groundranger
Historic · latest filing Oct 2020Commercial

4820 Live Oak St

Dallas, TX 75204

4820 Live Oak St: 1 project on record

City of Dallas lists 1 filing across 1 project at 4820 Live Oak St, Dallas, TX 75204. The most recent, filed October 14, 2020, covers: “Gas relay or repair with test”.

Compiled from City of Dallas records · updated Oct 14, 2020

Projects
1
1 filings
Latest filing
Oct 14, 2020
since Oct 14, 2020
Largest scope
—
Listed value
$1
partial · often understated

Permit & project history

1 project
  1. Gas relay or repair with test

    Gas relay or repair with test

    City of Dallas permitPlumbing (PL) Single Family Alteration$1
    Record
    2010143005
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 4820 Live Oak St

What is being built at 4820 Live Oak St?

The latest filing (City of Dallas permit 2010143005, October 14, 2020) covers gas relay or repair with test.

How many permits and filings does 4820 Live Oak St have?

1 filing across 1 project, from October 14, 2020 to October 14, 2020.

How much is the construction at 4820 Live Oak St worth?

Permits at this address list about $1 in valuations. Permit valuations are often partial and understate total project cost.

What is being built near Circle Park Texas Ii, in Dallas?

4820 Live Oak St is about 161 m from Circle Park Texas Ii, (4812 Bryan Street). Its latest filing is for gas relay or repair with test.

Is there other construction near 4820 Live Oak St?

Yes. Nearby filings include 4810 Live Oak St (gas testapartment #8, Jul 3, 2025); 4815 Live Oak St (replace electrical house plano, Nov 2, 2026); 4811 Live Oak St (performed removal and replacement of the damaged sewer line due to blockage, deterioration, leaks, root intrusion, or pipe failure affecting proper drainage and sewer function. existing sewer piping showed signs of age-related wear and was no longer operating properly, causing drainage issues and potential risk of sewage backup.work included excavation as needed to access the affected sewer line, removal of damaged piping, and installation of new sewer piping in accordance with current plumbing codes and standards. all connections were properly sealed and tested to ensure correct flow and prevent leaks. after installation, the sewer system was tested for proper drainage and operation. excavated areas were backfilled and job site was cleaned upon completion.replacement of the sewer line helps restore proper drainage, prevent future backups, reduce the risk of water damage, and improve the reliability of the plumbing system, Sep 3, 2026).

How do I get alerts for new permits at 4820 Live Oak St?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 75204
Get alerts for 4820 Live Oak St