4711 Live Oak St
Dallas, TX 75204
HVAC replacement permitted at 4711 Live Oak St
A residential HVAC replacement was permitted at 4711 Live Oak St on June 5, 2026. The City of Dallas permit describes a Lennox 4-ton horizontal gas system replacement.
Summarized from City of Dallas records · updated Jun 5, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 5, 2026
- since Jun 5, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 4711 Live Oak St
What is being built at 4711 Live Oak St?
The City of Dallas permit indicates an HVAC replacement, not a new building project. It describes a Lennox 4-ton horizontal gas system.
When was the HVAC work at 4711 Live Oak St permitted?
The residential mechanical permit was filed on June 5, 2026. The permit number is RES-MEC-26-002759.
What type of HVAC system is being installed at 4711 Live Oak St?
The permit description specifies a Lennox 4-ton SL25KCV horizontal gas system replacement.
Is a new home being built at 4711 Live Oak St?
The available City of Dallas record is for a residential mechanical permit describing HVAC replacement. It does not indicate a new home construction project.
What is happening near Circle Park Texas II on Live Oak Street?
At 4711 Live Oak St, about 180 meters from Circle Park Texas II at 4812 Bryan Street, a residential HVAC replacement was permitted on June 5, 2026.
Also being built nearby
All of 75204- 4715 Live Oak StJun 23, 2025Installation of new air conditioning system and duct · 4 m away
- 4801 Live Oak StOct 8, 2020Remove existing roof and install new roof · 91 m away
- 4805 Live Oak StMay 7, 2026Electrical for new construction · 94 m away
- 4811 Live Oak StSep 3, 2026Performed removal and replacement of the damaged sewer line due to blockage, deterioration, leaks, root intrusion, or pipe failure affecting proper drainage and sewer function. existing sewer piping showed signs of age-related wear and was no longer operating properly, causing drainage issues and potential risk of sewage backup.work included excavation as needed to access the affected sewer line, removal of damaged piping, and installation of new sewer piping in accordance with current plumbing codes and standards. all connections were properly sealed and tested to ensure correct flow and prevent leaks. after installation, the sewer system was tested for proper drainage and operation. excavated areas were backfilled and job site was cleaned upon completion.replacement of the sewer line helps restore proper drainage, prevent future backups, reduce the risk of water damage, and improve the reliability of the plumbing system · 99 m away
- 4810 Live Oak StJul 3, 2025Gas testapartment #8 · 100 m away
- 4815 Live Oak StNov 2, 2026Replace electrical house plano · 103 m away
- 4820 Live Oak StOct 14, 2020Gas relay or repair with test · 108 m away
- 4630 Live Oak StSep 10, 2026Gas test · 129 m away
- 4807 Sycamore StNov 7, 202688 ft lineal feet of floor joist2 pad & block set · 150 m away
- 4813 Sycamore StOct 15, 2026Re roof, apply tpo roofing system · 153 m away
- 4705 Bryan StDec 7, 2020Install car charging station · 159 m away
- 4709 Bryan StDec 30, 2025Gas test · 159 m away