8408 Annalise Drive
Austin, TX 78744 · Addison Business Park
Two-building business park at 8408 Annalise Drive
TDLR records describe a two-building business park at 8408 Annalise Drive, registered for new construction on August 10, 2023. A separate registration filed January 8, 2024, describes an 8,835-square-foot first-time finish-out for Alsco in a new tilt-wall building.
Summarized from Texas Department of Licensing and Regulation records · updated Jan 8, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Jan 8, 2024
- since Jan 8, 2024
- Largest scope
- 8,835 sf
- Estimated cost
- $17M
- state registration
Where this project stands
CompletedAlsco
8,835 sq ft · $130K est.
- RegisteredJan 8, 2024
- Plan review
- ConstructionJan '24 – Apr '24
- Inspected
- Closed
Ran as a 3-month build.
4 contacts on this project · 4 phone numbers
Permit & project history
2 projectsFirst time finish out in a new tilt wall building. — addison business park
TDLR project registrationRenovation/AlterationProject Closed8,835 sq ft$130K est.- Project #
- TABS2024008766
- Tenant / owner
- Pro
- Design firm
- Pro
- Contact
- Pro
2 building business park — addison business park
TDLR project registrationNew ConstructionProject Closed121,950 sq ft$17M est.- Project #
- TABS2023025579
- Tenant / owner
- Addison Business Park
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 8408 Annalise Drive
What is being built at 8408 Annalise Drive in Austin?
TDLR records describe a two-building business park registered for new construction on August 10, 2023. A later registration describes an Alsco finish-out in a new tilt-wall building.
What is the Alsco project at 8408 Annalise Drive?
A TDLR registration filed January 8, 2024, describes an 8,835-square-foot first-time finish-out for Alsco in a new tilt-wall building. The registration lists the project as closed.
When was the business park at 8408 Annalise Drive registered?
The new-construction registration for the two-building business park was filed August 10, 2023. It lists 121,950 square feet and an applicant-estimated project cost of $16,661,000.
Is Alsco opening at 8408 Annalise Drive?
The TDLR record describes an Alsco first-time finish-out, filed January 8, 2024, and lists the project as closed. It does not confirm whether Alsco has opened there.
How large is the Alsco finish-out at 8408 Annalise Drive?
The TDLR registration lists the Alsco finish-out at 8,835 square feet. It was filed January 8, 2024.
What is being built near Balcones Re Addison 2022?
At 8408 Annalise Drive, 13 meters from Balcones Re Addison 2022, TDLR records describe a two-building business park. Its new-construction registration was filed August 10, 2023.
Also being built nearby
All of 78744- 8404 Annalise Drive · Balcones Re Addison 2022 LPOct 22, 2024Exceed atx office expansion — renovation/alteration — commercial interior improvement in part of a warehouse. tenant improvements include the renovation of part of a warehouse into an office area with restrooms and a meeting room · 13 m away
- 8408 Annalise Dr · Balcones Re Addison 2022 LPJun 2, 2025Owl off road tenant finish out — renovation/alteration — remove existing stud wall, add new metal stud wall and electrical outlets · 43 m away
- 8409 Annalise DrSep 3, 2015Addison amenity center · 90 m away
- 8201 Annalise DrOct 5, 2026Install new 200a panel and make the existing main panel a sub panel. no increase to amperage or load. approved espa attached. will need disconnect/reconnect. etj · 136 m away
- 5000 Bonneville BndSep 4, 2026Base: installing a backup battery system and additional meter socket · 346 m away
- 8012 Annalise DrOct 17, 2024Install tankless replace prv and install halo · 368 m away
- 5017 Ingersoll LnApr 11, 2024***new solar panels on new solar system*** installation of solar panels on existing residential roof. 5.2 kw · 381 m away
- 5405 Daimler DrFeb 11, 2026Kinsey will tunnel under home following main sewer line in yard at cleanout under garage approx 10ft of tunnel. we will remove broken pvc pipe under garage and install new sched 40 pvc in its place. bed outside trench approx 5 ft in sand and hang pipe from slab every 6 ft. engineer report will be sent to city once tunnel is finished being exposed · 383 m away
- 5612 Daniel Alexander WayApr 9, 2025Repair on damaged electrical service ***emergency inspection done on 3/31/25-hyatt · 387 m away
- 5012 Bonneville BndAug 5, 2026Replacement of an existing water heater 50 gallon nat gas water heater replacement · 386 m away
- 5509 Daniel Alexander WayMay 22, 2026Colton road storage · 439 m away
- 7909 Izetta LnSep 20, 2024Disconnect/reconnect power to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size · 455 m away