 16, 2024); 1614 Cloverleaf Dr (interior electrical upgrades of outlets and switches and lighting and circuits, Nov 9, 2026); 1606 Cloverleaf Dr (upgrade service to a 200 amp. 120/240v overhead residential. 512-504-6079 joe compton for questions, Feb 12, 2025).
How do I get alerts for new permits at 1610 Cloverleaf Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 1608 Cloverleaf DrJul 16, 2024Replacement of complete existing central heat and air system with or without duct work · 18 m away
- 1614 Cloverleaf DrNov 9, 2026Interior electrical upgrades of outlets and switches and lighting and circuits · 35 m away
- 1606 Cloverleaf DrFeb 12, 2025Upgrade service to a 200 amp. 120/240v overhead residential. 512-504-6079 joe compton for questions · 35 m away
- 1611 Cloverleaf DrFeb 12, 2026Replace sewer lines under the house via tunnel and sewer yard line 15 feet of tunnel · 45 m away
- 1609 Ridgemont DrApr 24, 202630 tunnel below the foundation to replace the front bathroom and kitchen drain lines.. 2 access holes - front front · 48 m away
- 1611 Ridgemont DrAug 12, 2025Tunnel under the foundation to replace the cast iron in bathroom kitchen and laundry with sch 40 pvc · 52 m away
- 1607 Ridgemont DrFeb 28, 2025Replacement of an existing water heater standard 40 gal natural gas water heater change out · 53 m away
- 1609 Cloverleaf DrMay 28, 2026Excvate 18 tunnel to repair main drain line under house excavate 8 trench to repair main drin line in yard · 53 m away
- 1613 Ridgemont DrAug 26, 2026Tunnel under the foundation to replace the cast iron drain lines in the bathroom kitchen and laundry with sch 40 pvc. there will be two access holes: one in front and one on the side · 60 m away
- 1605 Ridgemont DrApr 29, 2026Dig an entrance hole opening on the right side of the house (opening a). dig another hole opening on the left side of the house where the sewer cleanout is (opening b). tunnel 75ft from a to b following the old cast iron sewer line. remove all cast iron. build a new sewer line from a to b using schedule 40 pvc. replace p-traps to tubs and showers and install new flanges for toilets. the line will have a 1/4 fall and we will secure the 2 and 3 pvc pipes to the bottom of the house every 4 feet with stainless steel hangers · 64 m away
- 1700 Cloverleaf DrJan 27, 2026New single-story accessory structure · 79 m away
- 1610 Corona DrJun 11, 2026Sewer re-pipe via tunnel and exterior excavation · 94 m away