groundranger
Historic · latest filing May 2025Residential

7012 Covered Bridge Dr

Austin, TX 78736

7012 Covered Bridge Dr: 1 project on record

City of Austin lists 1 filing across 1 project at 7012 Covered Bridge Dr, Austin, TX 78736. The most recent, filed May 7, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work like for like: 2 ton horizontal gas system”.

Compiled from City of Austin records · updated May 7, 2025

Projects
1
1 filings
Latest filing
May 7, 2025
since May 7, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Replacement of complete existing central heat and air system with or without duct work like for like: 2 ton horizontal gas system

  1. AppliedMay 5, 2025
  2. IssuedMay 7, 2025
  3. WorkMay '25 – Jun '25
  4. Final inspectionJun 4, 2025

Passed final inspection Jun 4, 2025.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Replacement of complete existing central heat and air system with or without duct work like for like: 2 ton horizontal gas system

    Replacement of complete existing central heat and air system with or without duct work like for like: 2 ton horizontal gas system

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 7012 Covered Bridge Dr

What is being built at 7012 Covered Bridge Dr?

The latest filing (City of Austin permit 2025-055383 MP, May 7, 2025) covers replacement of complete existing central heat and air system with or without duct work like for like: 2 ton horizontal gas system.

How many permits and filings does 7012 Covered Bridge Dr have?

1 filing across 1 project, from May 7, 2025 to May 7, 2025.

Is there other construction near 7012 Covered Bridge Dr?

Yes. Nearby filings include 7004 Covered Bridge Dr (tunneling to realign the pipeline for master bathroom. we will be digging 38 feet and the access hole is on the right side of the house, Jun 1, 2026); 7009 Covered Bridge Dr (replacement of complete existing central heat and air system with or without duct work, Jul 8, 2026); 7005 Covered Bridge Dr (install ev charger, Oct 28, 2026).

How do I get alerts for new permits at 7012 Covered Bridge Dr?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78736
Email me when a new permit is filed