7012 Covered Bridge Dr
Austin, TX 78736
7012 Covered Bridge Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 7012 Covered Bridge Dr, Austin, TX 78736. The most recent, filed May 7, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work like for like: 2 ton horizontal gas system”.
Compiled from City of Austin records · updated May 7, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 7, 2025
- since May 7, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work like for like: 2 ton horizontal gas system
- AppliedMay 5, 2025
- IssuedMay 7, 2025
- WorkMay '25 – Jun '25
- Final inspectionJun 4, 2025
Passed final inspection Jun 4, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work like for like: 2 ton horizontal gas system
Replacement of complete existing central heat and air system with or without duct work like for like: 2 ton horizontal gas system
City of Austin permitMechanical PermitFinal- Record
- 2025-055383 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7012 Covered Bridge Dr
What is being built at 7012 Covered Bridge Dr?
The latest filing (City of Austin permit 2025-055383 MP, May 7, 2025) covers replacement of complete existing central heat and air system with or without duct work like for like: 2 ton horizontal gas system.
How many permits and filings does 7012 Covered Bridge Dr have?
1 filing across 1 project, from May 7, 2025 to May 7, 2025.
Is there other construction near 7012 Covered Bridge Dr?
Yes. Nearby filings include 7004 Covered Bridge Dr (tunneling to realign the pipeline for master bathroom. we will be digging 38 feet and the access hole is on the right side of the house, Jun 1, 2026); 7009 Covered Bridge Dr (replacement of complete existing central heat and air system with or without duct work, Jul 8, 2026); 7005 Covered Bridge Dr (install ev charger, Oct 28, 2026).
How do I get alerts for new permits at 7012 Covered Bridge Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78736- 7004 Covered Bridge DrJun 1, 2026Tunneling to realign the pipeline for master bathroom. we will be digging 38 feet and the access hole is on the right side of the house · 47 m away
- 7009 Covered Bridge DrJul 8, 2026Replacement of complete existing central heat and air system with or without duct work · 68 m away
- 7005 Covered Bridge DrOct 28, 2026Install ev charger · 79 m away
- 7001 Covered Bridge DrJun 16, 2025Replacement of complete existing central heat and air system with or without duct work · 94 m away
- 7101 Covered Bridge DrMar 27, 2025Replacement of complete existing central heat and air system with or without duct work · 97 m away
- 6921 Covered Bridge DrNov 11, 2025Replacement of complete existing central heat and air system with or without duct work · 131 m away
- 7116 Covered Bridge DrMar 20, 2024Express - foundation repair - installing 11 exterior pilings · 145 m away
- 6820 Covered Bridge DrJul 21, 2026Covered bridge amenity center (revision to sp-2023-0430c) · 153 m away
- 8809 Moccasin PathNov 10, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 158 m away
- 7120 Covered Bridge DrNov 30, 2023Express: replace 21 windows like for like · 164 m away
- 7101 Windthorst CvMay 28, 2024Install new 6.715kw rooftop solar system and 13.5kw energy storage system for existing residential only · 191 m away
- 7200 Covered Bridge DrAug 3, 2026New construction in-ground pool and spa · 201 m away