4810 Live Oak St
Dallas, TX 75204
Gas test permit filed for apartment #8
A commercial plumbing permit for a gas test at apartment #8 was filed on July 3, 2025. The City of Dallas record does not identify other work or a broader construction project.
Summarized from City of Dallas records · updated Jul 3, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 3, 2025
- since Jul 3, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 4810 Live Oak St
What is happening at 4810 Live Oak St?
A City of Dallas commercial plumbing permit records a gas test at apartment #8. It was filed July 3, 2025, under permit COM-PLM-25-000665.
Is a new apartment building being built at 4810 Live Oak St?
The available permit record does not describe a new apartment building. It records a gas test for apartment #8.
When was the permit filed for 4810 Live Oak St?
The commercial plumbing permit was filed on July 3, 2025.
What type of permit was issued for 4810 Live Oak St?
The City of Dallas record lists a commercial plumbing permit for a gas test at apartment #8.
What work is planned near Mao Lao Restaurant on Bryan Street?
A permit at 4810 Live Oak St, about 174 meters from Mao Lao Restaurant, records a gas test at apartment #8. The permit was filed July 3, 2025.
Also being built nearby
All of 75204- 4820 Live Oak StOct 14, 2020Gas relay or repair with test · 8 m away
- 4811 Live Oak StSep 3, 2026Performed removal and replacement of the damaged sewer line due to blockage, deterioration, leaks, root intrusion, or pipe failure affecting proper drainage and sewer function. existing sewer piping showed signs of age-related wear and was no longer operating properly, causing drainage issues and potential risk of sewage backup.work included excavation as needed to access the affected sewer line, removal of damaged piping, and installation of new sewer piping in accordance with current plumbing codes and standards. all connections were properly sealed and tested to ensure correct flow and prevent leaks. after installation, the sewer system was tested for proper drainage and operation. excavated areas were backfilled and job site was cleaned upon completion.replacement of the sewer line helps restore proper drainage, prevent future backups, reduce the risk of water damage, and improve the reliability of the plumbing system · 13 m away
- 4815 Live Oak StNov 2, 2026Replace electrical house plano · 13 m away
- 4805 Live Oak StMay 7, 2026Electrical for new construction · 14 m away
- 4801 Live Oak StOct 8, 2020Remove existing roof and install new roof · 15 m away
- 4901 Live Oak StJul 10, 2025Gas test on new tenant unit, have service turned on · 85 m away
- 4715 Live Oak StJun 23, 2025Installation of new air conditioning system and duct · 97 m away
- 4711 Live Oak StJun 5, 2026Hvac replacement lennox 4 ton sl25kcv horizontal gas complete · 100 m away
- 4807 Sycamore StNov 7, 202688 ft lineal feet of floor joist2 pad & block set · 101 m away
- 4813 Sycamore StOct 15, 2026Re roof, apply tpo roofing system · 101 m away
- 4810 Sycamore StJun 16, 20254 exterior pier, 4 exterior steel pier, 49ft shaker beam, 207ft floor joist, 8 new blocks, 62ft sill replacement · 119 m away
- 4931 Live Oak StOct 21, 2025Installation of new plumbing for new construction multifamily apartments · 125 m away