1614 Cloverleaf Dr
Austin, TX 78723
Window replacement and electrical upgrades at 1614 Cloverleaf Dr
City of Austin permits indicate window replacement and interior electrical upgrades at 1614 Cloverleaf Dr. The window-replacement permit was filed September 17, 2026, and the electrical permit was filed November 9, 2026.
Summarized from City of Austin records · updated Nov 9, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Nov 9, 2026
- since Sep 17, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsInterior electrical upgrades of outlets and switches and lighting and circuits
Interior electrical upgrades of outlets and switches and lighting and circuits
City of Austin permitElectrical PermitActive- Record
- 2026-144883 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: window replacement
Express: window replacement
City of Austin permitBuilding PermitActive- Record
- 2026-120716 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1614 Cloverleaf Dr
What work is happening at 1614 Cloverleaf Dr?
City of Austin permits describe window replacement and interior electrical upgrades to outlets, switches, lighting, and circuits.
When were permits filed for 1614 Cloverleaf Dr?
The window-replacement permit, 2026-120716 BP, was filed September 17, 2026. The electrical permit, 2026-144883 EP, was filed November 9, 2026.
What is permit 2026-144883 EP for in Austin?
The City of Austin permit describes interior electrical upgrades to outlets, switches, lighting, and circuits. It was filed November 9, 2026.
What is permit 2026-120716 BP for?
Permit 2026-120716 BP is an express building permit for window replacement at 1614 Cloverleaf Dr. It was filed September 17, 2026.
Is a new building planned at 1614 Cloverleaf Dr?
The available City of Austin records describe window replacement and interior electrical work, not construction of a new building.
Also being built nearby
All of 78723- 1610 Cloverleaf DrJan 15, 2025Replacement of complete existing central heat and air system with or without duct work install new 3 ton complete upflow gas system with condensation pump · 35 m away
- 1700 Cloverleaf DrJan 27, 2026New single-story accessory structure · 45 m away
- 1613 Ridgemont DrAug 26, 2026Tunnel under the foundation to replace the cast iron drain lines in the bathroom kitchen and laundry with sch 40 pvc. there will be two access holes: one in front and one on the side · 47 m away
- 1611 Ridgemont DrAug 12, 2025Tunnel under the foundation to replace the cast iron in bathroom kitchen and laundry with sch 40 pvc · 50 m away
- 1608 Cloverleaf DrJul 16, 2024Replacement of complete existing central heat and air system with or without duct work · 53 m away
- 1611 Cloverleaf DrFeb 12, 2026Replace sewer lines under the house via tunnel and sewer yard line 15 feet of tunnel · 58 m away
- 1609 Ridgemont DrApr 24, 202630 tunnel below the foundation to replace the front bathroom and kitchen drain lines.. 2 access holes - front front · 60 m away
- 1702 Cloverleaf DrFeb 23, 2024Upgrade 125 amp oh to 200amp oh service · 68 m away
- 1606 Cloverleaf DrFeb 12, 2025Upgrade service to a 200 amp. 120/240v overhead residential. 512-504-6079 joe compton for questions · 70 m away
- 1607 Ridgemont DrFeb 28, 2025Replacement of an existing water heater standard 40 gal natural gas water heater change out · 73 m away
- 1609 Cloverleaf DrMay 28, 2026Excvate 18 tunnel to repair main drain line under house excavate 8 trench to repair main drin line in yard · 76 m away
- 1703 Cloverleaf DrJan 13, 2025Replacement of complete existing central heat and air system with or without duct work · 77 m away