Covered Bridge Amenity Center site plan approved in Austin
A site plan for the Covered Bridge Amenity Center was approved and released by the City of Austin on December 22, 2025 (case 13230325). A revision filed July 21, 2026, later expired; the records do not specify a construction timeline or building size.
Summarized from City of Austin records · updated Jul 21, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Jul 21, 2026
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsSources: City of Austin
Questions about 6820 Covered Bridge Dr
What is being built at 6820 Covered Bridge Dr?
City of Austin records show a site plan for the Covered Bridge Amenity Center. The available records do not specify the center’s size or construction details.
What is the status of the Covered Bridge Amenity Center plans?
The site plan was approved and released on December 22, 2025, under case 13230325. A revision filed July 21, 2026, under case 13684413 is marked expired.
When was the Covered Bridge Amenity Center approved?
The latest site plan marked approved and released was filed on December 22, 2025 (City of Austin case 13230325).
Is construction underway at 6820 Covered Bridge Dr?
The records provided document site plan cases, not construction activity or a construction schedule. A revision filed July 21, 2026, is marked expired.
Were there earlier plans for the Covered Bridge Amenity Center?
Yes. City of Austin records include an approved and released site plan filed March 2, 2007 (case 216094), as well as a site plan filed in 2023 that is marked expired.
Also being built nearby
All of 78736- 7004 Covered Bridge DrJun 1, 2026Tunneling to realign the pipeline for master bathroom. we will be digging 38 feet and the access hole is on the right side of the house · 119 m away
- 6921 Covered Bridge DrNov 11, 2025Replacement of complete existing central heat and air system with or without duct work · 151 m away
- 7012 Covered Bridge DrMay 7, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 2 ton horizontal gas system · 153 m away
- 7001 Covered Bridge DrJun 16, 2025Replacement of complete existing central heat and air system with or without duct work · 166 m away
- 8707 Nandas TrlJun 25, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton 2-stage horizontal gas system · 170 m away
- 7005 Covered Bridge DrOct 28, 2026Install ev charger · 179 m away
- 6804 Covered Bridge DrApr 14, 2015Amli covered bridge phase ii · 184 m away
- 8809 Moccasin PathNov 10, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 189 m away
- 8701 Nandas TrlJun 7, 2024Replacement of complete existing central heat and air system with or without duct work · 202 m away
- 7009 Covered Bridge DrJul 8, 2026Replacement of complete existing central heat and air system with or without duct work · 201 m away
- 6811 Covered Bridge DrJul 7, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 207 m away
- 7101 Covered Bridge DrMar 27, 2025Replacement of complete existing central heat and air system with or without duct work · 250 m away