6921 Covered Bridge Dr
Austin, TX 78736
Central heat and air system replacement permitted at 6921 Covered Bridge Dr
A permit indicates the complete existing central heat and air system at 6921 Covered Bridge Dr is being replaced, with or without duct work. The City of Austin permit was filed November 11, 2025, and its status is Final.
Summarized from City of Austin records · updated Nov 11, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Nov 11, 2025
- since Nov 11, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedNov 10, 2025
- IssuedNov 11, 2025
- WorkNov '25 – Dec '25
- Final inspectionDec 3, 2025
Passed final inspection Dec 3, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-144404 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6921 Covered Bridge Dr
What is being built at 6921 Covered Bridge Dr?
A City of Austin mechanical permit indicates replacement of the home's complete existing central heat and air system, with or without duct work. The permit was filed November 11, 2025.
Is there a new home being built at 6921 Covered Bridge Dr?
The record describes replacement of an existing central heat and air system, not construction of a new home. The permit is 2025-144404 MP.
When was the HVAC permit filed for 6921 Covered Bridge Dr?
The City of Austin filed mechanical permit 2025-144404 MP on November 11, 2025.
What does permit 2025-144404 MP cover?
It covers replacement of the complete existing central heat and air system, with or without duct work, at 6921 Covered Bridge Dr.
Is the 6921 Covered Bridge Dr permit final?
Yes. The City of Austin record lists permit 2025-144404 MP as Final.
Also being built nearby
All of 78736- 8809 Moccasin PathNov 10, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 38 m away
- 7001 Covered Bridge DrJun 16, 2025Replacement of complete existing central heat and air system with or without duct work · 50 m away
- 7005 Covered Bridge DrOct 28, 2026Install ev charger · 77 m away
- 7004 Covered Bridge DrJun 1, 2026Tunneling to realign the pipeline for master bathroom. we will be digging 38 feet and the access hole is on the right side of the house · 92 m away
- 8707 Nandas TrlJun 25, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton 2-stage horizontal gas system · 104 m away
- 7009 Covered Bridge DrJul 8, 2026Replacement of complete existing central heat and air system with or without duct work · 117 m away
- 8701 Nandas TrlJun 7, 2024Replacement of complete existing central heat and air system with or without duct work · 121 m away
- 7012 Covered Bridge DrMay 7, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 2 ton horizontal gas system · 131 m away
- 6820 Covered Bridge DrJul 21, 2026Covered bridge amenity center (revision to sp-2023-0430c) · 151 m away
- 6811 Covered Bridge DrJul 7, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 180 m away
- 7101 Covered Bridge DrMar 27, 2025Replacement of complete existing central heat and air system with or without duct work · 186 m away
- 7000 Halesboro DrJun 16, 2025Patio onversion and uncovered deck: enclose the patio and add more decking to a wood deck (adding 170 sq ft uncovered) electrical work/ moving outlets · 199 m away