8408 Annalise Dr
Austin, TX 78744 · Balcones Re Addison 2022 LP
Owl Off Road tenant finish-out planned on Annalise Drive
A tenant finish-out for Owl Off Road at 8408 Annalise Drive includes removing an existing stud wall, adding a metal stud wall and installing electrical outlets. The City of Austin approved and released an Addison Commercial Park site plan case on May 23, 2025; the TDLR project registration for the finish-out is dated June 2, 2025, and lists an applicant-estimated cost of $175,000.
Summarized from Texas Department of Licensing and Regulation, City of Austin records · updated Jun 2, 2025
- Projects
- 6
- 6 filings
- Latest filing
- Jun 2, 2025
- since May 23, 2025
- Largest scope
- 15,300 sf
- Estimated cost
- $175K
- state registration
Where this project stands
Finishing up · inspection nextOwl Off Road Tenant Finish out
15,300 sq ft · $175K est.
- RegisteredJun 2, 2025
- Plan review
- ConstructionJun '25 – Aug '25
- Inspectednow
- Closed
Scheduled to finish Aug 15, 2025; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
6 projectsRemove existing stud wall, add new metal stud wall and electrical outlets. — owl off road
TDLR project registrationRenovation/AlterationReview Complete15,300 sq ft$175K est.- Project #
- TABS2025020213
- Tenant / owner
- Owl Off Road Tenant Finish Out
- Design firm
- Pro
- Contact
- Pro
**zydeco addison park- stand-alone ep needed-upgrade-8408 annalise dr building b; wr# 471227**espa included
**zydeco addison park- stand-alone ep needed-upgrade-8408 annalise dr building b; wr# 471227**espa included
City of Austin permitElectrical PermitFinal- Record
- 2023-118037 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
**zydeco addison park- stand-alone ep needed-upgrade-8408 annalise dr building a; wr# 471227**espa included
**zydeco addison park- stand-alone ep needed-upgrade-8408 annalise dr building a; wr# 471227**espa included
City of Austin permitElectrical PermitFinal- Record
- 2023-118064 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New construction office/warehouse building. etj in contact with mike building. 2 60750 sq ft
New construction office/warehouse building. etj in contact with mike building. 2 60750 sq ft
City of Austin permitPlumbing PermitExpired- Record
- 2023-052961 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Installation repair ug domestic sanitary and fire line
Installation repair ug domestic sanitary and fire line
City of Austin permitPlumbing PermitFinal- Record
- 2023-054977 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation · City of Austin
Questions about 8408 Annalise Dr
What is being built at 8408 Annalise Drive?
Records describe an Owl Off Road tenant finish-out, including wall changes and new electrical outlets. The TDLR registration lists the work as a renovation or alteration.
What work is planned at 8408 Annalise Drive?
The description says an existing stud wall will be removed, a new metal stud wall added, and electrical outlets installed. The TDLR registration is dated June 2, 2025.
Is Owl Off Road opening at 8408 Annalise Drive?
The records identify an Owl Off Road tenant finish-out, but do not state an opening date or confirm that the business has opened.
When was the work at 8408 Annalise Drive permitted?
The City of Austin case for the Addison Commercial Park site plan was approved and released May 23, 2025. The TDLR registration for the Owl Off Road finish-out is dated June 2, 2025.
How much will the 8408 Annalise Drive project cost?
The TDLR registration lists an applicant-estimated project cost of $175,000. This is an estimate, not a reported final cost.
What is the Addison Commercial Park case at 8408 Annalise Drive?
Austin case 12818823 is listed as a site plan for Addison Commercial Park. Its status is approved and released, dated May 23, 2025.
Also being built nearby
All of 78744- 8408 Annalise Drive · Addison Business ParkJan 8, 2024Alsco — renovation/alteration — first time finish out in a new tilt wall building · 43 m away
- 8404 Annalise Drive · Balcones Re Addison 2022 LPOct 22, 2024Exceed atx office expansion — renovation/alteration — commercial interior improvement in part of a warehouse. tenant improvements include the renovation of part of a warehouse into an office area with restrooms and a meeting room · 55 m away
- 8409 Annalise DrSep 3, 2015Addison amenity center · 84 m away
- 8201 Annalise DrOct 5, 2026Install new 200a panel and make the existing main panel a sub panel. no increase to amperage or load. approved espa attached. will need disconnect/reconnect. etj · 178 m away
- 5000 Bonneville BndSep 4, 2026Base: installing a backup battery system and additional meter socket · 344 m away
- 5612 Daniel Alexander WayApr 9, 2025Repair on damaged electrical service ***emergency inspection done on 3/31/25-hyatt · 353 m away
- 5012 Bonneville BndAug 5, 2026Replacement of an existing water heater 50 gallon nat gas water heater replacement · 388 m away
- 5017 Ingersoll LnApr 11, 2024***new solar panels on new solar system*** installation of solar panels on existing residential roof. 5.2 kw · 394 m away
- 5509 Daniel Alexander WayMay 22, 2026Colton road storage · 398 m away
- 8012 Annalise DrOct 17, 2024Install tankless replace prv and install halo · 402 m away
- 5405 Daimler DrFeb 11, 2026Kinsey will tunnel under home following main sewer line in yard at cleanout under garage approx 10ft of tunnel. we will remove broken pvc pipe under garage and install new sched 40 pvc in its place. bed outside trench approx 5 ft in sand and hang pipe from slab every 6 ft. engineer report will be sent to city once tunnel is finished being exposed · 410 m away
- 7909 Izetta LnSep 20, 2024Disconnect/reconnect power to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size · 486 m away