Sewer line replaced at 4811 Live Oak St
A damaged sewer line was replaced at 4811 Live Oak St under a City of Dallas commercial plumbing permit filed September 3, 2026. The work included removing and replacing the affected piping, then testing it for proper drainage and leaks.
Summarized from City of Dallas records · updated Sep 3, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 3, 2026
- since Sep 3, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectPerformed removal and replacement of the damaged sewer line due to blockage, deterioration, leaks, root intrusion, or pipe failure affecting proper drainage and sewer function. existing sewer piping showed signs of age-related wear and was no longer operating properly, causing drainage issues and potential risk of sewage backup.work included excavation as needed to access the affected sewer line, removal of damaged piping, and installation of new sewer piping in accordance with current plumbing codes and standards. all connections were properly sealed and tested to ensure correct flow and prevent leaks. after installation, the sewer system was tested for proper drainage and operation. excavated areas were backfilled and job site was cleaned upon completion.replacement of the sewer line helps restore proper drainage, prevent future backups, reduce the risk of water damage, and improve the reliability of the plumbing system
Performed removal and replacement of the damaged sewer line due to blockage, deterioration, leaks, root intrusion, or pipe failure affecting proper drainage and sewer function. existing sewer piping showed signs of age-related wear and was no longer operating properly, causing drainage issues and potential risk of sewage backup.work included excavation as needed to access the affected sewer line, removal of damaged piping, and installation of new sewer piping in accordance with current plumbing codes and standards. all connections were properly sealed and tested to ensure correct flow and prevent leaks. after installation, the sewer system was tested for proper drainage and operation. excavated areas were backfilled and job site was cleaned upon completion.replacement of the sewer line helps restore proper drainage, prevent future backups, reduce the risk of water damage, and improve the reliability of the plumbing system
City of Dallas permitCommercial Plumbing Permit
Sources: City of Dallas
Questions about 4811 Live Oak St
What work was permitted at 4811 Live Oak St?
A City of Dallas permit covers replacement of a damaged sewer line. The work included excavation as needed, installation of new piping, and testing.
When was the sewer line permit filed?
The permit was filed September 3, 2026. Its permit number is COM-PLM-26-001927.
Is a new building being constructed at 4811 Live Oak St?
The record describes sewer line replacement, not construction of a new building.
What caused the sewer line replacement at 4811 Live Oak St?
The permit description says the existing pipe showed signs of age-related wear and was not operating properly, causing drainage issues. It lists blockage, deterioration, leaks, root intrusion, or pipe failure as possible issues.
What is being done near Mao Lao Restaurant on Bryan Street?
A sewer line was replaced at 4811 Live Oak St, about 162 meters from Mao Lao Restaurant at 4823 Bryan St. The City of Dallas permit was filed September 3, 2026.
Also being built nearby
All of 75204- 4815 Live Oak StNov 2, 2026Replace electrical house plano · 3 m away
- 4805 Live Oak StMay 7, 2026Electrical for new construction · 5 m away
- 4801 Live Oak StOct 8, 2020Remove existing roof and install new roof · 8 m away
- 4810 Live Oak StJul 3, 2025Gas testapartment #8 · 13 m away
- 4820 Live Oak StOct 14, 2020Gas relay or repair with test · 15 m away
- 4901 Live Oak StJul 10, 2025Gas test on new tenant unit, have service turned on · 84 m away
- 4715 Live Oak StJun 23, 2025Installation of new air conditioning system and duct · 96 m away
- 4711 Live Oak StJun 5, 2026Hvac replacement lennox 4 ton sl25kcv horizontal gas complete · 99 m away
- 4807 Sycamore StNov 7, 202688 ft lineal feet of floor joist2 pad & block set · 114 m away
- 4813 Sycamore StOct 15, 2026Re roof, apply tpo roofing system · 114 m away
- 4931 Live Oak StOct 21, 2025Installation of new plumbing for new construction multifamily apartments · 125 m away
- 4810 Sycamore StJun 16, 20254 exterior pier, 4 exterior steel pier, 49ft shaker beam, 207ft floor joist, 8 new blocks, 62ft sill replacement · 131 m away