4901 Live Oak St
Dallas, TX 75206
Gas test filed for a new tenant unit at 4901 Live Oak
A City of Dallas commercial plumbing permit describes a gas test for a new tenant unit at 4901 Live Oak St. The permit was filed July 10, 2025; it does not name the tenant or describe a larger construction project.
Summarized from City of Dallas records · updated Jul 10, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 10, 2025
- since Jul 10, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 4901 Live Oak St
What is happening at 4901 Live Oak St?
A City of Dallas permit records a gas test for a new tenant unit, with service to be turned on. The permit is COM-PLM-25-000719, filed July 10, 2025.
Is a new building being built at 4901 Live Oak St?
The available permit describes a gas test for a new tenant unit, not construction of a new building. It does not provide a project size or construction details.
Is a new business opening at 4901 Live Oak St?
The permit does not identify the tenant or say what kind of business may occupy the unit. It records only a gas test and a request to turn on service.
When was the permit filed for 4901 Live Oak St?
The City of Dallas permit was filed July 10, 2025. Its number is COM-PLM-25-000719.
What's happening near Mao Lao Restaurant on Bryan Street?
A City of Dallas permit for 4901 Live Oak St, 177 meters from Mao Lao Restaurant at 4823 Bryan St, records a gas test for a new tenant unit. The record does not indicate a connection to the restaurant.
Also being built nearby
All of 75206- 4931 Live Oak StOct 21, 2025Installation of new plumbing for new construction multifamily apartments · 40 m away
- 4820 Live Oak StOct 14, 2020Gas relay or repair with test · 77 m away
- 4815 Live Oak StNov 2, 2026Replace electrical house plano · 81 m away
- 4811 Live Oak StSep 3, 2026Performed removal and replacement of the damaged sewer line due to blockage, deterioration, leaks, root intrusion, or pipe failure affecting proper drainage and sewer function. existing sewer piping showed signs of age-related wear and was no longer operating properly, causing drainage issues and potential risk of sewage backup.work included excavation as needed to access the affected sewer line, removal of damaged piping, and installation of new sewer piping in accordance with current plumbing codes and standards. all connections were properly sealed and tested to ensure correct flow and prevent leaks. after installation, the sewer system was tested for proper drainage and operation. excavated areas were backfilled and job site was cleaned upon completion.replacement of the sewer line helps restore proper drainage, prevent future backups, reduce the risk of water damage, and improve the reliability of the plumbing system · 84 m away
- 4810 Live Oak StJul 3, 2025Gas testapartment #8 · 85 m away
- 4805 Live Oak StMay 7, 2026Electrical for new construction · 89 m away
- 4801 Live Oak StOct 8, 2020Remove existing roof and install new roof · 93 m away
- 4810 Sycamore StJun 16, 20254 exterior pier, 4 exterior steel pier, 49ft shaker beam, 207ft floor joist, 8 new blocks, 62ft sill replacement · 137 m away
- 4813 Sycamore StOct 15, 2026Re roof, apply tpo roofing system · 140 m away
- 4807 Sycamore StNov 7, 202688 ft lineal feet of floor joist2 pad & block set · 143 m away
- 4918 Bryan StJul 24, 2026Build 245 fr of wood fence using metal posts set 30inches in the ground using 4000psi concrete. also installing 2 pedestrian access gates · 151 m away
- 1163 N Fitzhugh AveSep 17, 2025Install electrical service for a charter power supply cabinet · 164 m away