401 Congress
Austin, TX 78701 · Frost Bank Spec Suites Floor 20, Level 21 Spec Suites
Spec suites being renovated at Frost Bank Tower
Interior renovations for spec suites are planned in existing space at 401 Congress, in the multi-tenant Frost Bank Tower. TDLR registrations dated December 23, 2024, and July 2, 2025, describe work on Level 21 and Floor 20, respectively.
Summarized from Texas Department of Licensing and Regulation records · updated Jul 2, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Jul 2, 2025
- since Dec 23, 2024
- Largest scope
- 20,688 sf
- Estimated cost
- $4.2M
- state registration
Where this project stands
Finishing up · inspection nextFrost Bank Spec Suites Floor 20
10,328 sq ft · $1.3M est.
- RegisteredJul 2, 2025
- Plan review
- ConstructionJul '25 – Dec '25
- Inspectednow
- Closed
Scheduled to finish Dec 19, 2025; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
2 projectsInterior renovation of existing space — frost bank tower
TDLR project registrationRenovation/AlterationReview Complete10,328 sq ft$1.3M est.- Project #
- TABS2025022631
- Tenant / owner
- Frost Bank Spec Suites Floor 20
- Design firm
- Pro
- Contact
- Pro
Interior renovation of existing space — frost bank tower
TDLR project registrationRenovation/AlterationReview Complete20,688 sq ft$4.2M est.- Project #
- TABS2025008433
- Tenant / owner
- Level 21 Spec Suites
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 401 Congress
What is being built at 401 Congress in Austin?
TDLR records describe interior renovations of existing space for spec suites at Frost Bank Tower, not a new building. The projects are on Level 21 and Floor 20.
Is a new building going up at 401 Congress?
No new building is described in these records. Both registrations are for renovations of existing interior space in the multi-tenant Frost Bank Tower.
When were the Frost Bank Tower suite renovations registered?
The Level 21 Spec Suites project was registered on December 23, 2024. The Frost Bank Spec Suites Floor 20 project was registered on July 2, 2025.
How large are the suite renovation projects at 401 Congress?
The TDLR registration lists 20,688 square feet for the Level 21 project and 10,328 square feet for the Floor 20 project.
What is the estimated cost of the work at 401 Congress?
The fact sheet lists a TDLR estimated project cost of $4.2 million. This is an estimate, not a confirmed final cost.
What’s being renovated near Congress Commons?
The suite renovations are at 401 Congress, about 89 meters from Congress Commons at 323 Congress Avenue. TDLR records describe work in existing Frost Bank Tower space.
Also being built nearby
All of 78701- 401 Congress Avenue · Cshv-401 Congress, LLCAug 30, 2025Level 32 restrooms at frost tower — renovation/alteration — interior renovation of existing restrooms
- 401 Congress Avenue · Cshv-401 Congress, LLCSep 16, 2025Rapid 7 — renovation/alteration — interior alteration of existing office space
- 401 Congress Ave · Cshv-401 Congress, LLCNov 9, 2026Phase 2: interior expansion of eys existing suite project will include new meeting rooms breakroom demountable walls new finishes: carcarpet acoustical ceiling tile paint tile and light fixtures · 10 m away
- 400 Congress AveOct 19, 20262026/10/22 - 2026/10/25 | (2026/10/14) | mercedes-amg petronas f1 fan hub - 4 day free public event featuring f1 simulators interactive activations music and f&b · 13 m away
- 412 Congress AveMar 13, 20262026/03/12 - 2026/03/16 | (2026/03/11 - 2026/03/17) | the project involves the temporary installation of window branding for an sxsw-related activation at the venue. the branding consists of adhesive vinyl graphics applied to exterior window surfaces as well as several removable elements including magnetic panels and one lightweight foam board (forex/phorex) panel. #sxswaffiliated #tpwonly (location: speakeasy austin) attaching branding to speakeasy facade some magnetic branding elements are secured using corresponding magnets placed on the interior side of the windows. no permanent fixtures or structural attachments will be made to the building faade. installation method: all installation and removal work will be carried out manually by a small production team using standard step ladders. no scissor lifts vehicles cranes or heavy machinery will be used. right-of-way impact: work will take place directly adjacent to the building faade along the sidewalk. ladders and staff will temporarily occupy a small portion of the sidewalk directly in front of the windows during installation and removal. pedestrian access will be maintained at all times. no street lanes parking spaces or bike lanes will be closed or impacted. schedule initial installation march 11 10:00 am 6:00 pm branding adjustment (lower windows switching to berlin house imagery) march 14 8:00 10:00 am branding reset (switching back to german haus branding) march 15 8:00 10:00 am removal of all branding march 17 8:00 am 12:00 pm traffic control: a small temporary work zone will be established immediately adjacent to the building faade on the sidewalk. step ladders will be used and monitored by staff at all times. pedestrian access will remain open and safe passage will be maintained. no roadway parking or bike lane closures are required · 17 m away
- 100 W 4th StMar 13, 20262026/03/15 - 2026/03/18 | (2026/03/12) | (we order one outside 400sqft booth in sxsw2026 (show date: 12th-18th mar) #sxswaffiliated · 33 m away
- 327 Congress AveDec 13, 2023Replacement of an existing water heater. change out a roof top boiler like for like · 85 m away
- 103 E 5th StFeb 5, 202628513 austin convention center projection sign · 85 m away
- 416 Congress AveApr 16, 2020Boutique hotel at 416 congress · 87 m away
- 105 E 5th StApr 8, 2026Eplan - interior remodel of existing office · 88 m away
- 422 Congress AveJan 30, 2016422 congress land use · 89 m away
- 323 Congress Avenue · Cpreif Congress Commons, LLCJan 28, 2026Accenture - 323 congress 3rd floor secure bay — renovation/alteration — interior remodel of tenant's existing level 3 open office to include addition of new wall and door and limited electrical and mechanical · 89 m away