4914 Greenville Ave
Dallas, TX 75206
Gas test permits filed at 4914 Greenville Ave
City of Dallas records show two commercial plumbing permits for gas tests at 4914 Greenville Ave. They were filed on February 13 and May 4, 2026; the records do not describe a larger project.
Summarized from City of Dallas records · updated May 4, 2026
- Projects
- 2
- 2 filings
- Latest filing
- May 4, 2026
- since Feb 13, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 4914 Greenville Ave
What is happening at 4914 Greenville Ave?
City of Dallas records show two commercial plumbing permits for gas tests: COM-PLM-26-000564, filed February 13, 2026, and COM-PLM-26-001690, filed May 4, 2026.
What is being built at 4914 Greenville Ave?
The available records do not identify a new building. They list two commercial plumbing permits with the description “Gas test,” filed in February and May 2026.
Is a new business opening at 4914 Greenville Ave?
The permit records do not name a business or say that one is opening. They document gas tests under commercial plumbing permits filed February 13 and May 4, 2026.
What are the permit numbers for 4914 Greenville Ave?
The two City of Dallas permits are COM-PLM-26-000564, filed February 13, 2026, and COM-PLM-26-001690, filed May 4, 2026. Both are commercial plumbing permits for gas tests.
What's happening near Atelier Yoga on Greenville Avenue?
At 4914 Greenville Ave, about 8 meters from Atelier Yoga at 4912 Greenville Ave, City of Dallas records show two commercial plumbing permits for gas tests. They were filed February 13 and May 4, 2026.
Also being built nearby
All of 75206- 4912 Greenville AveMar 19, 2026Install 2 3-ton package units, install all ductwork, install drain lines, install exhaust fans in restrooms · 8 m away
- 4908 Greenville Ave · Veery Green LLCJan 6, 2026Install mini split system · 24 m away
- 4930 Greenville AveJul 27, 2026Oncor's drop and one of the feeders were damaged by a garbage truck. service needs to be disconnected for repair, but oncor requires the meter base to be relocated to the exterior of the building.we are installing a new 320-amp meter base and a new 400-amp fusible disconnect on the exterior, installing new parallel feeders, and reworking grounds to the new first means of disconnect · 40 m away
- 4925 Greenville AveNov 16, 2026Mcr at some point over the years, suites 700 and 720 were joined into one suite (with no building permit or a change to the certificate of occupancy. a new tenant is moving into the suite, as suite 720. no current work is taking place. this permit is for recording the changes that were made at some point prior to now · 50 m away
- 4925 Greenville AveFeb 23, 2026Adding stage power & vendor power next to stage · 50 m away
- 4925 Greenville Avenue · US Energy Square, LLCJul 7, 2025Arco / murray expansion — renovation/alteration — interior renovation of existing office space in a high rise building · 50 m away
- 4925 Greenville Avenue · US Energy Square LLCNov 19, 2025Five states energy — renovation/alteration — renovation of existing 8,604 square foot interior office space · 50 m away
- 5010 Greenville AveJul 27, 2026New 5 ton split system · 101 m away
- 5030 Greenville Ave · 5030 Greenville Ave, LLCJun 27, 2025Interior remodeling the subcontract agreement covers the furnishing of tools, equipment, materials, supplies, engineering, scaffolding, incidentals, labor, supervision, cleaning, services, insurance, warranties, testing, and/or any other act or thing required to diligently and fully perform and complete the portions of work described herein. 2. in addition to the foregoing, it is further understood and agreed that this subcontract agreement also includes, but is not limited to, the following conditions and items, regardless of whether or not they are in listed contract documents. the items listed below are not intended to represent each and every item necessary to perform the work. 3. all deviations from or discrepancies to the contract documents must be brought to the immediate attention of the contractor in writing with sufficient details, references, and explanations to permit proper analysis. suggested solutions or substitutions shall accompany the notification whenever possible. 4. all work shall meet or exceed any and all applicable local, city, state, or federal codes and guidelines. 5. the subcontractor shall set up, arrange, coordinate, and obtain all inspections for its work as required by any authorized agency or applicable code. arrangements for the inspection of any area, system, equipment, etc., that are in need of testing or inspection prior to being covered up must be made by the subcontractor in sufficient time to allow for inspections so as not to impact the project schedule. in the event of low or substandard test results, the subcontractor shall be responsible for all costs involved in retesting of the materials/work in question and the replacement of inadequate materials/work. 6. subcontractor is responsible for providing certifications and licensing as required. 7. subcontractor is responsible for all fees 8. subcontractor is responsible for taxes 9. subcontractor shall provide competent personnel supervision at all times while on site and during your contracted trade inspections ($250.00 associated fee for each absence). 10. contractor shall provide general building permit. all other permits or special permits, fees, and licenses for subcontractor's work are included in subcontractor's scope. 11. subcontractor is responsible for layout required to perform subcontractor's scope of work. it shall also be the responsibility of the subcontractor to maintain and preserve all stakes and other control established by contractor or owner. if control or stakes are destroyed by subcontractor, they will be replaced at subcontractor's expense. 12. any cutting, core-drilling, access, cleanup, patching, repair, filling, disposal, etc. as required to install subcontractor's work is included in this scope of work. 13. subcontractor shall comply with contractor's safety standards / osha guidelines. contractor will correct unaddressed life- threatening safety issues at subcontractor's expense without written notice. 14. subcontractor is responsible for daily cleanup of its work. 15. subcontractor is responsible for the safety, security, and protection of its work, tools, equipment, and materials. 16. demolition (if applicable) will be done in a professional manner in accordance with industry standards. salvage all materials as indicated to be either stored or reused as required per subcontractor's scope of work. 17. each subcontractor will be responsible for sealing penetrations through walls, slabs, floor, and roofs so as to make water- tight, acoustically sealed, security proof as required, and/or to maintain the applicable smoke or fire ratings. 18. each subcontractor is responsible for placement of his embeds, sleeves, blockouts, and penetrations in walls, slabs, beams in accordance with the contract documents, with special attention to be paid to structural requirements. – as applicable · 132 m away
- 4849 Greenville AveNov 17, 2026Mcr tenant improvement · 138 m away
- 4849 Greenville Avenue · US Energy Square, LLCJul 8, 2024Cbiz gibraltar — renovation/alteration — tenant improvement · 138 m away
- 4849 Greenville Avenue 10th · US Energy Square, LLCJul 9, 202410th floor corridor and restroom — renovation/alteration — capital improvement · 138 m away