4931 Live Oak St
Dallas, TX 75206
Plumbing permits filed for new multifamily apartments
City of Dallas permits indicate plumbing work for new-construction multifamily apartments at 4931 Live Oak St. Four commercial plumbing permits were filed from Oct. 9 to Oct. 21, 2025.
Summarized from City of Dallas records · updated Oct 21, 2025
- Projects
- 4
- 4 filings
- Latest filing
- Oct 21, 2025
- since Oct 9, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsSources: City of Dallas
Questions about 4931 Live Oak St
What is being built at 4931 Live Oak St?
City of Dallas permit descriptions identify new-construction multifamily apartments, with permits for plumbing work.
When were permits filed for 4931 Live Oak St?
The four plumbing permits were filed on Oct. 9 and Oct. 21, 2025.
What do the permits at 4931 Live Oak St cover?
They cover installation of new plumbing for new-construction multifamily apartments. The permit numbers are COM-PLM-25-002130, COM-PLM-25-002250, COM-PLM-25-002251 and COM-PLM-25-002252.
How many apartments are planned at 4931 Live Oak St?
The permit records describe multifamily apartments but do not specify a unit count.
What’s going in near Mao Lao Restaurant on Bryan Street?
About 197 meters from Mao Lao Restaurant, permits at 4931 Live Oak St indicate new-construction multifamily apartments and plumbing work.
Also being built nearby
All of 75206- 4901 Live Oak StJul 10, 2025Gas test on new tenant unit, have service turned on · 40 m away
- 4820 Live Oak StOct 14, 2020Gas relay or repair with test · 117 m away
- 4815 Live Oak StNov 2, 2026Replace electrical house plano · 121 m away
- 4811 Live Oak StSep 3, 2026Performed removal and replacement of the damaged sewer line due to blockage, deterioration, leaks, root intrusion, or pipe failure affecting proper drainage and sewer function. existing sewer piping showed signs of age-related wear and was no longer operating properly, causing drainage issues and potential risk of sewage backup.work included excavation as needed to access the affected sewer line, removal of damaged piping, and installation of new sewer piping in accordance with current plumbing codes and standards. all connections were properly sealed and tested to ensure correct flow and prevent leaks. after installation, the sewer system was tested for proper drainage and operation. excavated areas were backfilled and job site was cleaned upon completion.replacement of the sewer line helps restore proper drainage, prevent future backups, reduce the risk of water damage, and improve the reliability of the plumbing system · 125 m away
- 4810 Live Oak StJul 3, 2025Gas testapartment #8 · 125 m away
- 4805 Live Oak StMay 7, 2026Electrical for new construction · 130 m away
- 4801 Live Oak StOct 8, 2020Remove existing roof and install new roof · 133 m away
- 4918 Bryan StJul 24, 2026Build 245 fr of wood fence using metal posts set 30inches in the ground using 4000psi concrete. also installing 2 pedestrian access gates · 149 m away
- 4810 Sycamore StJun 16, 20254 exterior pier, 4 exterior steel pier, 49ft shaker beam, 207ft floor joist, 8 new blocks, 62ft sill replacement · 157 m away
- 4813 Sycamore StOct 15, 2026Re roof, apply tpo roofing system · 167 m away
- 1163 N Fitzhugh AveSep 17, 2025Install electrical service for a charter power supply cabinet · 171 m away
- 1283 N Collett AveMay 6, 2026Electrical service for traffic signal · 172 m away