4930 Greenville Ave
Dallas, TX 75206
Electrical service repairs permitted at 4930 Greenville Ave
A commercial electrical permit filed July 27, 2026, covers relocating the meter base to the building exterior and installing a new 320-amp meter base and 400-amp disconnect. The work also includes new feeders and reworking the grounding after a garbage truck damaged Oncor equipment.
Summarized from City of Dallas records · updated Jul 27, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jul 27, 2026
- since Jul 27, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectOncor's drop and one of the feeders were damaged by a garbage truck. service needs to be disconnected for repair, but oncor requires the meter base to be relocated to the exterior of the building.we are installing a new 320-amp meter base and a new 400-amp fusible disconnect on the exterior, installing new parallel feeders, and reworking grounds to the new first means of disconnect
Oncor's drop and one of the feeders were damaged by a garbage truck. service needs to be disconnected for repair, but oncor requires the meter base to be relocated to the exterior of the building.we are installing a new 320-amp meter base and a new 400-amp fusible disconnect on the exterior, installing new parallel feeders, and reworking grounds to the new first means of disconnect
City of Dallas permitCommercial Electrical Permit
Sources: City of Dallas
Questions about 4930 Greenville Ave
What is being built at 4930 Greenville Ave?
A City of Dallas electrical permit covers repairs to the building's electrical service, including a relocated meter base, a new disconnect, new feeders and grounding work. The permit description says the work follows damage from a garbage truck.
When was the electrical work at 4930 Greenville Ave permitted?
The City of Dallas filed commercial electrical permit COM-ELC-26-003368 on July 27, 2026.
Why is the meter base being relocated at 4930 Greenville Ave?
The permit says a garbage truck damaged Oncor's service drop and one feeder. The meter base must be moved to the building exterior for the service to be disconnected and repaired.
What electrical work is covered by permit COM-ELC-26-003368?
The permit describes a new 320-amp meter base, a new 400-amp fusible disconnect, new parallel feeders and reworked grounds.
What's happening near Atelier Yoga on Greenville Avenue?
At 4930 Greenville Ave, a commercial electrical permit filed July 27, 2026, covers repairs to the building's electrical service. Atelier Yoga is listed at 4912 Greenville Ave, 48 meters away.
Also being built nearby
All of 75206- 4914 Greenville AveMay 4, 2026Gas test · 40 m away
- 4912 Greenville AveMar 19, 2026Install 2 3-ton package units, install all ductwork, install drain lines, install exhaust fans in restrooms · 48 m away
- 5010 Greenville AveJul 27, 2026New 5 ton split system · 64 m away
- 4908 Greenville Ave · Veery Green LLCJan 6, 2026Install mini split system · 64 m away
- 4925 Greenville AveNov 16, 2026Mcr at some point over the years, suites 700 and 720 were joined into one suite (with no building permit or a change to the certificate of occupancy. a new tenant is moving into the suite, as suite 720. no current work is taking place. this permit is for recording the changes that were made at some point prior to now · 86 m away
- 4925 Greenville AveFeb 23, 2026Adding stage power & vendor power next to stage · 86 m away
- 4925 Greenville Avenue · US Energy Square, LLCJul 7, 2025Arco / murray expansion — renovation/alteration — interior renovation of existing office space in a high rise building · 86 m away
- 4925 Greenville Avenue · US Energy Square LLCNov 19, 2025Five states energy — renovation/alteration — renovation of existing 8,604 square foot interior office space · 86 m away
- 5030 Greenville Ave · 5030 Greenville Ave, LLCJun 27, 2025Interior remodeling the subcontract agreement covers the furnishing of tools, equipment, materials, supplies, engineering, scaffolding, incidentals, labor, supervision, cleaning, services, insurance, warranties, testing, and/or any other act or thing required to diligently and fully perform and complete the portions of work described herein. 2. in addition to the foregoing, it is further understood and agreed that this subcontract agreement also includes, but is not limited to, the following conditions and items, regardless of whether or not they are in listed contract documents. the items listed below are not intended to represent each and every item necessary to perform the work. 3. all deviations from or discrepancies to the contract documents must be brought to the immediate attention of the contractor in writing with sufficient details, references, and explanations to permit proper analysis. suggested solutions or substitutions shall accompany the notification whenever possible. 4. all work shall meet or exceed any and all applicable local, city, state, or federal codes and guidelines. 5. the subcontractor shall set up, arrange, coordinate, and obtain all inspections for its work as required by any authorized agency or applicable code. arrangements for the inspection of any area, system, equipment, etc., that are in need of testing or inspection prior to being covered up must be made by the subcontractor in sufficient time to allow for inspections so as not to impact the project schedule. in the event of low or substandard test results, the subcontractor shall be responsible for all costs involved in retesting of the materials/work in question and the replacement of inadequate materials/work. 6. subcontractor is responsible for providing certifications and licensing as required. 7. subcontractor is responsible for all fees 8. subcontractor is responsible for taxes 9. subcontractor shall provide competent personnel supervision at all times while on site and during your contracted trade inspections ($250.00 associated fee for each absence). 10. contractor shall provide general building permit. all other permits or special permits, fees, and licenses for subcontractor's work are included in subcontractor's scope. 11. subcontractor is responsible for layout required to perform subcontractor's scope of work. it shall also be the responsibility of the subcontractor to maintain and preserve all stakes and other control established by contractor or owner. if control or stakes are destroyed by subcontractor, they will be replaced at subcontractor's expense. 12. any cutting, core-drilling, access, cleanup, patching, repair, filling, disposal, etc. as required to install subcontractor's work is included in this scope of work. 13. subcontractor shall comply with contractor's safety standards / osha guidelines. contractor will correct unaddressed life- threatening safety issues at subcontractor's expense without written notice. 14. subcontractor is responsible for daily cleanup of its work. 15. subcontractor is responsible for the safety, security, and protection of its work, tools, equipment, and materials. 16. demolition (if applicable) will be done in a professional manner in accordance with industry standards. salvage all materials as indicated to be either stored or reused as required per subcontractor's scope of work. 17. each subcontractor will be responsible for sealing penetrations through walls, slabs, floor, and roofs so as to make water- tight, acoustically sealed, security proof as required, and/or to maintain the applicable smoke or fire ratings. 18. each subcontractor is responsible for placement of his embeds, sleeves, blockouts, and penetrations in walls, slabs, beams in accordance with the contract documents, with special attention to be paid to structural requirements. – as applicable · 94 m away
- 5111 Greenville Avenue · Westwood FinancialJul 12, 2024Activate games - highland park — renovation/alteration — tenant improvement project involves 10,426 sq ft within an existing building. the proposed work involves constructing game rooms, restrooms, new partitions, ceilings, lighting, hvac, and finishes · 138 m away
- 5111 Greenville Ave · Westwood FinancialJul 23, 2025Repair sewer line · 138 m away
- 5646 Milton Strett · US Energy Square, LLCApr 13, 2026On partners — renovation/alteration — 3,309 sq ft of tenant improvement · 141 m away