7004 Covered Bridge Dr
Austin, TX 78736
Bathroom plumbing and HVAC work at 7004 Covered Bridge Dr
City of Austin permits indicate plumbing work to realign a pipeline serving the master bathroom at this home, filed June 1, 2026. An earlier permit, filed July 21, 2025, covers replacement of the existing central heating and air-conditioning system. Both permits are listed as final.
Summarized from City of Austin records · updated Jun 1, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jun 1, 2026
- since Jul 21, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunneling to realign the pipeline for master bathroom. we will be digging 38 feet and the access hole is on the right side of the house
- AppliedMay 27, 2026
- IssuedJun 1, 2026
- WorkJun '26 – Jun '26
- Final inspectionJun 16, 2026
Passed final inspection Jun 16, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsTunneling to realign the pipeline for master bathroom. we will be digging 38 feet and the access hole is on the right side of the house
Tunneling to realign the pipeline for master bathroom. we will be digging 38 feet and the access hole is on the right side of the house
City of Austin permitPlumbing PermitFinal- Record
- 2026-066791 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-087962 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7004 Covered Bridge Dr
What is being built at 7004 Covered Bridge Dr?
The City of Austin records show plumbing work to realign a pipeline serving the master bathroom and replacement of the home's existing central heating and air-conditioning system. They do not indicate a new building.
What plumbing work is planned at 7004 Covered Bridge Dr?
Permit 2026-066791 PP, filed June 1, 2026, describes tunneling 38 feet to realign a pipeline for the master bathroom. The permit is listed as final.
Is a new HVAC system being installed at 7004 Covered Bridge Dr?
A mechanical permit filed July 21, 2025, covers replacement of the complete existing central heat and air system, with or without ductwork. Permit 2025-087962 MP is listed as final.
When were permits filed for 7004 Covered Bridge Dr?
The records list two City of Austin permits: a mechanical permit filed July 21, 2025, and a plumbing permit filed June 1, 2026.
Is a new house being built at 7004 Covered Bridge Dr?
The available permit records describe work on the home's plumbing and existing heating and air-conditioning system, not construction of a new house.
Also being built nearby
All of 78736- 7012 Covered Bridge DrMay 7, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 2 ton horizontal gas system · 47 m away
- 7005 Covered Bridge DrOct 28, 2026Install ev charger · 68 m away
- 7001 Covered Bridge DrJun 16, 2025Replacement of complete existing central heat and air system with or without duct work · 68 m away
- 7009 Covered Bridge DrJul 8, 2026Replacement of complete existing central heat and air system with or without duct work · 82 m away
- 6921 Covered Bridge DrNov 11, 2025Replacement of complete existing central heat and air system with or without duct work · 92 m away
- 6820 Covered Bridge DrJul 21, 2026Covered bridge amenity center (revision to sp-2023-0430c) · 119 m away
- 8809 Moccasin PathNov 10, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 124 m away
- 7101 Covered Bridge DrMar 27, 2025Replacement of complete existing central heat and air system with or without duct work · 135 m away
- 8707 Nandas TrlJun 25, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton 2-stage horizontal gas system · 179 m away
- 7116 Covered Bridge DrMar 20, 2024Express - foundation repair - installing 11 exterior pilings · 192 m away
- 8701 Nandas TrlJun 7, 2024Replacement of complete existing central heat and air system with or without duct work · 204 m away
- 7101 Windthorst CvMay 28, 2024Install new 6.715kw rooftop solar system and 13.5kw energy storage system for existing residential only · 205 m away