401 Congress Avenue
Austin, TX 78746 · Cshv-401 Congress, LLC
Rapid 7 office alteration registered at 401 Congress Avenue
A 2,907-square-foot interior alteration of existing office space is registered at 401 Congress Avenue. The TDLR project registration, which names Rapid 7, was filed September 16, 2025, and is marked Review Complete. The applicant's estimated project cost is $285,000.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 16, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 16, 2025
- since Sep 16, 2025
- Largest scope
- 2,907 sf
- Estimated cost
- $285K
- state registration
Where this project stands
Finishing up · inspection nextRapid 7
2,907 sq ft · $285K est.
- RegisteredSep 16, 2025
- Plan review
- ConstructionOct '25 – Jun '26
- Inspectednow
- Closed
Scheduled to finish Jun 30, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectInterior alteration of existing office space — frost tower
TDLR project registrationRenovation/AlterationReview Complete2,907 sq ft$285K est.- Project #
- TABS2026001021
- Tenant / owner
- Rapid 7
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 401 Congress Avenue
What is being built at 401 Congress Avenue?
A TDLR registration describes a 2,907-square-foot interior alteration of existing office space. It does not describe a new building.
Is Rapid 7 opening at 401 Congress Avenue?
The TDLR project registration names Rapid 7 and describes an alteration of existing office space. It does not say that a new location is opening.
When was the 401 Congress Avenue project filed?
The TDLR registration was filed September 16, 2025. It is marked Review Complete.
How much will the 401 Congress office alteration cost?
The applicant's estimated cost is $285,000. This is an estimate for the project, not a confirmed final cost.
How large is the office alteration at 401 Congress?
The registered project covers 2,907 square feet of existing office space.
What's changing near Congress Commons on Congress Avenue?
At 401 Congress Avenue, about 89 meters from Congress Commons at 323 Congress Avenue, a TDLR registration describes an interior alteration of existing office space. The registration names Rapid 7 and was filed September 16, 2025.
Also being built nearby
All of 78746- 401 Congress Avenue · Cshv-401 Congress, LLCAug 30, 2025Level 32 restrooms at frost tower — renovation/alteration — interior renovation of existing restrooms
- 401 Congress · Cshv-401 Congress, LLCJul 2, 2025Frost bank spec suites floor 20 — renovation/alteration — interior renovation of existing space
- 401 Congress Ave · Cshv-401 Congress, LLCNov 9, 2026Phase 2: interior expansion of eys existing suite project will include new meeting rooms breakroom demountable walls new finishes: carcarpet acoustical ceiling tile paint tile and light fixtures · 10 m away
- 412 Congress AveMar 13, 20262026/03/12 - 2026/03/16 | (2026/03/11 - 2026/03/17) | the project involves the temporary installation of window branding for an sxsw-related activation at the venue. the branding consists of adhesive vinyl graphics applied to exterior window surfaces as well as several removable elements including magnetic panels and one lightweight foam board (forex/phorex) panel. #sxswaffiliated #tpwonly (location: speakeasy austin) attaching branding to speakeasy facade some magnetic branding elements are secured using corresponding magnets placed on the interior side of the windows. no permanent fixtures or structural attachments will be made to the building faade. installation method: all installation and removal work will be carried out manually by a small production team using standard step ladders. no scissor lifts vehicles cranes or heavy machinery will be used. right-of-way impact: work will take place directly adjacent to the building faade along the sidewalk. ladders and staff will temporarily occupy a small portion of the sidewalk directly in front of the windows during installation and removal. pedestrian access will be maintained at all times. no street lanes parking spaces or bike lanes will be closed or impacted. schedule initial installation march 11 10:00 am 6:00 pm branding adjustment (lower windows switching to berlin house imagery) march 14 8:00 10:00 am branding reset (switching back to german haus branding) march 15 8:00 10:00 am removal of all branding march 17 8:00 am 12:00 pm traffic control: a small temporary work zone will be established immediately adjacent to the building faade on the sidewalk. step ladders will be used and monitored by staff at all times. pedestrian access will remain open and safe passage will be maintained. no roadway parking or bike lane closures are required · 17 m away
- 100 W 4th StMar 13, 20262026/03/15 - 2026/03/18 | (2026/03/12) | (we order one outside 400sqft booth in sxsw2026 (show date: 12th-18th mar) #sxswaffiliated · 33 m away
- 400 Congress AveNov 18, 2026Esp - project bolo · 54 m away
- 327 Congress AveDec 13, 2023Replacement of an existing water heater. change out a roof top boiler like for like · 85 m away
- 103 E 5th StFeb 5, 202628513 austin convention center projection sign · 85 m away
- 416 Congress AveApr 16, 2020Boutique hotel at 416 congress · 87 m away
- 105 E 5th StApr 8, 2026Eplan - interior remodel of existing office · 88 m away
- 422 Congress AveJan 30, 2016422 congress land use · 89 m away
- 323 Congress AveFeb 24, 2026Interior remodel - single tenant floor - secure bay · 89 m away
More offices in 78746.